This Solicitation opportunity from Maryland was posted on November 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
W801401 - Crofton Meadow II WTP Expansion - Phase II
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves expanding the existing Crofton Meadow II Water Treatment Plant in Maryland from a capacity of 15 million gallons per day to a nominal 20 million gallons per day. The scope encompasses constructing new aerators, flocculation and sedimentation basins, filters, a thickener, a clearwell, and upgrading the high lift pumping station, along with installing backup generators, modernized chemical systems, yard piping, dewatering, grading, paving, landscaping, and all necessary site work. The project requires furnishing and installing all equipment, materials, labor, structures, piping, test pits, testing, accessories, and appurtenances to deliver a fully operational facility. The work must meet applicable industry standards and comply with prevailing wage requirements, with the project scheduled to commence after the solicitation period, which runs from November 3, 2025, to December 9, 2025. The solicitation is issued by Anne Arundel County, Maryland, under NAICS code 221310, with an estimated contract value between 50 million and 100 million dollars. Interested vendors are directed to submit proposals electronically in PDF format through the county’s procurement portal by the deadline, with inquiries directed to Kim Lee. The project documents include a comprehensive project manual and multiple drawing sets, though detailed contract clauses, evaluation criteria, and specific contractual requirements are not included in the available excerpts. The work is to be performed at the existing plant site, with inspection and acceptance occurring on-site, and payment terms set at net 30 days upon satisfactory completion. Overall, the contract aims to enhance water treatment capacity and infrastructure resilience through a fully integrated construction effort, adhering to federal and local standards.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Strategic Plan Development and FacilitationOpen now, due in 25 days
- Operations and Maintenance of Small Drinking Water Systems (O. Reg. 319-08) - Community WellsOpen now, due in 22 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
