Water System Improvement & Treatment Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of McFarland

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Elmo Highway, McFarland, CA, 93250

Set-Aside

NONE

Documents

(5)

IS-MND 10-29-2025 Water System Improvement & Treatment Project Environmental Documentation

PDFmitigated-negative-declaration

2025111093_SWRCB Comment Letter on IS/MND for Water System Improvement Project

PDFcomment-letter

City of McFarland Water System Improvement & Treatment Project NOI

PDFnotice-of-intent

Notice of Completion & Environmental Document Transmittal - Water System Improvement & Treatment Project

PDFenvironmental-document-transmittal

Summary Form for CEQA Document Submittal - Water System Improvement & Treatment Project

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of McFarland
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of McFarland
Office AddressN/A
Contacts
Curtis M SkaggsProject Engineer
Yerlys HernandezPublic Works Director

Interested Companies (1)

Show more
Dee Jaspar & Associates
Bakersfield, CA

Full Description

Show more
The proposed project is for the City of McFarland (City) and involves drilling and equipping a new municipal water well, construction of an oxidation, coagulation, filtration iron removal water treatment system, construction of a welded steel water storage tank and booster station, and a connection to the existing City distribution system. The well site property is approximately 100-ft by 400-ft or approximately 0.9-acres. The site is currently a vacant, unimproved lot. The earthwork will involve moving approximately 1,000 cubic yards which will be off-hauled for disposal off site as directed by the City. The site grading is anticipated to involve approximately 20 working days. It is anticipated that the following pieces of equipment will be used during construction activities: • Loader • Backhoe • Excavator • Skip and Drag • Sheepsfoot Compactor • Rammax Compactor • Whacker Packers The site earthwork requirements include over-excavation to 18-inches below proposed concrete foundations and will be recompacted to 90% relative compaction to reduce the potential for settlement. Concrete foundations will be constructed for the deep well pump and motor, the booster pump foundations, the skid-mounted LayneOx treatment system, storage tank foundations, chemical building foundations, electrical foundation, and the hydropneumatic tank footings. The well site property will be secured with approximately 930-ft of 8-ft tall masonry block wall and include drive gates and a personnel gate to Elmo Highway for site access. The well site will be surfaced with a combination of ¾” Class II aggregate base and hot mix asphalt paving, with the limits being the perimeter block wall. The well is planned to be drilled to an approximate depth of 900-ft using the reverse rotary method. Water quality zone testing will be performed in the well pilot hole. The well construction work will include installing a 50-ft deep, 36-inch diameter steel conductor, drilling a 17 ½ - inch diameter pilot hole, performing geophysical logging, water quality depth sampling, reaming of the pilot hole to 28-inch diameter, installation of 16-inch diameter steel casing, installation of gravel pack, installation of a bentonite annular seal, and well development. The initial development water will be disposed of in a 20,000-gallon tank and removed from the site. The development water will then be discharged to the existing adjacent storm drain sump. It is expected that the completed well will exceed the secondary drinking water standard for iron and that well head treatment in the form of oxidation, coagulation, and filtration will be used to remove iron. The production well drilling phase will involve the drilling, construction, and development of a new municipal water supply well. It is anticipated to involve approximately 90 working days with active well drilling taking place 24 hours per day, seven days per week for approximately 45 of those working days. It is anticipated that the following pieces of equipment will be used during construction activities: • Well Drilling Rig with Pipe Trailer • Mud Pits • Backhoe • Loader • Forklift The deep well will have a 10-ft by 10-ft by 30-in thick concrete foundation and be equipped with a vertical turbine pump and vertical hollowshaft electric motor with a variable speed drive. The well will have a 10-ft by 10-ft by 11-ft high removable metal enclosure building for noise attenuation. The 12-inch well discharge piping will be metered using an electromagnetic flow meter. The well discharge flow will be divided so that approximately two-thirds of the flow is conveyed to a skid-mounted LayneOx iron treatment system with a concrete foundation that is 68-ft by 19-ft by 24-in thick. The remaining one-third of the well flow will bypass the LayneOx iron treatment system. The bypass flow rate will be regulated using an automatic modulating control valve and will be blended with the treated flow from the LayneOx iron removal treatment system. The blended flow will be conveyed into an AWWA D100 welded steel storage tank that will be constructed with a concrete ringwall foundation and oiled sand cushion. The storage tank dimensions will be 60-ft diameter and 24-ft side shell height. The storage tank outlet piping will be 18-inch diameter steel piping that feeds the suction header for three horizontal centrifugal split-case booster pumps. Each booster pump will have a concrete foundation that is 3-ft by 6-ft by 36-in thick. The booster pumps are each equipped with variable speed drives. Two of the pumps are 50hp and the third pump is 100hp. The pump discharge piping then enters a 12-in diameter discharge header. The discharge header enters a 3,000-gallon hydropneumatic pressure vessel which will be anchored to two concrete footings each 13-ft long by 5-ft wide by 24-in thick. The 12-inch diameter booster station piping will transition below ground after the pressure vessel and transition to 12-inch C900 PVC pipe that will connect to the existing 12” PVC City distribution system water main that runs along the north side of the well site on the south side of Elmo Highway. In addition, there will be a 144,000-gallon backwash tank with dimensions of 32-ft diameter and 24-ft side shell height. The tank will be an AWWA D100 welded steel storage tank on a concrete ringwall foundation and oiled sand cushion. The backwash tank will drain the supernatant back to the well discharge for treatment and/or drain to the City sewer. There will be two fiber-reinforced polymer (FRP) chemical enclosure buildings to house the dual-walled chemical storage tanks, duplex chemical feed pump skids, and the continuous reagent-free pH and chlorine analyzer. The first FRP building (18 ft × 12 ft) will provide protection for the 550-gallon chlorine storage tank, the 150-gallon ferric chloride storage tank, and the duplex chemical feed pump skids. These pumps will inject chlorine and ferric chloride for chemical pre-treatment of the raw groundwater prior to filtration through the LayneOx media. The second FRP building (10 ft × 12 ft) will house the 550-gallon sulfuric acid storage tank and the duplex chemical feed pump skid used for sulfuric acid injection. This system will provide pre-treatment pH adjustment upstream of the LayneOx filter media vessels. The well and treatment facility will be painted a neutral color (tan) and site landscaping installed around the perimeter of the site for it to be aesthetically pleasing and blend in with the adjacent community and neighborhood. The well equipping and site development phase is anticipated to involve approximately 12 months. However, the equipment will not run continually or daily throughout this entire construction period. It is anticipated that the following heavy pieces of equipment will be used for approximately 180 working days during construction activities: • Excavator • Loader • Backhoe • Crane • Concrete Trucks • Generator • Air Compressor • Small Tools • Service Trucks Construction of the project is anticipated to span an approximate 18-to-24-month period. The well site will be routinely visited by a City operator – typically once per day to check on the operation and inspect for any issues along with the preparation of a daily report. Routine maintenance operations will include: • Well Lubrication Check - daily • Chlorine Tank Level Check – daily • Sulfuric Acid Tank Level Check – daily • Ferric Chloride Tank Level Check – daily • Chlorine Residual Check – daily • pH Check – daily • Iron Level Check – daily • Water Production Reading Check – daily • Booster Pump check – monthly • Well water level measurements – monthly • Air Conditioning service – annually • Site Cleanup - quarterly A back-up emergency generator will also be installed as part of this project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 12 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS