Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WATER SERVICES DEPARTMENT SMALL DIAMETER ASSET REPAIR AND REPLACEMENT JOB ORDER CONTRACT

Closed
JOC 246State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Phoenix has issued solicitation JOC 246 for a Job Order Contract (JOC) titled "Water Services Department Small Diameter Asset Repair and Replacement Job Order Contract." This contract is structured as an indefinite delivery/indefinite quantity (IDIQ) agreement aimed at managing small diameter asset repairs and replacements within the City’s water services infrastructure. The procurement process requires submission of qualifications via the City’s designated online portal by February 20, 2026. The contract places a strong emphasis on adherence to comprehensive project specifications, including detailed breakdowns of costs by trade following Construction Specification Institute (CSI) and Maricopa Association of Governments (MAG) divisions, and it mandates the inclusion of signed plans and specifications with thorough clarifications and assumptions. While specific pricing or total contract value estimates were not provided, the documentation indicates that proposals must be accompanied by schedules of values, bid comparisons, and robust supporting evidence of subcontractor outreach, among other compliance requirements. A critical feature of this contract is the mandated Small Business Enterprise (SBE) participation program, which requires the prime contractor to meet an annual SBE subcontracting goal of at least 4%, ensuring economic opportunities for certified local small businesses. Only City-certified SBEs count toward this goal, and all subcontractors must be approved by the City through a formal process that includes qualifications-based selection or competitive bidding. The City enforces compliance rigorously through submission of Letters of Intent, Statements of Proposed SBE Utilization, and regular audit reporting via the City’s online compliance portal. Noncompliance can result in withheld payments or contract termination. Past performance evaluations form an important part of the award process, using multi-factor qualitative assessments derived from references and project outcomes covering schedule adherence, quality, innovation, and willingness to contract again. Administrative and contract management responsibilities rest with the City’s Design and Construction Procurement office, with the primary point of contact being the designated Contracts Specialist. Bonding, insurance, and subcontractor cost negotiations follow strict procedural guidelines, and proposals must meet detailed organizational and formatting standards before electronic submission. Overall, the contract reflects the City’s priorities of transparency, quality, local economic support, and comprehensive oversight in executing critical water services infrastructure repairs.

General Info

City of Phoenix IDIQ contract for small diameter water asset repairs with 4% SBE participation required.

Documents

10
DOC, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first2 pages · sbe-loi-form
High
PDF, High priority: read this first3 pages · contract-document
High
DOCX, High priority: read this first5 pages · contractor-reference-check
High
PDF, High priority: read this first1 page · sbe-utilization-form
High
PDF, High priority: read this first5 pages · reference-check-instructions
High
PDF, High priority: read this first4 pages · sow
High
PDF, High priority: read this first1 page · joa-summary
High
PDF, High priority: read this first15 pages · rfq
High

Read all 10 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA

Full Description

Show more
The City of Phoenix is requesting qualifications for Project Title . Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before Response Submission Time on Response Submission Date .

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be responsible for developing two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include site operation management, safety oversight, and a requirement for 24-hour, 7-day emergency response coverage with on-site arrival within two hours of notification. The project also includes an add alternate for ADA upgrades, specifically adult changing stations, and may require the use of the UNIFIER project management database. Qualified firms must submit a Statement of Qualifications (SOQ) and a separate bonding capacity statement from a surety company rated A- or better by December 11, 2026. The SOQ is limited to 12 pages and must be submitted electronically via the City's Procurement Portal. Evaluation criteria focus on the firm's general information, key personnel, and experience with at least three comparable CMAR projects. The contract emphasizes Small Business Enterprise (SBE) participation, requiring the CMAR to implement goals for local SBEs located within Maricopa County. Required documentation for GMP submittals includes a Contractor’s Statement of Proposed SBE Utilization and Letters of Intent for each SBE subcontractor. There is no specified set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261). This on-call program focuses on the rehabilitation of sanitary sewer pipes, primarily those with 8-inch to 15-inch diameters, using cured-in-place pipe (CIPP) lining as the primary method, alongside occasional dig-and-replace operations. The scope of work includes CIPP structural liner installation, PVC-liner repair, manhole rehabilitation, sewer cleaning, CCTV digital scans, bypass pumping, and trenching. The contract has a duration of 36 months with a potential value of up to $50,000,000, though individual JOCs are capped at $30,000,000. Selection is based on a qualifications-based process using Statements of Qualifications (SOQs), with evaluation factors including general firm information, Arizona contractor licensing, and performance evaluations from references. Submittals must be electronic, in PDF format, and limited to 10 pages, excluding the information sheet and a required separate bonding capacity statement. The response deadline is November 30, 2026, at 12:00 pm Phoenix time. While the contract includes Small Business Enterprise (SBE) clauses and reporting requirements, the specific SBE goal for this project is set at 0.00%. There is no specific set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. Located near W. Lower Buckeye Road and S. 99th Avenue, the project has an estimated construction cost of $9.7 million. The scope includes the construction of a 12,000 square foot branch library with associated parking and landscaping, as well as significant street improvements including a new traffic light at 95th Avenue, bike lanes, and center medians. The selected CMAR will be responsible for delivering the project through a Guaranteed Maximum Price (GMP) contract, with the GMP required to be submitted in MAG or CSI format. Selection is based on a qualifications-based process evaluating project approach, firm experience, key personnel qualifications, and reference checks, with additional points awarded for interviews. Applicants must submit a Statement of Qualifications (SOQ) in PDF format, not exceeding 20 pages, along with a separate bonding statement from a surety company rated A- or better. Submissions are due by December 4, 2026, via the City's Procurement Portal. The project incorporates a Small Business Enterprise (SBE) program, requiring contractors to submit a Statement of Proposed SBE Utilization and Letters of Intent. Administrative requirements include the use of the UNIFIER project management database for invoicing and progress payments.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS