Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 16, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WATER TREATMENT - WASH RACK

Awarded
W44W9M15T0362Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation number W44W9M15T0362, is a total small business set-aside issued by the McAlester Army Ammo Plant for the procurement and installation of a specialized wash rack system in Oklahoma. The system is designed to clean fiberglass and aluminum munitions containers using either soap or formic acid. The physical installation consists of a 14 foot wide by 32 foot long grit impregnated, epoxy coated steel rack featuring 6 foot high galvanized side walls to contain overspray, ramps at both ends, and a center French drain. The structure is rated for loads up to 12,000 pounds per axle and includes a diaphragm pump for the evacuation of spent water. The integrated water treatment system utilizes a 304L stainless steel weir with an inclined plate separator, an oil removal chamber with a disk skimmer, and high-pressure filtration to remove suspended solids, heavy metals, and volatile organic compounds, ultimately filtering particles down to 7 microns before discharging into the sanitary sewer. The award includes a PLC-based controls package, all necessary plumbing and wiring, freight, and comprehensive installation and training. The contractor is also required to provide an owner's manual containing operation instructions, component diagrams, and electrical schematics.

General Info

Contract Value

$90,843.9

NAICS

333318 - Other Commercial and Service Industry Machinery Manufacturing

Place of Performance

OK, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Solicitation W44W9M-15-T-0362: Wash Rack System

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W390 Mcalester Army Ammo Plant
Contacts1 person available
OfficeMCALESTER, OK, 74501-5000, USA
Office AddressMCALESTER, OK, 74501-5000, USA
Contacts
Kent W. HackettContract Specialist

Full Description

Show more
1 EACH - WASH RACK, 14 FT. WIDE X 32 FT. LONG, GRIT IMPREGNATED, EPOXY COATED STEEL, 6 FT. HIGH SIDE WALLS. RAMPS BOTH ENDS, PER THE ATTACHED PURCHASE DESCRIPTION. AWARD TO INCULDE INSTALLATION. Synopsis: Fiberglass and aluminum munitions containers come into the facility and need to be cleaned prior to refurbishment. Two systems, one using a soap for cleaning and another using Formic acid, are requested as the there are two specific needs for the process depending on the container in question. A self-contained wash rack is needed for overspray capture and water reclamation. Spent water is captured, treated, and held for reuse or discharged. The system described below would be a treat and discharge type system. System #1 - Water treatment and discharge to sanitary waste stream Wash Rack: A 14 FT. wide x 32 FT. long grit impregnated epoxy coated steel wash rack with center French drain with cover and will have 6 FT. high side walls and ramps on both ends. Hose hooks will be located on opposite corners and allow two operators to work simultaneously. Rack will be no more than 7 IN. tall with a diamond plate, epoxy coated surface with non-slip coating for a safe and durable work surface. The side walls will be galvanized sheet and extend 6 FT. from the floor to contain over spray. A diaphragm pump will connect to the end of the rack below the ramp for evacuation of spent water. The rack will be rated to hold up to 12,000lbs per axle. Water Treatment: The system starts with a weir constructed of 10ga 304L stainless steel which receives waste water from the recovery pump and features an inclined plate separator to settle solids in the large initial chamber. Water flows then to an oil removal chamber where polypropylene coalescing material forms hydrocarbons into droplets which are collected by a disk skimmer. High-pressure, high flow filtration removes suspended solids, heavy metals and volatile organic compounds. The final step is stainless steel absolute filter bringing the particle size down to 7 microns. Water is then discharged to the base sanitary sewer / industrial waste stream. All functions are controlled by system PLC and control panel. The control panel for this system will be sized to allow for future modification to switch to a closed loop system. Water Delivery: Existing pressure washers would be used for application of pressurized water to the items being washed. A remote panel will be included that would allow the operator to start or stop water recovery from the wash pad. If possible, existing pressure washers could be integrated as well (based on the make and model of the existing units). What is to be included: - A complete system for each of these installations. Treatment and recovery equipment as described and the plumbing and wiring between these components. - PLC based controls package including programming and set up. - Installation at facility and training on maintenance and operations of the unit - Freight from manufacturers facility to Oklahoma location - Owner's manual with operation instructions, diagrams showing component parts, and electrical schematics for future reference.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS