Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater System Capacity Improvements Project (Rebid - Second Advertisement)

Closed
S-KS0510-00017594State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Wastewater System Capacity Improvements Project in St. Helens, Oregon, involves the construction and replacement of sanitary sewer infrastructure within Basins 4 and 6 to enhance system capacity, improve reliability, and resolve existing conveyance issues in critical areas of the collection network. This rebid effort, identified under solicitation number S-KS0510-00017594, is being managed by the Oregon Public Works agency and is open to qualified contractors seeking to deliver essential upgrades to the city’s wastewater system. The solicitation was posted on July 27, 2026, with a firm response deadline of September 1, 2026, and all work is to be performed within the city limits of St. Helens at the designated ZIP code 97051. Contract inquiries and coordination are handled by Brad Mercure and Sharon Darroux, both reachable via the same phone number, with Brad serving as the primary point of contact and Sharon designated as the purchaser. The project falls under a State, Local, or Education agency procurement, with the solicitation posted on OregonBuys.gov and accessible through the provided UI link. There is no set-aside designation specified for this opportunity, meaning it is open to all eligible bidders without restrictions based on business size or ownership type, and no NAICS code has been assigned in the documentation provided.

General Info

St. Helens, Oregon wastewater infrastructure upgrade in Basins 4 and 6, bid due September 1, 2026, open to all qualified contractors.

Agency

Oregon → Public Works

Place of Performance

Helens, OR, 97051, USA

Set-Aside

NONE

Documents

22

Archaeological Inadvertent Discovery Plan for City of St. Helens Wastewater System Capacity Improvements

PDF, High priority: read this firstinadvertent-discovery-plan
High

DSL General Authorization Eligibility Determination for City of St. Helens Wastewater Collection System

PDF, High priority: read this firstgeneral-authorization-eligibility-determination
High

NPDES 1200-C Stormwater Construction Permit - City of St Helens

PDF, High priority: read this firstpermit-document
High

ODOT Permit 01M42061 to Occupy or Perform Operations on US-30 Highway

PDF, High priority: read this firstpermit
High

Project No S-679 Documentation Checklist for Wastewater System Capacity Improvements

PDF, High priority: read this firstchecklist
High

Railroad Protective Liability Policy and Application

PDF, High priority: read this firstinsurance-policy-application
High

WW System Capacity Improvements Basins 4 and 6 - Bid Schedule S-679

XLSX, High priority: read this firstbid-schedule
High

WW System Capacity Improvements Basins 4 and 6 Project No. S-679 Rebid Invitation to Bid

PDF, High priority: read this firstitb
High

401 Water Quality Certification Approval for City of St. Helens Wastewater Project 2025-323

PDF, Low prioritycertification
Low

Bidder's Checklist for Public Improvement Contract

PDF, Low prioritybidders-checklist
Low

Certificate of Liability Insurance for Contract

PDF, Low priorityinsurance-certificate
Low

Construction Notice for Wastewater Capacity Improvements Project S-679

PDF, Low priorityspecial-notice
Low

Contractor Request for Access to Railroad Property

PDF, Low priorityother
Low

Geotechnical Data Report - City of St. Helens Wastewater Collection System Capacity Improvements

PDF, Low prioritygeotechnical-data-report
Low

Highway 30 Record Drawing 26V-92 Revision 5/90

PDF, Low priorityrecord-drawing
Low

Major Equipment, Manufacturers, and Suppliers List Form

PDF, Low prioritymajor-equipment-list
Low

Permit PNWR250532072 Contractor Right of Entry License Agreement

PDF, Low prioritycontract-document
Low

ST HELENS CWSRF Bidders List and Pre-bid Checklist

PDF, Low prioritybidders-list
Low

St Helens SERP Basin 4 Wetland Compliance Memorandum 1-24-2025

PDF, Low prioritycompliance-memo
Low

St Helens SERP Floodplain Compliance Memorandum 12-13-2024

PDF, Low priorityserp-compliance-memo
Low

St Helens Wastewater System SERP Compliance Memo 08-26-2024

PDF, Low priorityserp-compliance-memo
Low

USACE NWP Verification Letter NWP-2025-323 for Sewer Line Replacement

PDF, Low prioritypermit-verification
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Public Works
Contacts2 people available
OfficeHelens, OR, 97051, USA
Organization / Agency
Oregon → Public Works
Office AddressHelens, OR, 97051, USA
Contacts
Brad MercurePoint of Contact
Sharon DarrouxPurchaser

Full Description

Show more
The Wastewater Capacity Improvements Project consists of the construction and replacement of sanitary sewer infrastructure within Basins 4 and 6 in the City of St. Helens. The project is intended to increase system capacity, improve reliability, and address existing conveyance deficiencies in key portions of the collection system.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS