Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Water Diversion Infrastructure Maintenance and Operation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the operation and maintenance of water diversion infrastructure for prime contractors working on Corning Subbasin Groundwater Sustainability Agency projects in Glenn County, California. The scope of work focuses on managing water capture from Stony Creek at three specific diversion points: Prune Orchard, Capay Farms South, and Almond Huller Pit. The contractor is responsible for managing specific flow rates of 8.9 cfs and 15.6 cfs while ensuring all diversion infrastructure is properly maintained. Key deliverables include the continuous operation of these systems and the provision of detailed flow rate logs to document water movement. The project is performed in Orland and falls under the oversight of the California State Water Resources Control Board, Division of Water Rights.

General Info

Subcontract for operating and maintaining water diversion infrastructure in Glenn County, California.

Agency

California → SWRCB, Division of Water Rights

Place of Performance

Orland, CA

Set-Aside

NONE

Documents

This scope was carved out of T033513.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Temporary Permit Application T033513

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Temporary Permit Application T033513
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Rights
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Rights
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Operates and maintains water diversion points for prime contractors on Corning Subbasin Groundwater Sustainability Agency projects in Glenn County, California. Manages flow rates of 8.9 cfs and 15.6 cfs at Prune Orchard, Capay Farms South, and Almond Huller Pit diversion points to capture water from Stony Creek. Delivers maintained diversion infrastructure and documented flow rate logs.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
FY27 Euclid Creek Fishway Construction
Solicitation # W912P427BA001
The U.S. Army Corps of Engineers, Buffalo District, is soliciting bids for the FY27 Euclid Creek Fishway Construction project located at the Euclid Creek Spillway in Cleveland, Ohio. The project scope includes the construction of a fishway within the existing spillway, necessary spillway modifications, and the construction of an access road, retaining wall, railing, and road gate. Additional requirements involve tieback design and installation for the retaining wall, site restoration, concrete removal, excavation, and dewatering. While tree felling is no longer a project requirement, the contractor remains responsible for removing felled trees from the site. The estimated magnitude of construction is between $5,000,000 and $10,000,000, and the procurement is a Small Business Set Aside - Total. The government intends to award a firm-fixed-price contract to the lowest priced responsive and responsible bidder. Bids must be submitted electronically via the PIEE suite by December 17, 2026, at 10:00 AM EST. The period of performance is expected to begin with a Notice to Proceed around January 26, 2027, with a total completion timeline of 600 calendar days. Notably, in-water work is generally prohibited from September 15 through June 30 annually, though specific waivers for 2026 and 2027 allow work during May-June and September-December. The project is subject to the Davis-Bacon Act and requires strict adherence to EM 385-1-1 safety standards and NIST SP 800-171 cybersecurity requirements.
W072 Endist Buffalo

POSTED

about 23 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS