Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Florida was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main Installation and Utility Relocation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Specialized services required for the project include traffic control, SWPPP, construction survey, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for outreach and coordination are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 37 minutes
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains. Key construction elements include the creation of a new Mountain Avenue Lift Station with a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, FRP enclosures, fire suppression, piping, valves, and electrical and instrumentation. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. Filanc has indicated a willingness to assist qualified small business subcontractors with bonding, insurance, credit lines, and materials to facilitate project participation.
Filanc

POSTED

about 1 hour ago

DEADLINE

in 37 minutes

AI Contract Overview

Show more

This subcontract for Water Main Installation and Utility Relocation involves the installation of ductile iron piping, fittings, and accessories for prime contractors on utility relocation projects for the City of Hollywood, Florida. The scope of work includes boring, jacking, pipeline testing, disinfection, and the installation of water services. All materials must consist of US-manufactured ductile iron pipe and A-316 stainless steel hardware, ensuring full compliance with the USEPA Reduction of Lead in Drinking Water Act to deliver a fully tested and disinfected water distribution system. Managed by the Development Services Engineering Division in Florida under NAICS code 237110, the project was posted on July 20, 2026, with a response deadline of September 10, 2026. Interested parties can find further details through the provided procurement portal.

General Info

Water main installation and utility relocation subcontract for the City of Hollywood, Florida.

Documents

This scope was carved out of IFB-380-26-SA.

The full solicitation package (25 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Johnson Street Bridge Replacement and Public Utilities Relocation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Development Services - Engineering Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs ductile iron piping, fittings, and accessories for prime contractors on City of Hollywood, Florida utility relocation projects. Performs boring, jacking, pipeline testing, disinfection, and installation of water services. Utilizes US-manufactured ductile iron pipe and A-316 stainless steel hardware. Must comply with USEPA Reduction of Lead in Drinking Water Act. Delivers a fully tested and disinfected water distribution system.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS