Wastewater Reclamation Facility Improvements for Digester Covers, Mixer, Polymer Building, and Electrical
Open
26-042State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Pueblo is soliciting bids for improvements to its Wastewater Reclamation Facility (WRF) under solicitation 26-042. The scope of work includes electrical and instrumentation upgrades, HVAC replacements, and the installation of new Motor Control Centers (MCC) and Area Control Panels (ACP) to enhance SCADA connectivity. Additionally, the project involves upgrades to digester mixing systems, the placement of two digester covers, and improvements to the solids area polymer system. Site work encompasses buried piping and pavement demolition, replacement, and the construction of a new cast-in-place foundation. While the City will purchase the digester covers and specific special services under a separate contract, the selected contractor is responsible for all remaining work beyond the manufacturer's scope.
The contract will be awarded to the responsible bidder who submits the lowest and most responsive lump sum bid, including any selected bid alternates. Bidders must utilize the City's provided forms and submit responses via the OpenGov Procurement portal. Key requirements include compliance with the Davis-Bacon Act, 2010 ADA Standards for Accessible Design, and the Owner's SCADA cybersecurity standards. The contractor must provide payment and performance bonds within ten business days of the notice to proceed and adhere to strict packaging, marking, and piping identification standards conforming to ASME A13.1 and MIL-STD-810. Quality control is managed through a Resident Project Representative, with specific factory acceptance testing required for PLC-64 and PLC-72.
General Info
Bids for Pueblo's Wastewater Reclamation Facility upgrades involving electrical, mechanical, and site work.
HighAI Summary for Appendix B - Existing MCC Drawings: A collection of technical motor control center (MCC) schematics and wiring diagrams for the Newberry State project, including control power distribution and motor control schematics for bar screens, conveyors, and raw sewage pumps. Documents date from 1987 to 1995.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix C - Existing ACP Drawings: A collection of technical wiring diagrams and schematics for level loops and flow loops, including probes, spark protectors, and RFI filters. The documents detail field and control room connections for various systems (e.g., bar screens, scum pits, grit pump vaults) for the City of Pueblo W.W.T.P., dated between 1986 and 1987.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Pueblo - Digester Mixers and Covers, Polymer, and Electrical Upgrades Specifications: Technical specifications for Contract #23-130 (BC Project# 195746) issued for bid in March 2026. The document provides a comprehensive table of contents for Divisions 01 through 48, covering civil, electrical, mechanical, and process control requirements for digester mixers, covers, polymer, and electrical upgrades for the City of Pueblo.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Pueblo Digester Mixers and Covers, Polymer and Elec. Upgrades Drawings: Technical drawings and specifications issued for bid for the City of Pueblo's Digester Mixers and Covers, Polymer and Electrical Upgrades. The document includes a drawing index, cross-referencing systems, equipment numbering schemes, and a comprehensive list of mechanical and electrical abbreviations.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Pueblo - Wastewater Reclamation Facility Improvements (IFB #26-042): Public Improvement Invitation for Bid #26-042 issued by the City of Pueblo on November 10, 2026. The project involves improvements to the Wastewater Reclamation Facility, including electrical/instrumentation upgrades, HVAC replacements, digester mixing system upgrades, installation of two digester covers, and polymer system improvements. It also includes sitework such as piping and pavement demolition and foundation construction. Bids are due December 2, 2026, via the OpenGov portal.
PDF
PDF, High priority: read this first10 pages · wage-determination
HighAI Summary for Federal Labor Standard Provisions for Construction Contracts: This document outlines the Federal Labor Standards Provisions applicable to construction contracts assisted by the United States government. It details requirements for minimum wages and fringe benefits for laborers and mechanics, including payment frequency, wage determination adherence, and posting obligations. The document covers classifications of labor, conformance procedures for unlisted classifications, and rules for fringe benefits not expressed as hourly rates. It also addresses unfunded plans and contractor obligations regarding wage payments and interest on unpaid wages. The provisions ensure compliance with the Davis-Bacon Act and related regulations, providing guidance for contracting officers and contractors on wage standards and classifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for James Dilorio WRF Existing Power System Studies: January 2019 (Revision 1) technical report for the James Dilorio WRF in Pueblo, Colorado. The document details a Short Circuit Evaluation, Protective Device Coordination, and Arc Flash Study for new equipment associated with Switchgear 78A/B and affected downstream equipment. It includes fault contribution data, analysis scenarios, and compliance with IEEE and NFPA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pueblo Wastewater Treatment Plant - Fire Alarm System Shop Drawings: Shop drawings and technical specifications for the fire alarm system at the Pueblo Wastewater Treatment Plant Headworks Renovation. Dated October 31, 2012, the document includes a sheet index, design statements based on 2002 plans, NFPA 72 compliance requirements, and a system legend for components.
PDF
PDF, High priority: read this first8 pages · contract-document
HighAI Summary for Sample Contract Documents - City of Pueblo: This document contains sample contract documents for a construction project by the City of Pueblo. It includes a Notice of Award, Contract Agreement, Performance Bond, and Payment Bond. The Contract Agreement outlines the obligations of the City and Contractor, referencing bid numbers, project specifications, and legal provisions. The Performance Bond and Payment Bond sections provide surety guarantees for contract performance and payment. The document is intended to formalize the contract execution and ensure compliance with terms, bonds, and legal requirements.
PDF
PDF, High priority: read this first8 pages · contract-document
HighAI Summary for Sample Contract Documents for CDOT Projects - Notice of Award and Contract Agreement: This document contains sample contract documents for CDOT projects including a Notice of Award, Contract Agreement, Performance Bond, and Payment Bond. The Notice of Award notifies the contractor of bid acceptance and requirements for contract execution and bonds. The Contract Agreement outlines the terms between the City of Pueblo and the contractor, including project details, obligations, incorporated documents, and legal provisions. The Performance Bond section guarantees faithful performance of the contract and indemnifies the City. The document is a comprehensive contract package intended for formalizing construction project agreements with the City of Pueblo.
PDF
PDF, High priority: read this firstsow
HighAI Summary for WesTech Fixed Radial Beam Digester Cover Model DCB15 Technical Proposal: Technical proposal (Rev 1, Proposal 2460426.F) for a 50ft diameter Fixed Radial Beam Digester Cover (Model DCB15). The document details design criteria, technical specifications, including operating pressures (13 in WC) and weights (48,000 lb), and a comprehensive scope of supply for carbon steel components and accessories from Shand & Jurs and Sioen.
PDF
PDF, Low priority6 pages · other
LowAI Summary for City of Pueblo Licensing and Sales Tax Information for Construction Contractors: This document provides licensing requirements and sales tax information for construction contractors operating within the City of Pueblo, Colorado. It outlines the necessity for contractors and subcontractors to hold appropriate licenses, details the city sales and use tax rate of 3.7%, and explains the mandatory prepayment threshold effective October 1, 2025, for contracts valued at $100,000 or more. The document also clarifies tax obligations on materials and equipment, exemptions, and the responsibilities of general contractors regarding subcontractor tax liabilities. Contact information for the Sales Tax Division and reminders about record-keeping and audits are included.
PDF
PDF, Low priority13 pages · policy-guide
LowAI Summary for City of Pueblo Section 3 Utilization Plan for Contractors June 2026: This document is the City of Pueblo's revised June 2026 policy and orientation guide for contractors, developers, and sub-grantees regarding Section 3 of the Housing and Urban Development Act. It outlines the City's procedures to ensure employment and contracting opportunities are directed to low- and very low-income persons and businesses on HUD-assisted projects. The guide defines Section 3 covered projects, workers, and business concerns, sets employment and contracting goals, and details reporting requirements. It serves as a summary of Section 3 regulations and the City's implementation approach for covered projects.
PDF
PDF, Low priority1 page · ffata-reporting-form
LowAI Summary for FFATA Reporting Form for City of Pueblo: This document is the FFATA Reporting Form/Certification required by the City of Pueblo to comply with the Federal Funding Accountability and Transparency Act (FFATA). It collects applicant information including name, address, DUNS number, project location, and a brief project description. The form requires applicants to disclose if they meet certain federal revenue thresholds and, if applicable, to report the names and total compensation of their top five highly compensated executives. The form must be signed by an authorized official and submitted to the City before any payments are made.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
In general, this project will consist of improvements to the Wastewater Reclamation Facility (WRF) including: New electrical and instrumentation improvements HVAC replacements and modifications Upgrades to the digester mixing systems Placement of two digester covers Improvements to the solids area polymer system Sitework also includes buried piping demolition, pavement demolition and replacement, and construction of a new cast-in-place foundation The digester covers and limited special services will be purchased by the City under separate contract, with Contractor providing the balance of work beyond the scope of the cover manufacturer. Contractor shall perform all work as detailed in the Invitation for Bid, plans, and specifications included in the project documents.