Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Main Installation and Testing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 48978.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

219016 Maplewood Ph2 Drainage Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → Bluewing Civil Consultants, LLC.
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and tests buried ductile iron pipe and fittings for prime contractors on Maplewood Ph2 Drainage Improvements projects. Performs installation of restrained joints, tracer wire, mechanical joint fittings with restraining glands, and concrete thrust blocks. Applies 1 mil asphaltic bituminous seal coating and polyethylene film wrapping. Adheres to AWWA C104/C110/C151. Delivers a fully installed and tested water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and compaction testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortiums for larger portions of the work. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All quotations must be submitted to Estimating Manager Matt Metoyer by the deadline of October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 12 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Louisiana → Bluewing Civil Consultants, LLC.

Same awarding agency

NAICS: 237310
New
SLED
219016 Maplewood Ph2 Drainage Improvements
Solicitation # 48978
Calcasieu Parish Consolidated Gravity Drainage District 1 is soliciting bids for the Maplewood Ph2 Drainage Improvements project, identified as Engineer Project No. 219016. The scope of work involves installing a new cross drain and catch basins on Prater Road, excavating an existing drainage lateral, installing flexible revetment, and constructing a spoil bank. Bids must be submitted online via Bid Express by October 8, 2026, at 10:00 AM local time, with a mandatory pre-bid conference scheduled for September 23, 2026. The contract will be awarded to the reasonable bidder submitting the lowest responsive bid. Prime contractors must hold a Highway, Streets, and Bridge Construction license, while the Municipal and Public Works Construction classification may be satisfied through a subcontractor. The project requires substantial completion within 60 working days from the commencement date. Key deliverables include a preconstruction video on USB media and a Storm Water Pollution Prevention Plan. Bidders must provide a bid bond equal to 5 percent of their maximum bid price, and the successful contractor must furnish performance and payment bonds equal to the contract price, along with a 2 million dollar umbrella insurance policy. Compliance with Louisiana state laws is required, including the submission of an attestation clause regarding past criminal convictions, an employee verification affidavit, and a non-collusion affidavit. Quality assurance testing will be conducted by Raba Kistner Inc., and contractors are prohibited from using the same laboratory for their own quality control testing.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS