Water Main Replacement Crossing the Fresno River
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract authorizes the continued operation of a 16-inch-diameter cast-iron water main pipeline constructed in 1962 that crosses beneath the Fresno River in Madera, California, without requiring new construction or physical upgrades. This action is classified as a minor alteration to an existing facility under the California Environmental Quality Act (CEQA) Class 1 exemption, which eliminates the need for a full environmental impact review. The project is treated as a ministerial emergency repair, enabling expedited approval without discretionary decision-making or public hearings. The Central Valley Flood Protection Board is the approving agency, while the City of Madera serves as the lead agency and project operator. There is no estimated contract value, no pricing data, no solicitation number beyond Permit No. 19992, and no competitive procurement process involved—indicating this is an administrative authorization rather than a traditional acquisition. The place of performance is specifically located approximately 250 feet east of the North Gateway Drive bridge and 100 feet east of the Union Pacific Railroad bridge, where the pipeline intersects the river. No formal contract clauses for packaging, marking, invoicing, payment details, or accounting codes are provided. There are no specified delivery schedules, FOB terms, or inspection criteria beyond compliance with CEQA regulations. The primary deliverable is regulatory acknowledgment and exemption certification, not physical construction or performance outputs. No contractor representations, certifications, or socioeconomic status information are included, and no key personnel or COR/COTR roles are formally designated, although contacts from both the Central Valley Flood Protection Board and the City of Madera are listed for administrative coordination. The absence of evaluation factors, contract options, security requirements, or competitive provisions underscores the non-competitive, ministerial nature of this action, which relies solely on compliance with environmental exemption rules to proceed. All activities are confined to the existing infrastructure’s maintenance, with no expansion of service or alteration to the pipeline’s original design or function.
General Info
Agency
NAICS
Place of Performance
Madera, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
