Wastewater System Expansion Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wastewater System Expansion Project, managed by the Fall River Valley Community Services District, involves extending the wastewater collection system across the unincorporated communities of Fall River Mills and McArthur in Shasta County, California. The scope of work includes installing several thousand feet of sewer pipe and appurtenant structures, connecting existing structures to the new system, and abandoning septic tanks according to Shasta County requirements. Key infrastructure improvements include the installation of three new lift stations in McArthur and the upgrading of existing lift stations at Bridge Street, Hospital, and River Street through the replacement of pumps, motors, electrical components, controls, and piping. Additional technical enhancements include the installation of supervisory control and data acquisition (SCADA) equipment and back-up level controls at the lift stations. At the Wastewater Treatment Plant, the project entails constructing a new aeration pond, rehabilitating a building for aeration equipment, installing a self-cleaning mechanical screen in the concrete headworks, and replacing electronic sensors for SCADA integration. Power infrastructure upgrades include installing emergency back-up generators at the treatment plant and specific lift stations, as well as replacing a PG&E transformer near Reynolds Road with underground electrical conduit and conductors. The project has been approved under CEQA guidelines, with a Mitigated Negative Declaration confirming no significant environmental effects.

General Info

Fall River Valley expands wastewater systems with new pipes, lift stations, and plant upgrades.

Agency

California → Fall River Valley Community Services District

Place of Performance

CA, 96028

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fall River Valley Community Services District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fall River Valley Community Services District
Office AddressN/A
Contacts
William RodeskiGeneral Manager

Full Description

Show more
The project includes extending the FRVCSD’s wastewater collection system to various properties within the FRVCSD’s service area. Improvements include installing several thousand feet of sewer pipe and appurtenant structures. Existing structures would be connected to the new sewer collection system. Septic tanks would be abandoned in accordance with Shasta County requirements. Three new lift stations (LS) would be installed in McArthur. Improvements would be made to existing LS 1 (Bridge Street), LS 2 (Hospital), and LS 3 (River Street), including replacing existing pumps, motors, electrical components, controls, and piping. Back-up level controls and supervisory control and data acquisition (SCADA) equipment would be installed at the lift stations. Improvements at the WWTP include constructing a new aeration pond inside one of the existing ponds, rehabilitating an existing building to house the aeration system equipment, installing a new self-cleaning mechanical screen in the existing concrete headworks, and replacing electronic sensors in the headworks to tie in to the SCADA system. Emergency back-up generators would be installed at the new lift stations, the Bridge Street LS, and the WWTP. An existing PG&E transformer adjacent to Reynolds Road would be replaced, and electrical conduit and conductors would be installed underground from the transformer to the WWTP.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS