Water Diversion Structure Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves installing a down chute using hand tools to redirect water flow away from the meter vault, with the goal of preventing future erosion in the area. The work requires careful manual labor to construct a durable water diversion structure that effectively channels runoff without causing additional environmental damage. The project is classified under NAICS code 238990 and is structured as a subcontract, reflecting its integration into a broader water resource management initiative. The work will be performed in Bakersfield under the oversight of the California Department of Water Resources, with the contract posted on July 10, 2026. Although no specific solicitation number or point of contact is provided, the location is clearly defined, and the scope is narrowly focused on erosion control through a straightforward but essential infrastructure adjustment. The use of hand tools underscores the need for precision and minimal disruption to surrounding areas, aligning with environmental protection goals in the region.
General Info
Agency
NAICS
Place of Performance
Bakersfield, CASet-Aside
Documents
This scope was carved out of WRM 9A Meter Vault Barrier.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
