Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Line Replacement Project Water Line George Bell Ave., 8th Street South 1500 LF

Closed
RFB-26-148State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves the replacement of approximately 1,500 linear feet of existing 2-inch water lines along George Bell Avenue, extending from 8th Street to Claxton Street, with a new 6-inch Class 235 DR18 PVC pipe. The project scope includes installing new water services—fifteen 1-inch and four 2-inch lines—as well as a fire hydrant, to improve water infrastructure. The work is governed by detailed engineering plans and specifications, which specify materials, trenching, backfill, joint restraints, and testing procedures, all reviewed for code compliance by the City of Yuma. The contract, issued by the City of Yuma, Arizona, is a design-bid-build project with an estimated value between 150,000 and 300,000 dollars, with a completion timeline of 90 days for substantial completion and 120 days for final completion, including provisions for liquidated damages for delays. The contractual framework emphasizes strict adherence to technical standards, safety, and responsible conduct. It requires the contractor to furnish comprehensive insurance coverage, including general liability, vehicle liability, and worker’s compensation, with the City named as an additional insured. The contractor must also demonstrate qualified key personnel, enforce a drug-free workplace, and coordinate traffic control in accordance with MUTCD standards. Bidding procedures include certifications affirming non-discrimination and compliance, acknowledgment of all solicitation addenda, and submission of bid bonds in accordance with Arizona statutory requirements. The project’s administrative procedures specify electronic proposal submission via the City’s Bonfire portal by December 4, 2025, with no specified page limits but clear instructions for document organization. Inspection and acceptance are performed at the project site, with the City’s designated representative responsible for verifying compliance with the contract documents and technical standards. Overall, the contract establishes a comprehensive framework for technical execution, legal compliance, safety, and administrative oversight to ensure the successful completion of the water line replacement project.

General Info

Documents

6
PDF, Low priorityother
Low
PDF, Low priorityother
Low
PDF, Low priority75 pages · other
Low
PDF, Low priority10 pages · contract-document
Low
PDF, Low prioritycontract-document
Low
PDF, Low priority9 pages · other
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Yuma
ContactsNo contacts available
OfficeN/A
Organization / AgencyArizona → City of Yuma
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Replace approximately 1,500 linear feet of existing 2” water line with a new 6” Class 235 DR18 C900 PVC pipe along George Bell Avenue from 8th Street to the south, including Claxton Street. 15-1" water service, 4-2" water service and 1-fire hydrant will be installed as well.

More opportunities from Arizona → City of Yuma

Same awarding agency

NAICS: 561790
SLED
Cooling Tower Chemical Treatment & Testing Services
Solicitation # RFB-27-158
The City of Yuma is soliciting bids for comprehensive cooling tower chemical treatment and testing services across five facilities, including the Yuma Police Department, Yuma Civic Center, Yuma Art Center, Yuma Figueroa Plant, and the City Prosecutors Office. The selected contractor will be responsible for monthly visits, water testing, equipment monitoring, and the provision of all necessary non-chromate chemicals to prevent scale, corrosion, and biological fouling. Key deliverables include the maintenance of chiller systems, hot water systems, and condenser loops, as well as the provision of a program administration notebook containing material safety data sheets and product bulletins. All services must comply with OSHA, EPA, and City Utilities regulations regarding sanitary sewer discharge. This is a firm-fixed-price contract with an initial duration of 12 months and the option for four additional one-year renewals. Award will be granted to the lowest responsive and responsible bidder based on criteria such as conformity to specifications, past performance, and operational compatibility. The contractor must maintain general liability, auto, and workers compensation insurance, naming the City of Yuma as an additional insured. Pricing is structured as a monthly service fee per location, with additional hourly rates for standard, after-hours, and holiday work, and replacement parts billed at cost plus a percentage. Bids must be submitted electronically via the Bonfire Procurement Portal.
Other Services to Buildings and Dwellings

POSTED

15 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS