Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on January 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WATER SERVICE LINE MATERIAL FIELD VERIFICATION

Closed
2026-001-TOPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The Town of Payson is seeking qualified contractors to conduct a comprehensive inventory and field verification of approximately 1,300 water service lines to ensure compliance with the Environmental Protection Agency’s Safe Drinking Water Act and the 2021 Lead and Copper Rule Revisions. This project involves identifying and confirming the construction materials of the service lines through various inspection methods, including visual observation, soft dig/vacuum techniques inside meter boxes, and potholing. Due to potential site limitations, inspections may sometimes require manual excavation with hand tools such as shovels. The verification work is scheduled to take place over a one-year period from April 2026 to April 2027. Contractors must submit their proposals by February 23, 2026. The solicitation is managed by the Town of Payson’s Public Works, Water department in Arizona, with Kyle Christiansen, the Director of Capital Improvements, serving as the primary contact for this project. The effort is a key component of the town’s efforts to meet federal regulatory requirements and ensure safe and compliant water infrastructure.

General Info

Town of Payson seeks contractors for one-year water service line inventory and compliance verification.

Documents

3

RFP 2026-001 Water Service Line Materials Field Verification

PDF, High priority: read this first4 pages · rfp
High

RFP 2026-001 Water Service Line Materials Field Verification

PDF, High priority: read this first50 pages · rfp
High

Water Lead Services RFP 2026-001 Exhibit B Fee Proposal

PDF, High priority: read this first2 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Public Works, Water
Contacts1 person available
OfficePayson, AZ, 85541, USA
Organization / AgencyArizona → Public Works, Water
Office AddressPayson, AZ, 85541, USA
Contacts
Kyle ChristiansenDirector of Capital Improvements

Interested Companies (13)

BexTempe, AZ
JR EngineeringCentennial, CO
Mountain Top DevelopmentShow Low, AZ

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Town of Payson issues this Request for Proposals (RFP) to solicit proposals from qualified contractors to conduct a water service line materials inventory and verification to be in compliance with the Environmental Protection Agency's Safe Drinking Water Act, 2021 Lead and Copper Rule Revisions (LCRR). The Town anticipates that approximately 1,300 service lines will require field verification to confirm their construction material. Field verification will take place between April 2026 and April 2027. Inspections may require visual, soft dig/vacuum inside meter box, or pothole type activities. Inspection sites may have limited access for use of equipment and require manual excavation using shovels, or other hand tools.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS