Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main & Valve Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc., involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, pipes and fittings, traffic control, jack and bore operations, cold planing, SWPPP, demolition, potholing, welding, and preconstruction video services. This solicitation is specifically targeted toward certified and qualified partners, including HUBZone Small Businesses, Disadvantaged Business Enterprises, and other minority or women-owned business entities. All work must be performed in accordance with the official bid documents and standards set by the Inland Empire Utilities Agency. The response deadline for this solicitation is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Nathan and Destiny Plummer of Norstar Plumbing and Engineering, Inc.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

This subcontract for Water Main and Valve Installation involves the removal and replacement of water transmission mains, valves, and assemblies for prime contractors on City of Santa Barbara utility projects. The scope of work includes replacing piping, couplings, and thrust blocks, as well as installing 12 inch gate valves, 4 and 6 inch isolation valves, blow-off discharge piping, and H20 valve boxes. The contractor is responsible for ensuring a leak-tight water transmission system through rigorous system disinfection and leak-free verification. All work must be performed in accordance with Greenbook and City Standard Details within Santa Barbara, California. The solicitation was posted on September 30, 2026, with a response deadline of October 16, 2026. This project falls under NAICS code 237110 for water and sewer line construction.

General Info

Subcontract for water main and valve installation for City of Santa Barbara utility projects.

Place of Performance

Santa Barbara, CA, 93101, USA

Set-Aside

NONE

Documents

This scope was carved out of 5130.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Transmission Main Renewal Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 18 days
  • Wellhead Treatment Improvement PS102AOpen now, due in 1 day
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and replacement of water transmission mains, valves, and assemblies for prime contractors on City of Santa Barbara utility projects. Replaces piping, couplings, and thrust blocks; installs 12" gate valves, 4" and 6" isolation valves, blow-off discharge piping, and H20 valve boxes. Performs system disinfection and leak-free verification. Complies with Greenbook and City Standard Details. Delivers a leak-tight water transmission system.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS