Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on May 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Walker Road Water Main Replacement

Closed
PE-66972-NONST-2024-000000001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Nahunta is inviting sealed bids for the Walker Road Water Main Replacement project, with bids due by June 3, 2024, at 1:30 P.M. at the Byron Municipal Complex in Byron, Georgia. The project involves installing approximately 15,200 linear feet of 6-inch PVC water main along Walker Road to replace the existing line, including the installation of new fire hydrants, gate valves, and other necessary appurtenances, all in accordance with provided specifications and construction drawings. Digital copies of the construction plans and technical specifications are accessible online, with free viewing available through creating a Quest account, or downloadable for a fee of $250. The project is partially funded by federal EPA funds, subjecting it to applicable federal regulations. The owner reserves the right to reject any bids that are nonconforming, unresponsive, unbalanced, or conditional, and may reject bids from bidders deemed unqualified or not in the best interest of the project. The contract is estimated to be valued between $500,000 and $1,500,000, and interested bidders can contact Jared Wozny at Carters Loops for further information.

General Info

Documents

1

Walker Road Water Main Replacement Advertisement for Bids

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66972 BYRON, PE-66972-NONST-2024-000000001 to PE-66972-NONST-2024-000000001.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Nahunta
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Nahunta
Office AddressN/A

Full Description

Show more
-Contact C&S for unabbreviated Advertisement. -Sealed bids for construction of the Walker Road Water Main Replacement will be received until June 3, 2024 at 1:30 P.M. at the Byron Municipal Complex, 401 Main St. Byron, GA 31008, at which time and place they will be publicly opened and read aloud. The Work will be awarded in one (1) Contract. -Project Scope: The project shall include furnishing all products and performing all labor necessary to construct the following: installation of approximately 15,200 L.F. of 6 PVC Water Main along Walker Road to replace existing water line along the same route, along with installation of new fire hydrants, gate valves, and all other appurtenances necessary to complete the project in accordance with specification and construction drawings. -Complete Digital Construction Plans, Technical Specifications, and Contract Documents are available at www.cartersloope.com/outforbid. Bidders may view the digital plan documents for free by creating a Quest account and entering the Quest project number 9112292 on the website¿s project search page. Bidders can download the digital documents for a fee of $250.00 for PDF file payable through the website. -This project will be partially funded with Federal funds from the United States Environmental Protection Agency and therefore is subject to the Federal laws and regulations associated with that program. -Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS