Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Water Pollution Control and Site Prep

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Water Pollution Control and Site Prep involves the installation of temporary construction entrances and concrete washout areas for prime contractors on California Department of Transportation projects. The scope of work focuses on utilizing aggregate to construct entrances that prevent track-out and implementing concrete washout containment systems in strict accordance with Division II standards to ensure functional site preparation. The project is located in Desert Hot Springs and falls under NAICS code 238910. Interested parties must submit their responses by the deadline of December 2, 2026.

General Info

Place of Performance

Desert Hot Springs, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 08-1N8804.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs temporary construction entrances and concrete washout areas for prime contractors on Caltrans projects. Constructs temporary entrances using aggregate to prevent track-out and installs concrete washout containment systems per Division II. Delivers functional construction entrances and washout areas.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Construction On State Highway In Santa Barbara County Near Buellton At Various Locations From 3.6 Miles North Of Route 1/101 Separation To 1.3 Miles South Of Route 101/246 Separation
Solicitation # 05-1K4514
The California Department of Transportation (Caltrans) is soliciting bids for contract 05-1K4514, which involves landscape planting and erosion control on a State Highway in Santa Barbara County near Buellton. The project scope covers various locations from 3.6 miles north of the Route 1/101 separation to 1.3 miles south of the Route 101/246 separation. The estimated project cost is 480,000 dollars, and bids must be submitted on a unit price basis via the Bid Express website by 2:00 p.m. on November 18, 2026. The project timeline is divided into two phases: general construction must be completed within 40 working days, while plant establishment work is allotted 750 working days, bringing the total project duration to 790 working days. A minimum of 79,000 dollars must be allocated for plant establishment work. The contract includes a 5 percent Disabled Veteran Business Enterprise (DVBE) goal and specific Small Business Enterprise (SBE) participation requirements. Bidders must provide security equal to at least 10 percent of the bid and submit a subcontractor list and certification status at the time of bidding. Compliance requirements include adherence to 2025 Standard Specifications and Standard Plans, as well as prevailing wage rates determined by the California Department of Industrial Relations. Quality assurance requires QC personnel to hold ACI Concrete Field-Testing Technician Grade 1 certification. Additionally, the contractor must provide environmental product declarations for hot mix asphalt and concrete and follow specific marking requirements for temporary concrete barriers. Final acceptance is contingent upon the submission of a Final Report on the Utilization of Small Business Enterprise within 10 days of contract acceptance.
California Department of Transportation (Caltrans)

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
Highway, Street, and Bridge Construction

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS