Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water System Improvements Contract C: Fire Hydrant and Valve Installation

Closed
PE-66395-NONST-2026-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves the construction and installation of water system improvements in Dawson, Georgia, specifically focusing on replacing approximately 27 fire hydrants with associated isolation valves, hydrant leads, fittings, and connections to the existing water main. Additionally, the project includes the installation of three meter vaults with valves, piping, and fittings, along with pavement restoration and all necessary appurtenances to ensure a complete and functional water system. The work must be completed within 240 consecutive calendar days, with bids due by December 10, 2025, at 2:00 PM, and will be publicly opened at Dawson City Hall. The project is funded in part or entirely by Georgia Environmental Finance Authority (GEFA) SRF monies, requiring strict compliance with federal and state regulations, including affirmative action under 41 CFR 60-4 and the American Iron & Steel Act, which mandates the use of domestically produced materials. Bidders must hold a valid Georgia utility contractor license, submit bid bonds, and adhere to bonding requirements of 10% bid bond and 100% performance and payment bonds issued by a licensed surety. The scope of work emphasizes adherence to the project plans and specifications, with no prebid conference scheduled. The project is awarded as a single contract, with the owner reserving the right to reject any or all bids. The procurement process requires sealed bids, which must be submitted to Dawson City Hall, with digital plans accessible via QuestCDN for a fee. Contract clauses highlight compliance with federal and Georgia-specific laws, including immigration and security laws, and specify that all materials used must comply with the AIS Act. The contract administration details indicate that Dawson, GA, is both the place of performance and inspection, with the city responsible for final acceptance. While detailed evaluation criteria and award basis are not explicitly provided, the process mandates bid bonds, licensing, and compliance with funding stipulations, ensuring that only qualified, compliant bids are considered for award.

General Info

Documents

1

City of Dawson Water System Improvements Contract C Advertisement for Bids

PDF, High priority: read this first4 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66395 DAWSON, PE-66395-NONST-2026-000000004 to PE-66395-NONST-2026-000000004.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Dawson
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Dawson
Office AddressN/A

Full Description

Show more
Sealed bids for construction of the Water System Improvements Contract C: Fire Hydrant and Valve Installation will be received until December 10, 2025 at 2:00 PM at Dawson City Hall, 101 South Main Street, Dawson, GA 39842, at which time and place they will be publicly opened and read aloud. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. Work to be done shall consist of the replacement of +/-27 fire hydrants including isolation valves, hydrant lead, fittings and connections to existing water main; installation of three meter vaults including valves, piping, and fittings; pavement replacements, and all appurtenances necessary for a complete installation. Time allotted for completion of work is 240 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. This project is funded in part or whole by GEFA SRF monies. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project. The funding for this project also requires that all materials used in construction comply with the American Iron & Steel (AIS) Act

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS