Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Treatment Plant Recycled Water Upgrades

Closed
RFP-24-074State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334513
New
Federal
Boiler Plant O2 Sensor Replacement
Solicitation # 36C26027Q0101
The Department of Veterans Affairs, through the Network Contract Office 20, is conducting market research via a Sources Sought Notice for a firm-fixed price service contract to perform inspection, testing, maintenance, and repair of three model 6888 Rosemount flue gas analyzers. The work will be performed at the VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. The primary scope involves replacing internal O2 analyzer components using original equipment manufacturer parts, specifically 18 inch standard cells, 18 inch heater strut assemblies, Hastelloy with Vee Deflectors for service up to 1300 degrees Fahrenheit, and new flange gaskets. The period of performance is six months, with on-site work required during core hours of 7:00 AM to 4:00 PM, Monday through Friday. This opportunity is designated as a total Small Business Set Aside under NAICS code 334513, with a size standard of no more than 750 employees. Qualified sources, including SDVOSB and VOSB entities, must provide company details, SAM.gov UEI numbers, and proof of manufacturer authorization if they are not the OEM. Contractors must employ qualified personnel, maintain general third-party liability insurance per FAR 52.228-5, and adhere to NEC, OSHA, and JCAHO standards. Deliverables include written daily reports to the Deputy Chief Facilities Management and testing documentation provided to the Contracting Officer's Representative. Interested parties are requested to provide a courtesy quote and capability statement to assist the government in evaluating price reasonableness and market availability.
260-NETWORK Contract Office 20 (36C260)

POSTED

about 13 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Banning is seeking proposals from a shortlist of three qualified Design-Build Teams to deliver a comprehensive Progressive Design-Build for the Wastewater Treatment Plant and Recycled Water Upgrades Project, with a total budget of $60 million. The project aims to design, permit, and construct a facility capable of producing up to 3.6 million gallons per day of high-quality recycled water that meets stringent regulatory standards, including Title 22 requirements and RWQCB limits. The procurement process emphasizes a collaborative approach, cost-effectiveness, durability, energy efficiency, and potential for future expansion, with an emphasis on incorporating renewable energy and tax benefits where feasible. The selected team will be responsible for delivering a reliable, flexible, and sustainable treatment solution within a tightly constrained schedule, targeting substantial completion by September 2027, with a Notice to Proceed expected in December 2024. The procurement process involves a best value selection methodology, evaluating multiple factors such as design quality, cost, schedule, sustainability, and risk management. The City has outlined a detailed timeline, with the RFP response deadline set for October 11, 2024. The project’s scope includes not only the design and construction but also permitting, startup, commissioning, and ongoing project management. The contract aims to ensure clear responsibilities, high-quality materials and workmanship, and an integrated team approach to optimize project outcomes, ultimately providing the City with a cost-effective, expandable, and environmentally sustainable recycled water facility. The primary contact for this solicitation is Angelo Heidt, and further project details can be accessed through the City’s procurement portal.

Documents

14

Banning WWTP Upgrade - Design Criteria Report v7

DOCX, High priority: read this firstspecifications
High

City of Banning Progressive Design-Build Agreement (DBIA 545)

DOCX, High priority: read this firstcontract-document
High

City of Banning Wastewater Treatment Plant Recycled Water Upgrades RFP

PDF, High priority: read this firstrfp
High

City of Banning WWTP and Recycled Water Upgrades - Draft Conceptual Design Drawings

PDF, High priority: read this firstspecifications
High

City of Banning WWTP Equalization Basin Project PER

PDF, High priority: read this firstspecifications
High

DBIA Document No. 535 - General Conditions of Contract Between Owner and Design-Builder

DOCX, High priority: read this firstcontract-document
High

City of Banning Wastewater Treatment Plant and Recycled Water Upgrades Feasibility Study (Revision 1)

PDF, Low priorityfeasibility-study
Low

City of Banning WWTP Expansion and Phase I Recycled Water System IS/MND

PDF, Low priorityenvironmental-impact-report
Low

City of Banning WWTP Expansion and Phase I Recycled Water System IS/MND

PDF, Low priorityother
Low

City of Banning WWTP Expansion and Phase I Recycled Water System IS/MND

PDF, Low priorityother
Low

105-0002_G_03_19_2024.dwg

DWG

105-0002_PHP.dwg

DWG

105-0002_Site_Plan.dwg

DWG

Question_28_Photo.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Sep 4, 2024 to Oct 11, 2024. The notice title changed. NAICS code changed from 812930 to 334513. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Banning
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Banning
Office AddressN/A

Full Description

Show more
Through this Request for Proposals (RFP), the City of Banning (City) is requesting Design-Build Proposals from short-listed Design-Build Teams (Respondents, Design Builders, or DB Teams) to perform Progressive Design-Build (PDB) services for the City of Banning Wastewater Treatment Plant and Recycled Water Upgrades Project (Project).The Project will include the completion of the Project design, permits, and construction services, subject to a strictly constrained and managed budget of $60 million inclusive of all design and construction cost, start-up and commissioning, permitting, project management services, construction management services and City held contingencies. The City is undertaking the proposed Project based on the requirements identified by SB991, which allows PDB on any project over $5 million in value that stores, treats, or conveys water.On March 22, 2024, the City issued a Request for Qualifications (RFQ) for the Project. Statements of Qualifications (SOQs) were received from Respondents on May 3, 2024. The City evaluated responsive SOQs and in accordance with the RFQ, the City shortlisted the following three (3) Respondents:AECOM Lyles JVInnovative Construction SolutionsPERC Water CorporationOnly these three (3) Respondents are eligible to receive and respond to this RFP. Respondents to this RFP will be requested to advance the design and provide detailed input as to the design and construction of the Project, including benefits to the Project’s reliability, ease and extent of upgrades and expansion and interconnection, and sustainability. Award of the Design-Build Contract will be made utilizing a best value selection process and will consist of an evaluation of multiple factors as set forth in this RFP. Procurement ScheduleA summary schedule of the major activities associated with this solicitation process is provided in the timeline under Section I.C below. This procurement schedule is based on the City’s intent to execute a Design-Build Contract and issue a Notice to Proceed (NTP) in December 2024. The deadline is based on the City’s objective to achieve substantial completion of the Facilities and is anticipated to be September 2027. All dates are subject to change at the discretion of the City. Procurement ObjectiveThe City is seeking a qualified Respondent to design, construct, and provide reliable and cost-effective recycled water for the City. The objectives in utilizing the design-build delivery process include the following:A treatment facility with a maximized capacity (up to 3.6 MGD) that stays within budget constraints.Effluent water quality that meets Title 22 tertiary disinfected water requirements, impending RWQCB limits, and Beaumont Basin maximum benefit objectives.A collaborative environment where costs and contingencies are clearly defined for decision-making processes.An optimized schedule to meet funding requirements.Delivery of a high-quality design that incorporates high-quality materials, equipment and workmanship through sound engineering and selection of proven technologies.A Project that allows for ease of operation and flexibility while providing durability and energy efficiencies related to long-term operation and maintenance.A Project that is low in capital and operating cost, yet high in value.A treatment facility that can easily be expanded.A design that may incorporate renewable energy and/or tax benefits to the City.Optimal risk allocation and clear assignment of performance responsibilities to a single contracting entity through design and construction.Full and appropriately balanced integration of key design, construction, and quality assurance and quality control personnel in all aspects of the Project development

More opportunities from California → City of Banning

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS