This Solicitation opportunity from Texas was posted on May 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Wastewater Treatment Plant Effluent Filter Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
**Please read the bid instructions carefully and comply with these instructions as each bid will be reviewed for compliance. All proposal pages 1 thru 29 must be completed and submitted with your bid response including Sub-Contractor Qualifications.
Deviating from instructions could result in your bid being considered non-responsive. The Town of Flower Mound is accepting sealed bids for the following item(s) at the herein stated location until the due date and time stated below: RFB No: 2025-57-B – Wastewater Treatment Plant Effluent Filter Rehabilitation Optional Pre-Bid Meeting: 06/04/2025 at 9:30AM at 201 Spinks Rd, Flower Mound, TX Questions Deadline: 06/17/2025 at 12:00pm (CT) Due Date and Time: 06/26/2025 at 11:00am (CT) Engineer’s Estimate: $5,140.00.00 An optional Pre-Bid Meeting for the Project will be held at 9:30 a.m. (Central Time) on June 4, 2025 at the Town of Flower Mound O & M Building, 201 Spinks Road, Flower Mound, TX 75028. The optional Pre-Bid Meeting will be followed by a Site Walkthrough. All questions must be submitted in writing (no exceptions) to contact@example.gov . Questions will not be answered over the phone by the Engineer and/or Engineering Design Firm. Location to Submit Responses: Town of Flower Mound, Attn: Sabrina Zadow, Purchasing Manager, 2121 Cross Timbers Road, Flower Mound, TX 75028 Hard copy set of plans and specs may be obtained at the herein stated submittal location for a fee of $50.00 per set or via the Town’s e-procurement system https://flower-mound.ionwave.net/Login.aspx. The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of the improvements detailed in the construction plans and specifications. The Wastewater Treatment Plant Effluent Filter Rehabilitation Project is located at the Town of Flower Mound Wastewater Treatment Plant (1101 Duncan Lane, Flower Mound, Texas 75028).
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
