This Solicitation opportunity from Washington was posted on August 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Vancouver in Washington is seeking qualified firms to provide comprehensive consulting services for the design and construction of new water sources, elevated water storage, and a Per- and Polyfluoroalkyl Substances (PFAS) treatment system at Water Station 3. The scope includes developing detailed construction bidding plans and specifications, as well as offering engineering support throughout the construction phase. This project is expected to be funded by federal and state sources, requiring strict adherence to all applicable rules, regulations, statutes, and policies mandated by the funding entities. The contract aims to ensure the successful planning, design, and implementation of critical water infrastructure upgrades to enhance water quality and system reliability.
The solicitation, titled "Water Station 3 Source, Storage and Treatment System Design," was posted on August 26, 2025, with a response deadline of September 17, 2025. The project’s estimated value ranges from five to fifteen million dollars, and it falls under the NAICS code 541611, which pertains to administrative management and general management consulting services. Interested firms can find additional details and submit their qualifications through the City of Vancouver’s Bonfire portal. This initiative underscores the city’s commitment to improving its water infrastructure while complying with federal and state funding requirements.
HighAI Summary for 12-02506 Concrete Curb Specifications: This document, Section 02506, dated latest edition of PennDOT Publication 408, details the specifications for concrete curb and curb walls construction. It includes general work requirements, related work references, material standards, submittal requirements, and execution procedures. Key content covers materials such as PennDOT Class AA concrete, premolded expansion joint filler, and curing materials. Execution instructions include subgrade preparation, formwork, joint placement, concrete placing and finishing, protection and curing, and acceptance criteria. The document ensures compliance with PennDOT standards and outlines contractor responsibilities for quality and acceptance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 17-9695-2001-3 Sidewalk Detectable Warning Surface Specifications: This document, titled '17-9695-2001-3 Sidewalk Detectable Warning Surface,' provides detailed specifications for furnishing and installing detectable warning surfaces (DWS) on cement concrete sidewalk curb ramps and other designated surfaces. It ensures compliance with the Americans with Disabilities Act Accessibility Guidelines (ADAAG). The document includes material requirements such as DWS product standards, color contrast, and slip resistance, as well as construction instructions for new and retrofit installations. It also outlines coordination with PennDOT Engineering Technology and Information Division and protection measures for the installed surfaces.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 18-02545 Superpave Asphalt Mixture Design HMA Base Course: This document, titled '18-02545 Superpave Asphalt Mixture Design HMA Base Course,' outlines the specifications for installing a certified plant-mixed Hot Mix Asphalt (HMA) base course. It includes design standards referencing PennDOT Publication 408, mixture acceptance criteria, material requirements, equipment specifications, and detailed construction methods such as temperature restrictions, surface preparation, spreading, finishing, and joint construction. The document ensures compliance with PennDOT standards for both Borough Roads and State Highways, specifying mix design, performance grades, mat thickness, and acceptance testing procedures. It serves as a technical guide for contractors to achieve proper installation and quality control of the asphalt base course.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 2-02010 Maintenance and Protection of Traffic: This document, Section 02010, titled 'Maintenance and Protection of Traffic During Construction,' outlines the requirements for traffic control and safety measures during construction activities. It includes general work scope such as providing barricades, signs, flagmen, and temporary decking, and mandates maintaining vehicular and pedestrian access, emergency access, and compliance with PennDOT Publication 203 and 67 PA Code Chapter 203. Special requirements detail lane maintenance, signage for road closures, safety fencing, and the Engineer's authority to halt work if traffic control is inadequate. The document ensures safe and continuous traffic flow and access throughout construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 23-02507 Concrete Sidewalk and Handicap Ramps Specifications: This document, Section 02507, details the specifications for constructing concrete sidewalks and handicap ramps. It includes general work requirements, related work references, and standards per Pennsylvania Department of Transportation (PennDOT) Publication 408. The document specifies materials such as air-entrained concrete, aggregate subbase, expansion joint filler, and curing materials. Execution instructions cover subgrade preparation, aggregate placement, formwork, joint placement, concrete placement, finishing, protection, curing, and acceptance criteria. The document ensures compliance with PennDOT standards and includes quality control measures like material certificates and delivery slip submissions. Dated with Job No. WCON 1509, it serves as a technical guide for contractors to meet ADA and PennDOT requirements for sidewalk and ramp construction.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 3-01201 Preconstruction Conference: This document is Section 01201 titled Preconstruction Conference, outlining procedures for a conference conducted by the Engineer prior to the start of construction work. It specifies attendance requirements, agenda topics including organizational arrangements, communication channels, construction schedule, contract documents, shop drawing processing, change orders, and safety procedures. The conference is scheduled within ten working days after contract execution but before work begins. The document also covers quality assurance and submittal instructions related to the conference.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 4-01700 Project Closeout: This document is Section 01700 titled Project Closeout, detailing procedures and requirements for project completion. It covers substantial completion notification, final observation and certification, second observation fees, closeout submittals, spare parts and maintenance materials, final adjustment of accounts, and final application for payment. The document outlines contractor responsibilities for submitting notices, certifications, and final accounting statements, as well as the engineer's role in observations and approvals. It is a critical section for ensuring proper project closeout and contract fulfillment.
PDF
PDF, High priority: read this firstspecial-provisions
HighAI Summary for 7-01001 Special Provisions for Handicap Ramp Replacement: This document, titled '7-01001 Special Provisions,' outlines the general and specific provisions for a contract involving the removal and replacement of non-conforming handicap ramps to meet new regulations. It includes a non-mandatory contract schedule with key milestones, requirements for pre-construction video documentation, bidder qualifications, coordination mandates, and construction progress meetings. The provisions emphasize maintaining access in residential and commercial areas, working within easements, handling existing conditions, material storage restrictions, compliance with nuisance ordinances, and procedures for addressing deficient work. The document also details restoration timelines and contractor responsibilities, serving as a critical guide for bidders and contractors to prepare and execute the contract in compliance with all specifications and regulations.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Borough of West Conshohocken ADA Compliance Construction Documents: This document is a comprehensive solicitation package for the Borough of West Conshohocken's ADA Compliance project involving removal of architectural barriers under the 2022 & 2023 CDBG Grant. Prepared by Pennoni Associates, dated June 2025, it includes advertisement, instructions to bidders, forms of bid and guaranty, general and special conditions, federal requirements, construction specifications, form of agreement, contract bonds, and contract drawings. It provides detailed guidance on bidder responsibilities, bid submission via PennBid, pre-bid and pre-construction meetings, and compliance with federal and local regulations. The document serves as the primary solicitation and contract framework for prospective contractors.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Borough of West Conshohocken ADA Compliance Removal of Architectural Barriers Bid: This document is a public notice and invitation for sealed bids for the ADA Compliance project involving the removal of architectural barriers in the Borough of West Conshohocken, Montgomery County, Pennsylvania. The project includes removal and installation of concrete curbs, sidewalks, ADA ramps with detectable warning surfaces, crosswalk striping, and related restoration. Bids are due by September 15, 2025, with a pre-bid meeting on September 5, 2025. The project is funded under the CDBG grant and subject to HUD Section 3 and Davis-Bacon Act wage requirements. Bid bonds of 10% are required, and the Borough reserves the right to reject any or all bids.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Invitation for Bids - Montgomery County CDBG Program: This document is a suggested format for an Invitation for Bids (IFB) related to a project under the Montgomery County Community Development Block Grant (CDBG) Program. It outlines the bidding process including submission deadlines, bid opening procedures, and contract award criteria. The document emphasizes compliance with federal requirements such as Section 3 of the Housing and Urban Development Act of 1968, prevailing wage laws, and equal employment opportunity mandates. It also details pre-bid and pre-construction meetings, bid bond requirements, and the right of the Township/Borough to reject bids. The IFB ensures bidders are informed about wage rates, affirmative action, and debarment regulations. The document is dated October 31, 2023, and serves as a formal solicitation for sealed bids for construction work.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01010 Contractors Work - Handicap Ramp Construction: This document is Section 01010 titled 'Contractors Work' for a construction project involving the removal and replacement of non-conforming handicap ramps to comply with ADA regulations. It outlines the contractor's responsibilities including furnishing all materials, labor, equipment, and supervision, adhering to construction limits, measurement and payment terms, construction sequencing, protection of work and property, cleanup, and compliance with permits and regulations. The document emphasizes the importance of schedule adherence, protection of public and property, traffic control, and restoration of disturbed areas. It also specifies the provision of contract drawings and specifications to the contractor and the requirement for construction stakeout and documentation. The document serves as a statement of work defining the scope and execution requirements for the contractor.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01025 Measurement and Payment for Handicap Ramp Replacement Project: This document is Section 01025 titled 'Measurement and Payment' for a construction project involving handicap ramp replacement. It outlines the criteria for measurement and payment under unit price and lump sum methods, including defect assessment and non-payment for rejected work. The document specifies measurement methods by number, volume, area, and linear dimensions, and details payment inclusions such as labor, materials, equipment, and incidental work. It also covers procedures for defect replacement and conditions for non-payment of rejected products. The section includes specific payment terms for ADA ramp removal and construction, referencing compliance with RC-67M curb ramp standards and requiring inspections by the Borough Engineer. The document serves as a statement of work defining measurement, payment, and quality control requirements for the project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01340 Shop Drawings, Samples: Section 01340 outlines the requirements for submitting Shop Drawings, Product Data, and Samples as part of the contract documents. It includes instructions on the preparation, content, and submission of these documents, specifying the number of copies required and the necessary information to be included such as project title, contract number, contractor and manufacturer details, and identification of deviations. The section also covers resubmission requirements, emphasizing corrections and changes until approval by the Engineer. This document is essential for ensuring proper coordination and verification of construction details.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01800 Mobilization and Demobilization: This document is Section 01800 titled Mobilization and Demobilization, outlining the contractor's responsibilities for mobilizing and demobilizing personnel, equipment, and supplies for contract work. It includes general requirements such as transportation, establishment of facilities, and bond premiums for mobilization, as well as removal, site cleanup, and disposal during demobilization. Special requirements emphasize compliance with transportation laws and thorough site cleanup. The section defines the scope of work and cost considerations related to mobilization and demobilization activities under the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02210 Rough Grading Specifications: This document, Section 02210 titled Rough Grading, outlines the general and technical requirements for site grading work including preparation of subgrades for roadways, pavements, and walks. It references standards such as PennDOT Publication 408, AASHTO, and ASTM for soil and construction specifications. The document defines suitable and unsatisfactory soil materials, excavation procedures, quality assurance, job conditions, and requirements for soil backfill and fill materials. It also covers excavation classifications, unauthorized excavation, undercut excavation, stability of excavations, and dewatering methods. The document is intended to guide contractors in performing rough grading work in compliance with applicable codes and engineering standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02260 Finish Grading Specifications: This document is Section 02260 titled 'Finish Grading' and outlines the requirements for placing, compacting, and rolling finish grade materials prior to landscaping work. It includes general descriptions, related work references, protection measures, materials specifications for onsite and offsite topsoil, and detailed execution instructions for subsoil preparation, topsoil placement, and handling surplus material. The document specifies compaction standards, moisture content requirements, and grading tolerances to ensure proper finish grading within 30 days after rough grading completion.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02547 Superpave Asphalt Mixture Design and Wearing Course: This document, Section 02547, outlines the specifications for Superpave Asphalt Mixture Design, HMA Binder, and Wearing Course. It includes general descriptions, design standards, mixture acceptance criteria, material requirements, equipment specifications, and construction methods. The document references PennDOT Publication 408 for standards and acceptance procedures. Key content covers mix design, performance grades, equipment use, temperature and weather restrictions, surface preparation, spreading and finishing techniques, and joint construction. The document is intended to guide contractors in installing certified plant-mixed asphalt mixtures to meet specified quality and performance standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02930 Lawns and Grasses Specifications: This document, Section 02930, dated as per the latest edition of PennDOT Publication 408, details the specifications for lawns and grasses work related to construction projects. It covers temporary and permanent seeding, sodding, and restoration of disturbed areas, including materials like topsoil, seed, sod, limestone, fertilizer, mulch, and mulch anchoring. The document specifies product requirements, construction methods, submittals such as certificates for sod, seed, and fertilizer, and references standards from the Association of Official Seed Analysts, American Sod Producers Association, and PennDOT. It provides detailed instructions on sod handling, placement, and maintenance to ensure proper establishment and erosion control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03300 Concrete Specifications: This document is Section 03300, detailing concrete specifications for a construction project. It includes general work requirements, submittals, product standards, and execution methods. The document references standards such as ACI 318, ACI 301, ASTM-C150, ASTM-C33, and ASTM C94. Key content covers concrete mix design, materials (cement, aggregates, water, admixtures), concrete qualities (compressive strength, slump, air content), metal reinforcement standards, and detailed execution instructions for mixing, placing, curing, and testing concrete. The document ensures compliance with industry standards and provides technical guidance for concrete work.
PDF
PDF, Low priorityother
LowAI Summary for 27-2023 CDBG Ramp Intersections with Photos: This document titled '27-2023 CDBG Ramp Intersections (with photos)' appears to contain photographic or visual documentation related to ramp intersections at Matsonford Commons Private, located at 501 - 541 Bullock Avenue. The content references multiple ramps (Ramp 1, Ramp 2, Ramp 3) and includes numerous page splits, suggesting a collection of images or visual data. There is no indication of solicitation, contract, or technical specification content within the provided text.
The City of Vancouver is seeking statements of qualifications from qualified firms to provide consulting services to develop construction bidding plans and specifications for the construction of new sources, elevated water storage, Per-an Polyfluoroalkyl Substances (PFAS) treatment system and disinfection upgrades at Water Station 3 and provide engineering support services during construction. It is anticipated that the project under this agreement will be federally and state funded and as such all rules, regulations, statutes and policies whatsoever required by the funding source must be followed.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award