Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Warehouse Fan Bldg. 10904

Closed
FA301625Q0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
BLOWER UNIT, AIR FILTER
Solicitation # SPE8E5-27-Q-0031
Solicitation SPE8E5-27-Q-0031 is a firm fixed price contract issued by the DLA Troop Support Construction and Equipment office for the procurement of 53,000 blower units for air filtering respirators, identified by NSN 4240-01-655-6330. The award will be based on the best value offer determined by the total award price, including both production and First Article Test (FAT) costs. Delivery is scheduled for 240 days after award for the primary units, with a separate 100-day delivery window for specific line items. Inspection and acceptance are conducted at the origin, with the final delivery destination being the DLA Distribution facility in New Cumberland, Pennsylvania. This procurement is designated as Chemical Biological Defense Equipment and carries stringent quality and security requirements. Contractors must adhere to CMMC Level 2 certification and safeguard covered defense information. Technical compliance is governed by specific reference drawings and Quality Assurance Provisions, with a strict prohibition on the use of class I ozone depleting chemicals. The contract requires rigorous testing, including First Article Testing and Production Lot Testing, and mandates military packaging and marking in accordance with MIL-STD-2073-1 and MIL-STD-129. Additionally, the contract incorporates Buy American and Balance of Payments Program regulations and requires the use of the Wide Area WorkFlow system for all electronic invoicing and payment requests.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 18 hours ago

DEADLINE

in 6 days
NAICS: 333413
New
DIBBS
FAN, TUBEAXIAL
Solicitation # SPE8E7-27-T-0122
Solicitation SPE8E7-27-T-0122 is a fixed-price contract issued by DLA Troop Support, Construction and Equipment for the procurement of seven tubeaxial fans, NSN 4140-00-289-8826. These critical application items must operate at 115 volts AC, 60 Hz, single phase, and comply with MIL-PRF-18953. A Qualified Products List applies, requiring the manufacturer to be QPL approved at the time of contract award. Technical requirements are further governed by TDP Rev A Gen 1 and reference drawing 75477 FF16085 Revision E. The contract specifies a delivery timeframe of 195 days, with a need ship date of May 3, 2027, and a required delivery date of August 27, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, DLA Distribution San Joaquin in Tracy, California. Packaging must adhere to MIL-F-18953 and MIL-STD-2073-1E, with marking per MIL-STD-129 and palletization per RP001, while avoiding plastics for wrapping or cushioning where possible. Administrative requirements include the use of Wide Area WorkFlow for invoicing and receiving reports. Offerors must be registered in the System for Award Management and comply with NAICS code 333413. The contract incorporates several federal regulations, including FAR 52.246-1 for destination inspection, DFARS 252.204-7012 for safeguarding covered defense information, and various domestic material restrictions such as the Buy American Act and the Berry Amendment. Additionally, the use of additive manufacturing for these parts is prohibited unless specifically authorized.
DLA DIST SAN JOAQUIN

POSTED

about 18 hours ago

DEADLINE

in 2 days
NAICS: 333413
New
International
GE BOOTH WATER RESOURCE RECOVERY FACILITY (WRRF) THERMAL OXIDIZATION UNIT 2 (TOX2) AIR POLLUTION CONTROL DEVICE (APCD) PREPURCHASE, PROJECT 42-0613
Solicitation # 2026-468P
The Region of Peel is seeking a qualified vendor for the prepurchase of Air Pollution Control Device (APCD) equipment for the GE Booth Water Resource Recovery Facility Thermal Oxidization Unit 2, identified as Project 42-0613. This procurement, solicitation number 2026-468P, is conducted in accordance with CETA, CFTA, and other applicable trade agreements. The scope of work encompasses the supply, delivery, and commissioning of the equipment, including performance testing and the provision of comprehensive operations and maintenance data. Equipment must be ready for delivery by Q4 2027 on an FOB Destination basis to either the facility or a designated warehouse in the Greater Toronto Area. The selection process follows a staged evaluation totaling 100 points, consisting of a pass/fail compliance review, a technical proposal weighted at 70 points with a minimum threshold of 42, a financial proposal at 20 points, and a Domestic Supply Chain Plan at 10 points. Bidders must submit electronic proposals in PDF format by November 11, 2026, including mandatory uploads such as technical attributes, installation lists, resumes for project managers and technicians, and a detailed work plan. Acceptance of the equipment is contingent upon successful delivery, installation, and the completion of a 14-day continuous operating period. Vendors are also required to adhere to strict packaging and marking standards and comply with Ontario and Canadian privacy legislation.
Region of Peel

POSTED

4 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves the provision and installation of a single industrial ceiling fan at Building 10904 on JBSA Lackland for the 344th Training Squadron. The contractor is responsible for supplying all necessary personnel, equipment, and materials to complete the installation in accordance with the specifications outlined in the Statement of Work (SOW) dated August 8, 2024. Key requirements include mounting the fan securely to structural beams with safety cables, following manufacturer installation guidelines, and making electrical connections from the fan to the power panel using electrical conduit and fittings that comply with code standards. The installation must ensure proper support, minimal vibration, and safety, with the fan positioned at least 12 inches below the support beam and centered between vertical beams, with specific placement details provided. Additionally, a ceiling fan control box must be installed near the south entrance/exit door, aligned with existing electrical infrastructure. The solicitation, issued by the Department of the Air Force, specifies a response deadline of December 23, 2024, and provides contact information for project inquiries. The work emphasizes safety, compliance with electrical codes, and precise placement to ensure optimal operation. The NAICS code associated with this project is 333413, indicating a focus on industrial and commercial fan and blower manufacturing. The contract aims to ensure a fully functional, code-compliant ceiling fan system that meets all specified structural and electrical requirements, supporting the operational needs of the training squadron at Lackland.

General Info

Install industrial ceiling fan at Lackland for 344th Training Squadron by January 9, 2025.

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing

Place of Performance

JBSA Lackland, TX, 78236, USA

Set-Aside

SBA

Documents

5

FA301625Q0017 Warehouse Fan Bldg. 10904 RFQ

PDF, High priority: read this first33 pages · rfq
High

JBSA Lackland Bldg. 10904 Industrial Ceiling Fan SOW (8 Aug 2024)

PDF, High priority: read this first3 pages · sow
High

JBSA Lackland Warehouse Fan Bldg. 10904 Q&A - 6 Jan 2025

PDF, High priority: read this first3 pages · q-and-a
High

Salient Characteristics - Warehouse Fan, Bldg. 10904

PDF, High priority: read this first1 page · sow
High

Warehouse Fan Bldg. 10904 - Questions and Answers

DOCX, High priority: read this first2 pages · q-and-a
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Dec 23, 2024 to Jan 9, 2025. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jan 9, 2025 to Jan 13, 2025. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA

Full Description

Show more
Posted Answers to questions that was submitted by 6 Jan 2025. Posted Answers Jan 8, 2025. (see Attached) This Solicitation has been revised with new Proposal date(13 January 2025) and a SITE VISIT scheduled for( 3 January 2025) Please Review all attachments: Statement of Work(SOW) dated 8 Aug 2024. Salent Characterisitces dated 8 Aug 2024 Revised Solicitation Submit any questions and answers on sheet provided The contractor shall provide all personnel, equipment, supplies, tools, materials, and all non-personal services necessary for purchase and to install one industrial ceiling fan in support of the 344th Training Squadron (TRS), at Lackland bldg. 10904 as defined in this Statement of Work (SOW) Offerors shall inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. SPECIFIC REQUIREMENTS: 1.3.1. The industrial ceiling fan shall be mounted to structural beams and shall have safety cables. 1.3.2. The contractor shall hang the industrial ceiling fan with mount from the manufacturer and installed in accordance with manufacturer specifications. 1.3.3. The contractors shall make electrical connections from the industrial ceiling fan to the power panel. 1.3.4. Structural Grade 8.8 bolts shall be used for mounting. 1.3.5. Wiring shall be in electrical conduit (no exposed wires.) 1.3.6. The contractor shall insure that all possible deflection, vibration, torque, and other such detrimental forces are considered, controlled, and eliminated as necessary. 1.3.7. The contractor shall provide and install all metal conduit, fittings, boxes wire, and switches necessary to establish full and necessary electrical circuits and ensure a perfectly working and code compliant ceiling fan system. 1.3.8. Industrial ceiling fan shall have a minimum drop from support beam of 12. 1.3.9. Contractor shall install the Fan (bldg. 10904) on main structural ceiling beam 35 8 from South wall and 75 from the East wall. Fan shall be centered between vertical beams. 1.3.10. Contractor shall install a ceiling fan control box 44 from the east wall next to the current light switch at the south entrance/exit door.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 23 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 4 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS