Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W9123726QA100 - Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and Dam

Closed
W9123726QA100Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc., operated for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches in the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana, to address safety deficiencies regarding rotating equipment. Key deliverables include the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, FNC guidelines, and applicable state, local, and national building codes. The award will be based on Best Value, with evaluation weights assigned to Price (60), Quality (20), Past Performance (10), and Schedule (10). Interested offerors must provide a single lump sum bid with a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and proof of a valid Indiana Contractor's License. Required certifications include Small Business status and compliance with Davis-Bacon Act wage rates. The project includes a one-year workmanship guarantee, Net 30 payment terms, and strict adherence to center security regulations, including prohibitions on firearms, drugs, and alcohol. A mandatory site visit is scheduled for November 10, 2026, with a proposal deadline of November 20, 2026.
Atterbury Job Corps. – Adams & Associates

POSTED

35 minutes ago

DEADLINE

in 21 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to improve safety, and conducting comprehensive oil testing analysis. All work must adhere to NETA MTS, IEEE, and NFPA 70E safety protocols, with oil sampling following ASTM D923 standards. Key deliverables include annotated infrared images, written condition assessment reports with corrective action recommendations, standard operating procedures, and on-site training for up to 20 agency staff members. The agency intends to make a single award to the most capable offeror based on their past performance, personnel experience, staffing plan, and cost-effectiveness. Qualified proposers must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. The contract will utilize fixed pricing with a not-to-exceed total value. Performance will take place across multiple agency locations, including RP-1, RP-2, RP-4, RP-5, CCWRF, and CDA. Payment will be processed electronically via ACH within 30 days of invoice approval, with early payment discounts available for invoice reductions.
Inland Empire Utilities Agency

POSTED

35 minutes ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project, with an estimated value between $25,000 and $100,000, requires a qualified electrical contractor to inventory, functionally test, repair, and certify emergency lighting systems in compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. Key deliverables include the application of durable tracking labels to fixtures, integration of maintenance requirements into the operator's Computerized Maintenance Management System, and the provision of hazardous material disposal certificates and warranties. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, as well as performance and payment bonds upon award. The contract is subject to the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and FAR clauses regarding work hours, safety standards, and small business certifications. Award decisions will be based on overall best value.
Management & Training Corporation/Centennial Job Corps Center

POSTED

35 minutes ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation W9123726QA100 is a Firm Fixed Price contract issued by the Department of Defense, specifically the W072 Endist Huntington, for the replacement of the Bulkhead Crane bus rail system at the Captain Anthony Meldahl Locks and Dam in Felicity, Ohio. This total small business set-aside requires the contractor to provide all labor, equipment, and materials to remove the existing system and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, with each bar measuring approximately 1,400 feet. The scope includes installing eight new collector shoes and electrical expansion couplings, as well as repairing or replacing roughly 50 percent of the protective bus rail covers and supports. All work must adhere to the National Electrical Code and USACE EM 385-1-1 safety standards, and the contractor must provide journeyman-level electricians with at least five years of industrial hoisting experience. The period of performance is scheduled from October 12, 2026, to February 9, 2027, with all work to be completed within 120 calendar days of the Notice to Proceed. Award will be based on the lowest price technically acceptable (LPTA) criteria. Final acceptance is contingent upon the crane being operated by the Government for a minimum of five full-length travels of the dam to verify operational status. The contract is subject to the Davis-Bacon Act for wage determinations and requires offerors to maintain active registration in the System for Award Management. Proposals must be submitted via the PIEE system, and a site visit is highly encouraged.

General Info

DoD firm fixed price contract to replace Bulkhead Crane bus rail system in Ohio.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

CPT A MELDAHL LD HUNTINGTON DIST, 2443 US 52, FELICITY, OH 45120-9717, WV, 45120

Set-Aside

NONE

Documents

5

Corps of Engineers As-Builts - Various Plans and Elevations

PDF, High priority: read this firstspecifications
High

Meldahl Locks and Dam - Bulkhead Crane Bus Rails Replacement SOW

PDF, High priority: read this first9 pages · sow
High

OH20260001 - Ohio Heavy and Highway Wage Determination

PDF, High priority: read this first39 pages · wage-determination
High

W9123726QA1000001 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

W91237A100 - Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and Dam

PDF, High priority: read this first61 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 21, 2026 to Sep 23, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts1 person available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more
This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, approximately 1,400 feet per bar, including associated hardware, eight (8) new collector shoes, and electrical expansion couplings. Repair or replace approximately 50 percent of the existing protective bus rail covers, supports, and associated hardware, and modify existing covers as necessary to provide complete coverage of the new bus rail system.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
Solicitation # W9123726RA020
Solicitation W9123726RA020 is a new acquisition by the Department of the Army, Huntington District, for the rehabilitation of the intake structure and dam at Fishtrap Lake in Shelbiana, Kentucky. The scope of work includes providing all labor, materials, and supervision for electrical and mechanical replacements, specifically the manufacturing of one new service gate cylinder and the rehabilitation of two service gate cylinders and one low flow gate cylinder. The contract includes four optional components: cylinder rehabilitation, crane rehabilitation, elevator power and control system replacement, and full replacement of all three service gate cylinders. The base contract must be completed within 270 calendar days of the Notice to Proceed, with various options extending the period of performance up to 450 days. Proposals are evaluated based on past performance, a small business participation plan, and cost/price reasonableness. Submissions must be delivered in searchable PDF format via the PIEE Solicitation Module. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates for Pike County, Kentucky, and must adhere to USACE EM 385-1-1 safety standards, including the submission of an Accident Prevention Plan and a critical lift plan. Performance and payment bonds are required for bids exceeding 150,000 dollars. Hazardous materials handling must comply with DOT and EPA standards, and all elevator work requires certification by a third-party Qualified Elevator Inspector.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS