Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 19, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rehabilitation Effort for the Panama City Beaches Coastal Storm Risk Management Project, Panama City Beach, Florida

Awarded
W9127820B0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 17 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Contract W9127820B0004 is an unrestricted Invitation for Bid issued by the Department of Defense through the U.S. Army Engineer District Mobile for the Rehabilitation Effort for the Panama City Beaches Coastal Storm Risk Management Project in Panama City Beach, Florida. Classified under NAICS code 237990, the project focuses on waterway and marine construction, specifically involving dredging and beach fill operations. The scope of work is supported by extensive technical drawings and specifications covering site plans, dredge plans, and berm construction sections, while adhering to the EM 385-1-1 Safety and Health Requirements Manual. The procurement process included several critical modifications and extensions. Amendments updated the bidding schedule, revised technical specifications, and added vibration monitoring requirements. Specifically, Amendment 0002 updated geotechnical boring logs and lab data for Borrow Area S1A. The bidding timeline was further impacted by Hurricane Sally, leading to a special notice and subsequent extensions of the proposal receipt date to ensure contractor compliance and safety. The final coordination involved updated SF1442 forms and revised explanations of bid items to refine the project's execution requirements.

General Info

Contract Value

$61,235,519.48

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Panama City Beach, FL, USA

Set-Aside

NONE

Award Issued Date

Documents

9

W9127820B0004-0001: Panama City Beaches Coastal Storm Risk Management Project

PDF, High priority: read this firstamendment
High

W9127820B0004-0002: Panama City Beaches Coastal Storm Risk Management Project

PDF, High priority: read this firstamendment
High

W9127820B0004 AM02 Drawings - Panama City Beaches Coastal Storm Risk Management

PDF, High priority: read this firstspecifications
High

W9127820B0004 Amendment 0003 - Panama City Beaches Coastal Storm Risk Management

PDF, High priority: read this firstamendment
High

W9127820B0004 - EM 385-1-1 Reference

PDF, High priority: read this firstspecifications
High

W9127820B0004 - Panama City Beaches Coastal Storm Risk Management Drawings Vol 2

PDF, High priority: read this firstspecifications
High

W9127820B0004 - Panama City Beaches Coastal Storm Risk Management Project Drawings Vol 1

PDF, High priority: read this firstspecifications
High

W9127820B0004 - Rehabilitation Effort for Panama City Beaches Coastal Storm Risk Management Project

PDF, High priority: read this firstifb
High

W9127820B0004 - Special Notice Hurricane Sally Impacts

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

14 updates
PhaseAwarded
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Presolicitation. The response deadline was removed. The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice type changed from Presolicitation to Special Notice. Response deadline added: May 25, 2020. The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice type changed from Special Notice to Solicitation. Response deadline changed from May 25, 2020 to Sep 10, 2020. The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from Sep 10, 2020 to Sep 17, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 17, 2020 to Sep 25, 2020.

Deadline changed

Response deadline changed from Sep 25, 2020 to Dec 24, 2020.

Deadline changed

Response deadline changed from Dec 24, 2020 to Jan 19, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA

Full Description

Show more
THIS IS A PROJECT LABOR AGREEMENT SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers, Mobile District, is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large scale construction project (exceeding $25 million) at Panama City, FL. This market survey is being posted for the Rehabilitation Effort for the Panama City Beaches Coastal Storm Risk Management Project, Panama City, Florida (Bay County). Description of Work: The characteristics of the work to be performed for the rehabilitation of Panama City Beach consist of dredging and sand placement activities. Sand for the rehabilitation of Panama City Beach will be dredged from a borrow site. It is anticipated that all work will be constructed by dredging contractors utilizing primarily hopper dredges. This work includes the replenishment of soft features (beach fill). The quantity of soft feature restoration is calculated as the amount of material necessary to restore the volume loss of approximately 656,000 cubic yards (cy) of material from Hurricane Michael as determined by pre-storm (May 2018) and post-storm (November/December 2018) surveys within the Coastal Storm Risk Management (CSRM) Project limits. The additional volume required to restore to the full project profile (Design Template), which is defined as the authorized beach profile of the project in a fully nourished state, is estimated at approximately 505,000 cy. In addition to the required design volume, the renourishment plan for construction also includes additional material to account for erosion losses expected to occur between the post storm surveys and the anticipated project construction date, as well as overfill material if the fill has a smaller median grain size than the native beach. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Accordingly, Offerors are requested to respond to this Special Notice regarding PLA with the following information: (1) Should PLAs be executed on selected large dollar contracts in Panama City, FL, and surrounding areas? (2) Are there concerns by prime contractors on the availability of skilled construction labor? (3) Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? (4) What type of project should not be considered for PLA clauses? (5) What is the time impact to the completion of the contract due to a PLA? (6) What is the cost impact to the bid due to a PLA? (7) What other factors should the Corps consider before deciding to include PLA provisions in a Mobile Engineer District contract? (8) Please provide a list of recent (2-5 years) construction projects in the local labor market of the project under consideration. Include the following items: Project Name/Location; Project Description; Initial Cost Est/Actual Final Cost; Was the project completed on time?; Number of craft trades present on the project; PLA (Y/N); Were there any challenges experienced during the project? (9)Which trades are expected to be employed on this project? Are you likely to need some union skilled trades for at least part of this project? (10) What market share does union labor have in the geographic area for this project or type of construction? (11) Does the local market contain the sufficient number of available skilled workers for this project? Are there other projects in the vicinity going to limit the pool of skill labor available for your project? (12) Has a project like this been done before in the local market? (13) What investments have been made to support registered apprenticeship programs? (14) Have PLAs been used on comparable projects undertaken by the public sector in this geographic region? Have PLAs been used on this type of project in other regions? (15) Which CBAs are likely to expire during the course of the project under consideration that might cause delays? (16) How do open shop and union wage rates influence prevailing wage rates in the local market and compare to Davis Bacon rates? What impact does unionization in the local market have on wages? (17) Could a PLA contribute to cost savings in any of the following ways? -Harmonization of shifts and holidays between the trades to cut labor costs? -Minimization disruptions that may arise due to expiration of CBA? -Availability of trained, registered apprentices, efficient for highly skilled workforce? -Allowing for changes in apprentice to journeyman ration. -Serving as management tool that ensure highly skilled workers from multiple trades are coordinated in the most efficient way. -Others? (18) Could a PLA minimize risk and contribute to greater efficiency in any of the following ways? -Mechanisms to avoid delays -Complying with Davis Bacon and other labor standards, safety rules and EEO and OFCP laws. -Ensuring a steady supply of skilled labor in markets with low supply or high competition for workers. (19) Are there ways in which a PLA might increase costs on this particular project? Interested Offerors shall respond to this Special Notice no later than 25 May 2020. E-mail your response to contact@example.gov and contact@example.gov with subject line W9127820B0004 PLA. This Special Notice is not to be construed as a commitment by the Government, nor will the Government pay for the information solicited.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
Solicitation W9127826RA087 is an unrestricted, two-phase, design-build construction project issued by the U.S. Army Corps of Engineers, Mobile District. The project involves the construction of a multi-level Operations Division office building for the Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work encompasses all necessary labor, equipment, and materials for site work, utilities, and environmental remediations, ensuring compliance with Department of War, U.S. Federal, and partner nation codes. The project has an estimated value between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars; any proposal exceeding this limit will be deemed non-responsive. The anticipated completion period is 545 days. The procurement process is divided into two phases, with Phase One focusing on the evaluation of proposals to select a maximum of five firms for Phase Two, where detailed design requirements will be provided. Award will be based on a non-price/price trade-off analysis to determine the best value, prioritizing the design concept, preliminary schedule, and small business participation. Key requirements include a 100 percent performance bond, adherence to EM 385-1-1 safety standards, and the provision of a specialized design-build team including a Design Quality Control Manager. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS