Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main Replacement Project In Inglewood Water Pressure Zone #1

Closed
20260722030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

41 minutes ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

41 minutes ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

41 minutes ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Inglewood is soliciting bids for a comprehensive water main replacement project within Water Pressure Zone #1, involving the installation of approximately 18,550 linear feet of ductile iron pipe in 6-inch, 8-inch, and 12-inch sizes, along with the replacement of 490 existing water service connections with new AMR meters and the installation of 56 new fire hydrants. The scope encompasses extensive civil work including trench excavation, backfill, compaction, permanent pavement restoration, street grinding and overlay, slurry seal, and thermoplastic traffic striping across multiple streets. All work must comply with stringent technical standards such as AWWA C509, C550, C900, ASTM A536, and NSF/ANSI 372 and 61 for potable water safety, with valves and fittings requiring a minimum 200 psi rating and epoxy coatings of at least 10 mils verified by spark testing. The contractor is responsible for full compliance with California DIR prevailing wage rules, environmental controls including adherence to AQMD and Cal OSHA standards, confined space protocols, and proper hazardous waste disposal using licensed transporters with valid EPA generator numbers. Contract administration requires strict adherence to inspection and acceptance procedures conducted at the jobsite by the City Engineer, with the contractor bearing all costs for rework and inspection if work fails to meet specifications. The contractor must submit a qualified full-time project superintendent who is dedicated exclusively to this project from Notice to Proceed through Notice of Completion. Financial protections include performance, payment, and maintenance bonds at 100% of the contract value issued by an acceptable surety, along with liability insurance maintained until final acceptance. The contractor must indemnify the City against all claims arising from their negligence and submit certified payroll records in compliance with California labor laws. Proposals must be submitted as a sealed hard copy to the City Clerk’s Office by 11:00 a.m. on August 13, 2026, with no electronic submissions accepted. The work must be completed within the contract time as defined by the Notice to Proceed, with no weekend or holiday time accrued, and all materials must be marked with manufacturer name, year of manufacture, size, C509 designation, and working pressure. The contract does not specify a dollar value or include federal FAR clauses, indicating it is a local public works procurement following California statutory requirements rather than federal acquisition regulations.

General Info

Replace 18,550 ft water mains, 490 service connections, 56 hydrants, restore pavements in Inglewood, CA.

Place of Performance

Wauwatosa, CA, 53226, USA

Set-Aside

NONE

Documents

3

CB-26-21 Attach3 Water Standards and AMR System Specifications

PDF, High priority: read this firstspecifications
High

CB-26-21 Water Main Replacement Project Inglewood Water Pressure Zone 1

PDF, High priority: read this firstrfb
High

Inglewood Water Main and Service Installation Construction Notes

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Inglewood
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #CB-26-21: The project consists of replacing approximately 18,550 linear feet of water mains, including 6-inch, 8-inch, and 12-inch Ductile Iron Pipe (DIP). The scope includes the replacement of 490 existing water service connections with new AMR meters, installation of 56 new fire hydrants, and the abandonment of existing water lines. Work also involves trench excavation, backfill, compaction, permanent pavement restoration, street grinding and overlay, slurry seal, and thermoplastic traffic striping across various streets within Inglewood Water Pressure Zone #1.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS