Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Water Main Replacement And Street Rehabilitation For Meridian Ave., La Paloma Ave., And Concord Ave.

Active
20260925001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Alhambra, California, is soliciting bids for Project No. N2M26-78, which entails the replacement of approximately 7,200 linear feet of existing four-inch and six-inch cast iron water mains with new 8-inch ductile iron pipe along Meridian Ave., La Paloma Ave., and Concord Ave. The scope of work includes the installation of 252 service lines, fire hydrants, and valves, as well as comprehensive street rehabilitation involving asphalt paving, cold milling, the replacement of damaged sidewalks, curbs, and gutters, and the installation of new ADA ramps. Additional requirements include mobilization, traffic control, excavation safety measures, construction surveying, water pollution control, and the application of thermoplastic striping and pavement markers. All work must adhere to the Standard Specifications for Public Works Construction (Greenbook) and AWWA standards for disinfection and hydrostatic pressure testing. The contract will be awarded to the lowest responsible bidder based on the submitted bid schedule. Bids are due by 10:30 a.m. on October 15, 2026, and must be accompanied by a bid bond of at least ten percent of the total bid amount. Successful bidders must provide performance and payment bonds for one hundred percent of the contract value and comply with California prevailing wage laws and DIR registration requirements. The project will be performed during standard working hours from 7:00 AM to 4:00 PM, Monday through Friday, with the contract period commencing upon the issuance of a Notice to Proceed. Administration is overseen by the City of Alhambra Director of Public Works, and the contractor is responsible for coordinating all inspections at least twenty-four hours in advance.

General Info

City of Alhambra seeks bids for water main replacement and street rehabilitation projects.

Place of Performance

Alhambra, CA, 91801, USA

Set-Aside

NONE

Documents

(2)

City of Alhambra Waterline Replacement Project - Meridian, La Paloma, Concord

PDF•specifications

City of Alhambra Water Main Replacement and Street Rehabilitation (Project No. N2M26-78)

PDF•ifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Alhambra
Contacts5 people available
OfficeN/A

Full Description

Show more
Bid #N2M26-78: The project involves the replacement of approximately 7,200 linear feet of existing four-inch and six-inch cast iron water mains with new 8-inch ductile iron pipe water mains in Meridian Ave., La Paloma Ave., and Concord Ave. This includes the installation of 252 service lines, fire hydrants, valves, and related appurtenances. Additionally, the project encompasses street rehabilitation work such as asphalt paving, cold milling, replacement of damaged sidewalks, curb and gutter, and the installation of new ADA ramps. Other work items include mobilization, traffic control, excavation safety measures, construction surveying, water pollution control, pressure testing, pipeline disinfection, potholing existing utilities, remodeling conflicting sewer laterals, constructing aggregate base for street repair, and installing thermoplastic striping and pavement markers.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure effort managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, along with the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid deadline of September 29, 2026. J.W. Fowler provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices on the project.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity targeting DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the use of consortia for larger contract portions. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors must agree to the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company. The prime contractor may require payment and performance bonds totaling 100 percent of the bid, with bond premiums reimbursed up to a maximum of 1.5 percent. The primary point of contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → City of Alhambra

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS