This Solicitation opportunity from Florida was posted on November 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Warm Mineral Springs Park Historic Renovation, Floodproofing and Site Improvements Construction Manager at Risk
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves comprehensive renovations and improvements at Warm Mineral Springs Park, including historic preservation, floodproofing, and site enhancements on a 21.7-acre site owned by the City of North Port, Florida. The scope encompasses renovating three existing buildings with specific functions: Building A will be conditioned for staff use with floodproofed spaces, Building B will be modified to create family-oriented rooms and a public gathering shaded area, and Building C, the Cyclorama, will be preserved in accordance with historic guidelines, with its roof replaced and floodproofed. Site improvements will feature open-air shower towers and other enhancements, subject to project scale, zoning, and budget constraints. The project budget ranges from $12 million to $14 million, covering design, permitting, and construction costs. The Construction Manager at Risk (CMaR) will collaborate closely with the City’s Engineer of Record and Architect of Record to develop a building program that aligns with the budget. The role may also include preparing exhibits and presenting to the City Commission as needed. Water and wastewater services will be extended from near US 41 through Ortiz Boulevard to support the site improvements. The project aims to balance historic preservation with modern flood mitigation and public amenities, ensuring the renovations meet regulatory and community standards within the specified financial parameters. The contract was publicly solicited with a response deadline of December 3, 2024, and is part of a broader effort to enhance the park’s infrastructure and historic features.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Warm Mineral Springs Historic Renovation, Floodproofing, and Site Improvements will include: • Building A: Conditioned space for Admissions staff, staff restrooms, and a meeting room in a wet floodproofed condition. • Building B: Removal of formerly programmed interior space to provide family-style rooms and a shaded area for public gathering. • Building C: The Cyclorama will be ‘mothballed’ consistent with historic guidelines, the roof replaced and the facility wet floodproofed. • Site improvements will include open-air shower towers, and various other improvements, the extent of which will largely be determined by the scale of the project, zoning requirements and budget constraints. • Water/wastewater services connecting near US 41 through Ortiz Boulevard • This
The City of North Port has established a total project budget of $12,000,000 to $14,000,000, including design services and permitting. .
The project site is located at 12200 San Servando Ave, North Port, Florida on 21.7 acres of City of North Port-owned property. The three (3) existing buildings will be renovated to varying levels, and each wet floodproofed. The CMaR will work with the City of North Port Engineer of Record (EOR), Kimley-Horn, and Architect of Record (AOR), Sweet Sparkman Architects, to establish a building program which will allow the City of North Port to remain within the allocated project budget.
CMaR may be called upon to assist with and/or prepare exhibits as needed, and present to City Commission.
Background:
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
