Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main Installation and Pipeline Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, and the completion of the CSO regulator fit out and outfall. Site preparation tasks consist of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables also include the implementation of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Specialized requirements include the procurement of railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

This subcontract for Dalton Utilities involves the installation of new water mains as part of water infrastructure projects. The scope of work includes trenching and the laying of approximately 21,600 linear feet of 6 inch Class 350 Ductile Iron Pipe, as well as performing 8 by 6 inch hot taps to connect the new lines to existing mains. All activities must adhere to the Georgia EPD Minimum Standards for Public Water Systems from May 2000 to ensure a fully installed and tested water main system. The project is categorized under NAICS code 237110 for water and sewer line construction. Interested parties must submit their responses by the deadline of September 11, 2026. This opportunity is managed by Dalton Utilities within the state of Georgia.

General Info

Dalton Utilities subcontract for installing 21,600 feet of water mains by September 11, 2026.

Documents

This scope was carved out of PE-75553-NONST-2027-000000061.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 Water Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Dalton Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → Dalton Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new water mains for prime contractors on Dalton Utilities water infrastructure projects. Performs trenching, laying of approximately 21,600 LF of 6" Class 350 Ductile Iron Pipe, and 8"x6" hot taps to connect to existing mains. Work must comply with Georgia EPD Minimum Standards for Public Water Systems (May 2000). Delivers an installed and tested water main system.

More opportunities from Georgia → Dalton Utilities

Same awarding agency

NAICS: 335313
New
SLED
JD Cope / DC UPS System
Solicitation # PE-75553-NONST-2027-000000066
Dalton Utilities is soliciting bids for the engineering, manufacture, testing, documentation, delivery, and field services of a complete DC/UPS system for the J.D. Cope Energy Facility in Georgia. The scope of work includes the design and fabrication of a 125 VDC station battery with racks and spill containment, a NERC PRC-005-06 compliant battery monitoring system, redundant paralleling battery chargers, an inverter with a static transfer switch, a manual bypass switch, and an isolation transformer/voltage regulator. Additionally, the project requires a 125 VDC nominal switchboard and various 120VAC and 125 VDC panelboards. The system must adhere to IEEE 450, OSHA, and International Building Code standards. The contract is a Delivered Duty Paid (DDP) agreement with the point of delivery located at 1232 V.D. Parrot Jr Pkwy, Dalton, GA. Bids must be submitted to David Keaton by the deadline of November 11, 2026. Selected suppliers will be responsible for providing a detailed manufacturing and delivery schedule, as well as comprehensive equipment data books and submittals via the Hexagon SDx system. Quality assurance involves a mandatory Inspection and Test Plan, with the possibility of source inspection shop visits by the Engineer. Final acceptance is contingent upon successful post-installation acceptance testing. All submittals must be provided in native Adobe PDF format, and scanned documents are not acceptable.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 335313
New
SLED
JD Cope / 480V Low Voltage Motor Control Centers
Solicitation # 5.5330
Dalton Utilities is soliciting firm bids for the engineering, manufacture, testing, documentation, delivery, and field services for seven indoor 480V motor control centers to be installed at the J.D. Cope Energy Facility in Georgia. The project is part of a new electrical power generation plant utilizing three 18.522MW reciprocating engines. The selected supplier must design, fabricate, and deliver the equipment DDP to the point of delivery in Chatsworth, Georgia. All equipment must comply with UL 845, NEMA ICS 1, ICS 2, and NEMA 1 standards, as well as the National Electric Code, OSHA, and International Building Code. Additionally, materials cannot be procured from China or India, and designs must have a proven domestic service history of at least three years. The contract requires comprehensive documentation, including submittals via the Hexagon SDx project website and the provision of spare parts, tools, and consumables for the first two years of operation. Quality assurance involves potential source inspections at the supplier's facility, with a five-day notice required for hold or witness points. Delivery schedules must be agreed upon within 30 days of the effective date, with specific notification timelines for shipping plans and material lists. Bids must be submitted electronically to David Keaton by the deadline of November 11, 2026.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS