Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Water System Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Allensworth Community Services District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Allensworth Water Well Project Amendment 1

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Allensworth Community Services District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Allensworth Community Services District
Office AddressN/A
Contacts
Sarah BahmSenior Environmental Scientist (Specialist)

Full Description

Show more
CDFW has issued a CESA (Fish & G. Code, § 2050 et seq.) ITP and this Amended ITP (Major Amendment No. 1) to authorize the Allensworth Community Services District to incidentally take blunt-nosed leopard lizard (Gambelia sila) which is listed as fully protected pursuant to Fish and Game Code section 5050 and endangered under CESA (Cal. Code Regs. tit. 14 § 670.5, subd. (a)(4)(B)), Tipton kangaroo rat (Dipodomys nitratoides nitratoides) listed as endangered under CESA (Cal. Code Regs. tit. 14 § 670.5, subd. (a)(6)(D)), and San Joaquin antelope squirrel (Ammospermophilus nelsoni), San Joaquin kit fox (Vulpes macrotis mutica), and Swainson’s hawk (Buteo swainsoni) which are listed as threatened under CESA (Cal. Code Regs. tit. 14 § 670.5, subd. (b)(6)(B), (b)(6)(E), and (b)(5)(A), respectively), collectively the Covered Species. This Amended ITP (Major Amendment No. 1) amends the original ITP issued on October 27, 2023, to include revisions of the Project Location and Project Description as follows: revising the location of the temporary discharge pipe associated with Pipeline Tie-In 1 for accuracy; removing construction of the permanent discharge pipe associated with Pipeline Tie-In 1; removing the new Water Storage Facility Site; adding a temporary water tank and booster pumping station that will be constructed prior to demolition of the existing Water Storage Facility and all other infrastructure located at that Site; adding that once demolition is complete, the new Water Storage Facility will be constructed at that same location; and updating relevant sections, Conditions of Approval, Figures, and Attachments for consistency with, and to reflect updates to, the Project Location and Project Description. The resulting impacts of the Project to the Covered Species have decreased with these changes. The Project is to supply critical drinking water and fire protection to the community of Allensworth. The Project involves the drilling, construction, and development of new water well infrastructure at a new site and connection to the existing water pipeline infrastructure; eventual decommissioning of the existing Water Well Sites and potential decommissioning of the new Water Well Site; construction of a temporary water system, demolition of the existing Water Storage Facility and associated infrastructure, and construction of a new Water Storage Facility at the same site; and maintenance, repair, and improvement activities of the Water Well Sites and Water Storage Facility. The Project is now expected to cause the permanent loss of 0.58 acre and temporary loss of 0.50 acre of non-native grassland which provides suitable habitat for the Covered Species and permanent loss of 0.26 acre and temporary loss of 0.023 acre of ruderal/low quality habitat features suitable for the Covered Species. The Amended ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation. Incidental take of blunt-nosed leopard lizard may be authorized pursuant to Fish and Game Code section 2081.12. Additionally, Senate Bill 147 was enacted to add section 2081.15 to the Fish and Game Code to allow CDFW to authorize the take of a fully protected species in subdivision (b) of section 5050 resulting from impacts attributable to the implementation of a maintenance, repair, or improvement project to critical regional or local water agency infrastructure if the conditions set forth in Fish and Game Code section 2081.15, subdivisions (a-f) are met (See Cal. Code Regs., tit. 14, § 783.4, and Senate Bill No. 147, stats. 2023). The Permittee will purchase one (1) Covered Species credit equaling one acre from the Kern Water Bank Authority Conservation Bank and deed 0.46-acres of Habitat Management land to CDFW for management in perpetuity that will include a monitoring program and an adaptive management plan, approved by CDFW for monitoring the effectiveness of, and adjusting as necessary, the measures to minimize and fully mitigate the impacts of the authorized take of the species.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS