This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W91237-26-R-A013; Fishtrap Lake Intake Structure and Dam Rehab

Closed
W9123726RA013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Huntington District, is seeking a firm-fixed price construction contract to rehabilitate the intake structure and dam at Fishtrap Lake in Shelbiana, Kentucky. The scope of work includes full removal and replacement of critical components such as the intake structure air circulator, water pump, roof damper motor, sluice gate level monitors, line shafts, couplings, bearings, brake wheels, motor control center, electrical wiring, and distribution equipment, as well as installation of an E-Stop circuit for hydraulic pumps. The existing electrical system is a 12 KV open delta configuration supplied by Kentucky Power Company, with accessibility constraints due to its hillside location. The contract also includes four optional work packages: Option 1 allows for the disassembly, rehabilitation, and replacement of service and low flow gate cylinders, Option 2 covers comprehensive crane rebuilding including motors, wiring, controls, and painting, Option 3 requires full replacement of the elevator’s power and control systems, and Option 4 permits full replacement of all three service gate cylinders in place of rehabilitation, but cannot be combined with Option 1. All work must comply with specified product standards and contract plans. The solicitation, numbered W9123726RA013, will be available on SAM.gov beginning July 29, 2026, and all proposals must be submitted electronically through the PIEE Solicitation Module by 5:00 p.m. Eastern Time on the same date. Paper, email, or USB submissions will not be accepted. Eligible offerors must be registered in the System for Award Management (SAM) and comply with all federal requirements, including the mandated notarized letter for entity administrators since April 2018. The NAICS code for this procurement is 237990, and the place of performance is in Shelbiana, Kentucky. Primary points of contact are Lillie V. Bodie and Danielle L. Roar of the U.S. Army Corps of Engineers. Prospective contractors are advised to initiate SAM registration well in advance, as processing may take several weeks, and should consult the Federal Service Desk for assistance. A site visit will be scheduled at a later date, with full details provided in the official solicitation documents.

General Info

Rehabilitate Fishtrap Lake dam intakes and electrical systems; optional crane, cylinder, elevator upgrades; SAM registration required.

Agency

Department Of Defense → W072 Endist HuntingtonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Fishtrap Lake 2204 Fishtrap RoadShelbiana, Kentucky 41562, Shelbiana, KY, 41562, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts1 person available
OfficeHUNTINGTON, WV, 25701-5000, USA
Organization / Agency
Department Of Defense → W072 Endist Huntington
View Agency Profile
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more

The U.S. Army Corps of Engineers, Huntington District intends to procure a contract for an intake structure and dam rehab at Fishtrap Lake in Shelbiana, Kentucky. The award of one firm-fixed price construction contract is anticipated.



The Contract includes, but is not limited to, furnish all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to Fishtrap Lake, Intake Structure and Dam Rehab. The Contractor shall complete the work in accordance with appropriate product specifications, industry standards, and contract work order plans and specifications.



The current electrical commercial power source is a 12 KV distribution line owned by Kentucky Power Company (KPC). The existing line is located on the hillside and is not accessible by KPC boom trucks.


The existing line is an “open delta” configuration, meaning that there are only two phases present instead of the normal three phases. In the open delta configuration, the third phase is derived at the stepdown service transformers.



The contract includes the following work tasks:



Base


  1. Removal and replacement of the Intake Structure Air Circulator.
  2. Removal of the Intake Structure Water Pump.
  3. Installation of the roof damper motor.
  4. Removal and replacement of four sluice gate level monitors.
  5. Removal and replacement of new line shafts, line shaft couplings, bearings, and brake wheels and shoes.
  6. Removal and replacement of the Motor Control Center.
  7. Removal and replacement of wiring.
  8. Installation of an E-Stop circuit wiring for the hydraulic pumps.
  9. Removal and replacement of the electrical distribution equipment.


Option 1 (Cylinder Rehab)


  1. Disassembly and removal of the three (3) service gate cylinders and one (1) low flow gate cylinder. One new service gate cylinder will be fabricated and installed in place of one of the existing service gate cylinders. The other two cylinders and the low flow cylinder will be rehabbed and reinstalled. If enacted, Option 1 must be awarded alongside the Base Contract. See Option 4 or work in lieu of this task.


Option 2 (Crane Rehab)


  1. Removal and replacement of the existing motors, bearings, brakes, wiring, controls, rail clips, bumpers, wire rope, lubricants, grease fittings, couplings, hardware, festoon, lights, and limit switches.
  2. Rebuilding of the hook block.
  3. Cleaning and painting of the crane trolley, bridge, and runway.


Option 3 (Elevator Rehab)


  1. Removal and replacement of all power and control systems for the existing elevator.


Option 4 (Hydraulic Cylinder Replacement)


  1. Replacement of all three service gate cylinders in lieu of rehabilitation. This option will not be awarded in conjunction with but in lieu of Option 1.

The project work will be performed in accordance with directions included herein.




A site visit will be scheduled at a later date. The NAICS code for this procurement is 237990. Solicitation documents will be available on or about 29 July 2026 and can be downloaded at www.sam.gov. Offerors shall submit all documents electronically through PIEE Solicitation Module at www.piee.eb.mil by referencing Solicitation No. W9123726RA013. No paper copies, CD, DVD, thumb drives, email, or facsimile will be accepted. To be eligible for award, a firm must be resisted in System for Award Management (SAM). Register via the SAM internet site at www.sam.gov. Questions may be submitted to Lillie Bodie at lillie.v.bodie@usace.army.mil.



Please note, as of April 2018, GSA’s System for Award Management (SAM) system requires new registrations and renewals of existing registrations to submit an original signed notarized letter identifying the authorized Entity Administrator. The notarized letter is not to be submitted to the Huntington Contracting Office as it is not our requirement. Vendors are encouraged to check their entity’s status in www.SAM.gov and plan accordingly. If the prospective contractor is not registered in the SAM database, the Contracting Officer will follow the procedures in FAR 4.1103. Contact the supporting Federal Service Desk at www.fsd.gov, or by telephone at 866-606-8220 (toll free) or 334-206-7828 (internationally) Monday through Friday from 8am to 8pm EDT, for free assistance. The SAM registration process may take several weeks to process once submitted. Please carefully consider this information when deciding to submit your proposal.



The POC for this procurement is Lillie V. Bodie, lillie.v.bodie@usace.army.mil and Danielle Roar, Danielle.l.roar@usace.army.mil.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 236220
New
Federal
Tom Jenkins Office/Shelter roof replacement
Solicitation # W9123726QA090
Solicitation W9123726QA090 is a total small business set-aside for the removal and replacement of roofing systems at the Tom Jenkins Dam in Glouster, Ohio. The scope of work requires the installation of a new fully adhered white EPDM membrane roof for the office and a new architectural asphalt shingle roof with synthetic underlayment for the shelter. All work must be completed within 60 calendar days from the Notice to Proceed, with a performance period scheduled from September 21, 2026, to November 21, 2026. The project requires a minimum 20-year warranty on both roofs and strict adherence to EM 385-1-1 safety standards and Davis-Bacon wage determinations for Muskingum County. The contract is a firm-fixed-price arrangement with an estimated value between 100,000 and 250,000 dollars. Award will be granted to the lowest price offeror who meets all technical requirements and is deemed responsible. Key administrative updates via Amendment 0004 have removed the requirement for performance and payment bonds and modified applicable FAR clauses. All proposals must be submitted electronically through the PIEE Solicitation Module by September 15, 2026. The contractor is responsible for providing a site-specific Abbreviated Accident Prevention Plan and maintaining a quality control system to ensure all materials are new and installations are leak-free.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 332312
New
Federal
Miter Gate Rack Arm Fabrication for Captain Anthony Meldahl Lock and Dam
Solicitation # W9123726QA084
Solicitation W91237-26-Q-A084 is a request for a firm-fixed price supply contract issued by the U.S. Army Corps of Engineers, Huntington District, for the fabrication and delivery of one rack arm assembly for the Captain Anthony Meldahl Lock and Dam in Felicity, Ohio. The scope of work includes the fabrication of one rack, one rack support, and all associated appurtenances according to contract drawing 22/5. This is a supply-only procurement, meaning the contractor is responsible for fabrication, assembly, and testing, while the government will handle the final installation. The award will be based on the lowest price among offers that meet all technical requirements, and the project is designated as a total small business set-aside under NAICS code 332312. Key requirements include the submission of detailed shop drawings for approval and the implementation of a quality control system. Final shop assemblies must be witnessed by a government inspector, and the contractor must provide 14 days' notice prior to final testing. The delivery is required within 180 calendar days from the date of award, with terms set as FOB Destination. Packaging must adhere to strict standards for long-term storage, including the use of rust preventatives, weathertight wooden crates, and marking in accordance with MIL-STD-130 and MIL-STD-129. All responses must be submitted electronically via the PIEE Solicitation Module in a searchable PDF format.
Fabricated Structural Metal Manufacturing

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Bolivar Dam Gatehouse Roof Replacement
Solicitation # W9123726QA073
Solicitation W9123726QA073 is a sealed bid invitation for a total small business set-aside construction project to replace the roof membrane of the Intake Structure Building at Bolivar Dam in Bolivar, Ohio. The contractor is responsible for providing all personnel, equipment, transportation, and materials required to remove and dispose of the existing membrane, gravel, and reglet flashing, and install a new 3,060 square foot roofing system. Specifications require the use of Johns Manville 060 PVC single-ply white membrane or an equivalent, along with two layers of 2.6 inch polyisocyanurate insulation board. The project must be completed within 60 calendar days from the issuance of the Notice to Proceed, which is contingent upon the approval of bonding, insurance, security clearances, and an Accident Prevention Plan. The contract is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and federal mandates for paid sick leave and minimum hourly wages. Safety compliance is mandatory according to OSHA 29 CFR 1910 and 1926, as well as the U.S. Army Corps of Engineers EM 385-1-1 manual. Administrative requirements include active registration in the System for Award Management and compliance with Buy American and cybersecurity standards, including CMMC level requirements. Proposals must be submitted through the PIEE Electronic Quote Submissions portal by the deadline of September 14, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS