This Solicitation opportunity from California was posted on May 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Line Replacement on Lyons Avenue

Closed
CP 26-026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Turlock, through its Municipal Services-Engineering division, is soliciting bids for the replacement of water lines along Lyons Avenue in Turlock, California, under solicitation number CP 26-026. The project, classified under NAICS code 237110 for water and sewer line construction, has an engineer’s estimate of $881,085.00 and requires the installation of C-900 PVC water mains in various diameters, valve boxes, fire hydrants, meters, curb stops, and associated infrastructure, along with pavement and sidewalk restoration. Work must be completed within 44 working days after notice to proceed, with substantial completion expected by day 34, and strict adherence to the City of Turlock’s standard specifications, Caltrans standards, and California labor and safety codes. All work must comply with prevailing wage laws, adhere to a fixed work schedule of 7:00 a.m. to 5:00 p.m. Monday through Friday, and maintain noise levels below 86 dBA during nighttime hours. Contractors are responsible for obtaining permits, verifying utility locations, submitting as-built drawings, and providing a one-year warranty on all work. Proposals must be submitted electronically via the OpenGov Procurement Portal by 2:00 p.m. on June 1, 2026, with only PDF files accepted and bonds submitted either through Surety2000 or as hard copies to the City’s Engineering Division. The contract includes several allowance items totaling $25,500 for unforeseen costs such as unknown utilities, irrigation repairs, traffic control, and site cleanup, but no unit prices are provided for labor or materials, making the total contract value provisional. Acceptance of work is governed by the City Engineer, with inspections occurring at both fabrication and installation sites, and final approval requiring documented compliance with all technical specifications and safety standards. The City retains sole authority over inspection, acceptance, and dispute resolution, with no formal FAR clauses applied; internal provisions on authority, governing law, severability, and amendments are included but remain unfilled with placeholders for contractor name, surety, and contract price. No socioeconomic set-asides, contract options, or key personnel requirements are specified, and while a point of contact—Janine Lee, Associate Engineer—is provided for administrative inquiries, no procurement contracting officer is named.

General Info

Water Line Replacement on Lyons Avenue, California; $881,085 estimate; bids due June 1, 2026.

Agency

California → Municipal Services-EngineeringView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(13)

Affidavit of Non-Collusion for Bid Submission

PDFaffidavit

Exhibit 17-F Final DBE Utilization Report

PDFform

Subcontractors Listing Form for California Public Contract

PDFsubcontractors-listing

Disadvantaged Business Enterprises (DBE) Certification Status Change Instructions

PDFother

Exhibit 12-B Bidder’s List of Subcontractors

PDFsow

Licensees Responsible for Specifications

PDFother

Exhibit 15-G Construction Contract DBE Commitment

PDFform

Exhibit 15-H Proposer/Contractor Good Faith Efforts

PDFsow

City of Turlock Project 26-026 Water Line Replacement Plans

PDFplans

Bidder's Bond for City of Turlock Project

PDFbidder-bond

Disclosure of Lobbying Activities SF-LLL

PDFdisclosure-of-lobbying-activities

City of Turlock Project No. 26-026 Water Line Replacement on Lyons Avenue

PDFrfp

City of Turlock Public Improvement Agreement 26-026 Water Line Replacement

PDFcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Services-Engineering
Contacts1 person available
OfficeTurlock, CA, 95380, USA
Organization / Agency
California → Municipal Services-Engineering
View Agency Profile
Office AddressTurlock, CA, 95380, USA
Contacts
Janine LeeAssociate Engineer

Interested Companies (32)

Show more
Frontline General Engineering Construction
San Lorenzo, CA
ConstructConnect
Cincinnati, OH
Road Safety
Rancho Cordova, CA

See All 32 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Engineer's Estimate is $881,085.00.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS