Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on May 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Waste Water Transfer Pump Station

Closed
24-001 WASState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive maintenance and inspection services for the Smith and Loveless Duplex Pump System at the Waste Water Transfer Station located in Moriah SICF, Mineville, NY. Key tasks include verifying the tolerances and mechanical seals of the turbines and pump casings, upgrading the vacuum bowl system for the volute, and inspecting the 7.5 horsepower motors, associated circuit breakers, and magnetic starters to ensure proper electrical operation. The scope also covers checking the single-stage vacuum pumps and vacuum equipment, with potential rebuilds or replacements as needed, along with inspecting inline check valves for leaks and ensuring the integrity of the PVC suction lines to maintain proper suction. Additionally, the control panel and level control system, including floats, will be examined for correct functionality, and sediment removal from the 30,000-gallon holding tank is required. The contract is set for a one-year term with a due date of June 24, 2024, and covers all counties in New York State. It is not set aside for service-disabled veteran-owned businesses but includes a 6% contracting goal for such businesses. The project is managed by the NYS Department of Corrections and Community Supervision, with a contract value estimated between $50,000 and $150,000. The work aims to ensure the operational reliability of the wastewater transfer system through detailed inspections, potential component rebuilds or replacements, and sediment removal, ultimately maintaining system efficiency and compliance.

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → NYS Department of Corrections and Community Supervision
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Smith and Loveless Duplex Pump System for Waste Water Transfer Station. Check both turbines and pump casings (Volute) for acceptable tolerances and mechanical seals.  Upgrade is need on vacuum bowl system for the Volute. Check both 7.5hp motors, 1800rpm's for amp draw, also associated 50 amp circuit breakers p/n 4L202h and magnetic motor starters p/n 4L420G for proper operation. Check both single stage vacuum pumps and associated vacuum equipment.  May need possible rebuilds and/or replacement. Check in-line 4 check valves for proper operation, one is leaking into the leak free isolation pan.  They may need to be rebuilt or replaced. The drop down 4 pvc suction lines for the turbines need to be inspected for proper integrity to hold suction properly. Inspect the control panel for the Duplex Pump Station for the proper operation of all parts included in the operational system. Inspect the Level Control System for proper operation, the floats may not be operating properly p/n 4L291. Built up sediment will need to be removed from the 30,000 gallon holding tank. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Disadvantaged Owned Sub-Contracting Goal: 0% Due date:06/24/2024 2:00 PM Contract term: 1 year County(ies): All NYS counties Location: Moriah SICF - 75 Burnhart Lane, Mineville, NY 12956 Business entities awarded an identical or substantially similar procurement contract within the past five years: None

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS