Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Washington Park Stormwater Capture Project - Engineering Design Services

Closed
2026-RFP-0053State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 13 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract titled "Washington Park Stormwater Capture Project - Engineering Design Services" issued by the City of Pasadena’s Public Works Department aims to address stormwater pollution in compliance with the National Pollutant Discharge Elimination System (NPDES) permit requirements mandated by the California Regional Water Quality Control Board. The project focuses on designing engineering solutions to reduce or eliminate pollutants in urban runoff, particularly from the East Side Storm Drain, Pasadena’s oldest and largest storm drain system that drains approximately 527 acres of urban runoff flowing untreated to the Rubio Wash and the Rio Hondo Channel. This channel frequently exceeds pollutant load limits for bacteria, heavy metals, and other contaminants, highlighting the need for improved stormwater capture and treatment efforts. The City is collaborating with 17 other regional agencies as part of the Upper Los Angeles River Enhanced Watershed Management Program to manage NPDES compliance on a watershed-wide basis. The procurement solicitation, posted in January 2026 with a response deadline in late February 2026, seeks qualified consultants to provide comprehensive engineering design services to develop effective stormwater capture infrastructure at Washington Park. The project requires adherence to specific regulatory and operational standards, including prevailing wage laws, conflict of interest disclosures, anti-lobbying certifications, and adherence to the City of Pasadena’s procurement policies such as non-collusion and equal employment opportunity compliance. Respondents must demonstrate relevant experience with similar projects and comply with technical, security, and legal requirements outlined in City assessments and contracting documents. Key personnel, subconsultants, and organizational transparency disclosures are required to ensure the project meets both technical and fiduciary standards. The overall goal is to leverage the park’s drainage system to reduce pollutant loads entering the Rio Hondo Channel while enhancing water quality and potentially increasing groundwater recharge within Pasadena.

General Info

City of Pasadena seeks engineering design services to capture and treat stormwater, ensuring regulatory compliance.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

15

City of Pasadena Conflict of Interest Disclosure and Certification

PDF, High priority: read this first2 pages · conflict-of-interest
High

City of Pasadena Master Services Contract

PDF, High priority: read this first19 pages · contract-document
High

Declaration of Non-Collusion and Vendor Forms for City of Pasadena Procurement

PDF, High priority: read this first6 pages · declaration-of-noncollusion
High

DoIT Technical Assessment Questionnaire Rev 20210806

XLSX, High priority: read this first5 pages · technical-questionnaire
High

Relevant Experience Form for Bid Submission

PDF, High priority: read this first5 pages · past-performance
High

Washington Park Stormwater Capture Project - Engineering Design Services RFP

PDF, High priority: read this first58 pages · rfp
High

Supplemental FEMA Terms & Conditions v2 (Oct 1, 2024)

PDF, Medium priorityguidance
Medium

City of Pasadena Unique Entity Identifier (UEI) Form

PDF, Low priority1 page · other
Low

Designated Representatives and Key Personnel Form

PDF, Low priority1 page · other
Low

Disqualification Disclosure Questionnaire

PDF, Low priority1 page · disqualification-disclosure
Low

Federal Required Certification Regarding Lobbying

PDF, Low priority1 page · certification
Low

Pasadena Taxpayer Protection Amendment Disclosure

PDF, Low priority1 page · disclosure
Low

Standard Form-LLL Disclosure of Lobbying Activities

PDF, Low priority3 pages · disclosure-of-lobbying-activities
Low

Washington Park Master Park Plan

PDF, Low priorityspecifications
Low

Washington_Park_Feasibility_Study.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Dawn PetschauerStorm Water Program Administrator
Antonio WatsonProject Manager

Interested Companies (52)

PsomasSanta Ana, CA
EntramPORT CHARLOTTE, FL
Craftwater EngineeringPasadena, CA

See All 52 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The National Pollutant Discharge Elimination System (NPDES) permit issued by the California Regional Water Quality Control Board (RWQCB) requires the City to take steps necessary to reduce or eliminate pollution in stormwater runoff. In addition, the City is part of a group of 18 agencies who participate in the Upper Los Angeles River (ULAR) Enhanced Watershed Management Program which addresses NPDES compliance issues as a watershed region rather than as independent municipalities. Water in the Rio Hondo Channel, which is a major tributary of the Upper Los Angeles River, regularly exceeds the Total Maximum Daily Load for bacteria, heavy metals, and other pollutants set forth by the RWQCB. The East Side Storm Drain is the City's oldest and largest storm drain asset, former Woodbury Creek turned channelized conveyance system, continuing from it's origin in Altadena directly through Washington Park, before connecting with several other drains. It drains approximately 527 acres of urban runoff that flows, untreated, to the Rubio Wash and subsequently to the Rio Hondo Channel giving the park the potential to provide a significant water quality and recharge benefit to Pasadena.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS