Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Water Main Installation and Infrastructure Replacement

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of B734.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Main Replacement: NW 94th St

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Clark Public Utilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of new water mains and decommissioning of existing lines for prime contractors on Clark Public Utilities projects. Installs 3,114 LF of 12-inch PVC C900 pipe, as well as 4-inch, 6-inch, and 8-inch PVC C900 piping, FLxMJ tees, butterfly valves, gate valves, and thrust blocks. Cuts, caps, fills, and abandons existing mains. Delivers a fully installed and tested water main system per Plan Set.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is set aside for small businesses, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes. Key deliverables include the construction of standard and doghouse manholes, interior drop assemblies, and specialized trenchless crossings with associated launch and receiving shafts. Additional requirements encompass CSO regulator fit out, outfall work, maintenance of flows and bypass, and site preparation activities such as clearing, grubbing, and the implementation of a Stormwater Pollution Prevention Plan. Site restoration will require seeding and fine grading of approximately 5,130 square yards. Project compliance requires adherence to environmental standards via SWPPP and the procurement of specific railroad insurance. Technical requirements include geotechnical instrumentation and monitoring. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, welding, potholing, and the installation of various pipes and fittings. This solicitation is specifically targeted toward certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The project encompasses diverse specialty trades ranging from demolition and traffic control to survey markings and preconstruction video services. All work must be performed in strict accordance with the provided bid documents. The response deadline for this solicitation is November 19, 2026, at 2:00 PM, with primary points of contact being Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Washington → Clark Public Utilities

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS