Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on October 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water System Improvements West of CSX Railroad

Closed
PE-68990-NONST-2025-000000020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves the installation of approximately 3,900 feet of 12-inch PVC water main, 6,500 feet of 10-inch PVC water main, and 7,900 feet of 8-inch PVC water main, along with the installation of fire hydrants, railroad and roadway bores, service laterals, and related appurtenances in the area west of the CSX Railroad in Liberty County, Georgia. Bids must be submitted by November 21, 2024, at 2:00 P.M., with proposals opened publicly at that time, and no submissions can be withdrawn for sixty days afterward. The project emphasizes a Minority and Women Business Enterprise (M/WBE) participation goal of 13%, with 10% designated for MBE and 3% for WBE, requiring all M/WBE documentation to be submitted separately and sealed to avoid rejection. The owner retains the right to reject any or all proposals and to waive informalities. The project is managed by the Liberty County Board of Commissioners, with a contract value estimated between 1.5 million and 3 million dollars. Interested bidders can contact P.E. Trent Long via email or phone for further details. The solicitation is posted under NAICS code 237110, reflecting its scope within water and sewer line construction, and additional information is accessible through the provided online link. The project aims to enhance the water infrastructure in the specified area, ensuring compliance with set participation goals and procurement procedures.

General Info

Agency

Georgia → Liberty County Board of Commissioners

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

Liberty County Board of Commissioners - Water System Improvements West of CSX Railroad RFP

DOC, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 68990 LIBERTY PE-68990-NONST-2025-000000020 to PE-68990-NONST-2025-000000020.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Liberty County Board of Commissioners
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Liberty County Board of Commissioners
Office AddressN/A

Full Description

Show more
Sealed proposals will be received by the Liberty County Board of Commissioners at 112 North Main Street Hinesville, Georgia 31313 until 2:00 P.M. local time on Thursday, November 21, 2024, at which time and place they will be publicly opened and read. No submitted proposals may be withdrawn after the scheduled closing time for receipt of proposal for a period of sixty (60) days. The work to be done consists of the installation of approximately 3,900 feet of 12¿ PVC water main, approximately 6,500 feet of 10¿ PVC water main, approximately 7,900 feet of 8¿ PVC water main, fire hydrants, railroad and roadway bores, service laterals and appurtenances. The M/WBE goal for this project is 10% MBE and 3% WBE, for a total M/WBE participation of 13%. All M/WBE documents must be submitted in a separate sealed envelope, otherwise the proposal may be rejected. The Owner reserves the right to reject any or all proposals and to waive informalities.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS