Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Filtration Plant Control Panel Upgrades

Closed
P23-0140State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract P23-0140 involves upgrading the control panels at the Water Filtration Plant operated by the City of Port Huron in Michigan. The project requires a comprehensive proposal from qualified contractors to provide all labor, materials, and equipment necessary for the removal and replacement of two power panels and a motor control center within the low lift building of the facility. The scope includes not only the electrical components but also ensuring proper integration and functionality of the new control systems to enhance the plant’s operational efficiency and reliability. The project is scheduled for bidding with a response deadline of September 3, 2025, and the contract value is estimated to range between $500,000 and $2,000,000. This solicitation is issued by the City of Port Huron, a Michigan-based organization, and is open to qualified bidders who can meet the technical and safety standards required for such critical infrastructure upgrades. The project aims to modernize the control systems at the water treatment plant, ensuring compliance with current standards and improving overall plant performance. Interested parties can contact Amanda R. Huddas via email for further details and access the bid opportunity through the provided online portal. The project underscores the city’s commitment to maintaining and upgrading its water treatment infrastructure to ensure safe and reliable water service for the community.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → City of Port Huron
Contacts1 person available
OfficeN/A

Full Description

Show more
P23-0140 - Upgrades to Control Panels at the Water Filtration Plant. Location: St. Clair County, Michigan, United States, City of Port Huron. Submit a comprehensive proposal to supply all necessary labor, materials, and equipment for the removal and replacement of two power panels at the City of Port Huron’s Water Filtration Plant (WFP). This includes the removal and replacement of two power panels and a motor control center in the low lift building of the WFP, as well as replacing the motor control center in... (Additional details available upon request.)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS