Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Active
2027-06BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 2027-06B is for the Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation project in Rosenberg, Texas. The City of Rosenberg is seeking a contractor to provide all labor, materials, equipment, and supervision for the rehabilitation of the collection system. The scope of work includes the installation of approximately 6,188 linear feet of 8-inch HDPE sanitary sewer pipe using pipe bursting, static pipe bursting, and trenchless methods, as well as 400 linear feet of PVC sanitary sewer pipe via open cut and trenchless methods. Additionally, the project requires the installation of six standard manholes, one drop manhole, and the rehabilitation of existing brick and precast manholes, along with pre- and post-construction cleaning and tving. The bid submission deadline is November 19, 2026, at 2:00pm, with questions due by November 13, 2026. Award decisions will be based on the greatest advantage to the city, considering factors such as technical and operational capabilities, bidder reputation, performance history, and the ability to complete the work promptly. Contractors must comply with the Texas Manual on Uniform Traffic Control Devices, the Americans with Disabilities Act, and local city codes. Key requirements include the provision of bid security, performance and payment bonds, and contractor's liability insurance. Work must commence upon receipt of a Notice to Proceed, with a construction schedule due within ten days. All official communications and submissions are managed through the OpenGov Procurement platform.

General Info

Contract for rehabilitating the wastewater collection system in Rosenberg, Texas, via solicitation 2027-06B.

Documents

4

City of Rosenberg - Wastewater Treatment Plant No. 2 Collection System Rehabilitation (2027) Plan Set

PDF, High priority: read this firstspecifications
High

General Conditions of the Agreement

PDF, High priority: read this firstspecifications
High

ITB #2027-06B: Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

PDF, High priority: read this firstitb
High

Wastewater Treatment Plant No. 2 – Collection System Rehabilitation (2027) Technical Specifications

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → CIP
Contacts1 person available
OfficeRosenberg, TX, 77471, USA
Organization / AgencyTexas → CIP
Office AddressRosenberg, TX, 77471, USA
Contacts
Blake SkilesProcurement Manager

Interested Companies (2)

Amtek Information ServicesTOMBALL, TX
Eagle ContractingHOUSTON, TX

Full Description

Show more
*Notice to All Vendors* The City of Rosenberg utilizes OpenGov Procurement as its eProcurement platform. All solicitations, official notices, addenda, other solicitation documents, and contracts will be posted in OpenGov. Registration is highly encouraged to ensure you receive proper notifications. Information obtained from any other source is done so solely at your own risk. The City of Rosenberg takes no responsibility for information posted outside of the OpenGov Procurement Platform or Legal Notices published in the Fort Bend Herald.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and SWPPP, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveying, traffic control, and preconstruction video. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation for this project, specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to bidding terms. Bidders must provide a bid bond, performance and payment bonds, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with MWBE requirements, including the submission of a Good Faith Efforts Form and Table A, is mandatory for responsiveness. Contract administration is managed by Willis Engineers on behalf of the City of Belmont. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment reviewed by the engineer.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the replacement of motor control center components, and improvements to electrical and instrumentation systems. Other key tasks include lead abatement, metals fabrication, painting, coatings, the installation of slide gates, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses, as well as DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Texas → CIP

Same awarding agency

NAICS: 238320
New
SLED
Water Plant No 4 - Recoat Elevated Storage Tank
Solicitation # 2027-07B
The City of Rosenberg is soliciting sealed bids under solicitation number 2027-07B for the recoating of the interior and exterior of the 1.0 MG Elevated Storage Tank located at Water Plant No 4, situated at 3720 Airport Avenue, Rosenberg, Texas. With an estimated budget of 885,000 dollars, the project scope includes performing various tank repairs, replacing the 24 inch mushroom style roof vent with a 36 inch version, replacing the roof hatch and penetration sleeve, installing a riser safety gate, and adding confined space entry signs and a new fall protection device on the water access ladder. Additional deliverables include the placement of two city-approved logos on the tank exterior, the disinfection of the tank with successful bacteriological sampling, and the submission of a construction schedule within 10 days of the notice to proceed. The estimated period of performance is 185 calendar days. Award will be based on all factors deemed of greatest advantage to the city, including bidder capabilities, experience, performance history, and the technical offer. Bidders must submit their responses via the OpenGov Procurement platform by the deadline of November 19, 2026. Required documentation includes a bid bond of five percent for bids exceeding 50,000 dollars, a Certificate of Interested Parties, and a Conflict of Interest Questionnaire. The successful contractor must provide performance and payment bonds, and may be required to provide a maintenance bond for 100 percent of the contract price. Payment terms are set at 30 days from the date of billing via cashier's check. The project is overseen by the Engineer of Record, Kaluza, Inc., and requires compliance with OSHA safety standards and City of Rosenberg codes and ordinances. Final acceptance is contingent upon a final inspection, the submission of project record documents, and an 11-month warranty inspection.
Painting and Wall Covering Contractors

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS