Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Well Rehabilitation Tamura Shallow, Dolphin Shallow, And Dolphin Deep

Closed
9598-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Centennial Fire Alarm & CO Detection Upgrade and Maintenance Services
Solicitation # centennial-fire-alarm-co-detection-upgrade-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide fire alarm and carbon monoxide (CO) detection upgrade and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The primary objective is to restore the central Simplex 4020 Fire Alarm Control Center Panel and connected systems across nine campus facilities to full operational status. The scope includes diagnosing and clearing all active trouble statuses, upgrading the FACP motherboard or firmware if necessary, and integrating code-compliant CO detection into the men's and women's dormitories using intelligent multi-criteria detectors and sounder bases. All work must adhere to NFPA 101 (2024), NFPA 72 (2025), IFC (2024), and applicable local building and fire codes. Bids are due by December 1, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form with a detailed cost breakout. A physical site visit is mandatory prior to bid submission. For bids equal to or exceeding $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. This project is subject to the Davis-Bacon Act and Construction Wage Rate Requirements, necessitating the submission of weekly certified payroll reports for payment processing. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award decisions will be based on overall best value, and the contractor must provide final deliverables including NFPA 72 certification, O&M manuals, and digital asset reports for CMMS integration.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 561621
New
International
FOR THE SUPPLY, DELIVERY AND INSTALLATION OF CCTV AT CENTRAL WAREHOUSE IN KUTUPALONG, UKHIYA, COX'S BAZAR UNHCR Supply Unit - [email hidden]
Solicitation # BGD-UNHCR RFQ 3993
The Office of the United Nations High Commissioner for Refugees (UNHCR) has issued Request for Quotation BGD-UNHCR RFQ 3993 for the supply, delivery, and installation of a CCTV system at the Central Warehouse in Kutupalong, Ukhiya, Cox's Bazar, Bangladesh. The scope of work includes the physical installation and commissioning of Hikvision IR Fixed Bullet Network IP Cameras, NVRs with HDDs up to 10 TB, 8-port SFP and PoE switches, a 9U server rack, 1200VA UPS, and 55-inch 4K LED monitors. Technical requirements specify the use of UL Certified, ISO14001 and ISO 9001 compliant UTP Cat 6 outdoor cabling and 4-core SM optical fiber, with a total of 1,800 meters of cable laying through PVC channels and 3,000 meters of fiber optics. Award evaluation is based on a two-part process consisting of a technical proposal and a financial proposal. Technical evaluations focus on company qualifications, including registration certificates and audited reports from the last three years, as well as project references and managerial capabilities. Mandatory certifications for bidders include at least one accreditation for inspection or audits, a minimum of five years of experience in similar services, proof of presence in at least four main countries of origin for their products, and a professional liability insurance policy. All bids must be submitted electronically via the UNHCR Supplier Portal, with strict adherence to deadlines as the system automatically rejects late submissions.
UNHCR

POSTED

about 17 hours ago

DEADLINE

N/A
NAICS: 561621
New
SLED
Digital Watchdog Camera Installation at the Wicomico County Youth & Civic Center - Phase 2
Solicitation # 2027-IFB-040
Wicomico County Recreation, Parks, and Tourism is soliciting bids for the Phase 2 installation of a Digital Watchdog camera system at the Wicomico County Youth and Civic Center. The project requires a qualified vendor to provide all labor, materials, and supervision to deliver a fully operational low voltage video surveillance system. Key technical requirements include the installation of Cat6 cabling infrastructure with proper labeling and testing, the furnishing and installation of various Digital Watchdog IP camera models and a Ubiquiti wireless point-to-multi-point system, and the integration of these devices into the existing Digital Watchdog Spectrum Video Management System. The scope involves a significant deployment across facility areas such as the arena, hallways, and parking lots, with technical device matrices specifying up to 58 devices. The contract will be awarded to the lowest responsive vendor who is licensed to work in Maryland and possesses over five years of similar experience, specifically with Digital Watchdog VMS. Bids must be submitted via the OpenGov e-Procurement Portal by December 7, 2026. Successful vendors must provide a Certificate of Good Standing from the Maryland Department of Assessments and Taxation and evidence of comprehensive insurance. For contracts exceeding 100,000 dollars, performance and payment bonds for 100 percent of the contract price are required. Payment will be issued within 30 calendar days of receiving a proper invoice for approved work. The county also retains the right to allow other governmental entities to piggyback on the awarded contract.
Wicomico County Recreation, Parks, & Tourism

POSTED

about 20 hours ago

DEADLINE

in 20 days
NAICS: 561621
New
SLED
Security Alarm Monitoring, Zone Mapping, and System Maintenance Services
Solicitation # 2627-001
Nogales Unified School District #1 is soliciting proposals for security alarm monitoring, zone mapping, and system maintenance services under solicitation #2627-001. The scope of work requires the contractor to provide a proposed zone list for each district location based on existing site maps and zone lists, perform annual reviews of industry best practices, and maintain a valid contractor's license. The contract includes an initial one-year term with the possibility of four consecutive 12-month extensions. Pricing is categorized into monitoring services, service and repair rates, and optional equipment and installation. All direct services must be performed within the United States. The evaluation process is phased, where any proposal failing non-negotiable statements is eliminated. The district reserves the right to award multiple contracts or conduct interviews with top-ranked offerors. Required submission documents include an offer and acceptance form, a notarized non-collusion affidavit, and a notarized familial relationship disclosure. Additionally, contractors must certify they do not engage in a boycott of Israel or utilize forced labor from the People's Republic of China. Invoices are subject to net 30-day payment terms and must be submitted to the District's Accounts Payable Department with a current W-9 on file.
Nogales Unified School District, #1

POSTED

about 21 hours ago

DEADLINE

in 21 days
NAICS: 561621
New
SLED
Fire Monitoring Services, Various Locations, CA
Solicitation # 40947
The California Military Department is soliciting bids for fire monitoring services across six facilities in Southern California. The contract spans a 36-month period, estimated to run from January 2027 through January 2030. The scope of work requires the contractor to provide continuous 24/7 fire alarm monitoring and notification, the installation and activation of cellular fire alarm communicators, and scheduled quarterly, semi-annual, and annual inspection and testing. Additionally, the contractor is responsible for the initial replacement of fire alarm system batteries and any separately authorized corrective repairs. All work must adhere to NFPA 72, NFPA 25, CCR Title 19, CCR Title 24, and applicable federal, state, and local codes. The contract will be awarded to the lowest responsive bid from a qualified and responsible bidder, with specific price preferences available for certified Small Businesses (5%) and Disabled Veteran Business Enterprises (5%), or a combined 10% preference for those holding both certifications. Bidders must possess a California C-10 Electrical Contractor License and all applicable BSIS Alarm-Company licenses. Required submission documents include a signed proposal, certification clauses, and a Civil Rights Laws Certification for contracts exceeding $100,000. All cellular communicators and active monitoring must be established at all six facilities within 30 calendar days of the Notice to Proceed.
California Military Department

POSTED

about 22 hours ago

DEADLINE

in 16 days
NAICS: 561621
New
SLED
Professional Fire Protection Service for COTA Facilities
Solicitation # 2026-RFP-074
The Central Ohio Transit Authority (COTA) is soliciting proposals for a three-year, Firm Fixed Price contract for professional fire protection services across its facilities. The scope of work includes comprehensive inspection, testing, preventive maintenance, monitoring, corrective repair, and 24/7 emergency services for a wide array of life-safety equipment, including fire alarms, sprinklers, suppression systems, fire pumps, hydrants, and extinguishers. The selected contractor must provide technicians with demonstrated experience in these specific systems and guarantee a specific emergency response time. Performance is measured by service quality, reliability, and responsiveness, with a requirement that all systems be returned to normal service at the end of each visit. Proposals will be evaluated based on Best Value, focusing on the qualifications and experience of key personnel and other technical factors such as incident response procedures and cybersecurity protections. Submissions must be uploaded in PDF format via COTA's online procurement portal by December 18, 2026, and must not exceed 20 pages, excluding the separate cost proposal and required notarized affidavits. Required documentation includes a W-9, a cybersecurity questionnaire, and various affidavits regarding taxes, non-collusion, and lobbying. Payment terms are Net 30, and all invoices must be submitted electronically to the designated accounts payable email with a unique five-digit purchase order number.
6300- Operations- Facilities

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 561621
New
SLED
Fire Alarms, Hood Systems and Sprinkler Systems Inspections, Repair Services, Parts and Supplies
Solicitation # 2600DW
Katy Independent School District is soliciting proposals under RFP 2600DW for the comprehensive inspection, repair, and maintenance of fire alarm, hood, and sprinkler systems across its various campuses and district buildings. The scope of work includes annual visual and functional testing of fire alarms, inspection of fire pumps and backflow preventers, service for kitchen and paint booth suppression systems, and the recharging and hydrostatic testing of portable fire extinguishers. All services must be performed in accordance with NFPA 10, NFPA 25, NFPA 72, and local jurisdictional codes. The contract features an initial two-year term starting January 29, 2027, with options for three annual renewals, potentially extending the agreement through January 28, 2032. Proposals are due by November 20, 2026, at 2:00 pm CST and must be submitted via the Katy ISD OpenGov System or as a sealed response. Award recommendations will be made by a committee using a points-based system that prioritizes purchase price, vendor reputation, quality of services, and the ability to meet the district's specific needs. Required submission documents include vendor certifications, a W-9, a confidentiality form, and a pre-employment affidavit. Selected vendors must maintain liability, worker's compensation, and employer's liability insurance, and they must adhere to strict device labeling standards and the district's purchase order policy to ensure payment.
Purchasing

POSTED

1 day ago

DEADLINE

in 3 days

AI Contract Overview

Show more

This contract involves comprehensive water well rehabilitation services for the Tamura Shallow, Dolphin Shallow, and Dolphin Deep wells in California, managed by the City of Newport Beach. The scope includes mobilization of equipment and personnel, traffic control, and obtaining necessary permits. The work entails disconnecting existing piping and electrical systems, removing old pumps and motors, and installing new pump assemblies with associated components to ensure fully operational well systems at specified flow rates and total dynamic head. The project also encompasses detailed well cleaning and rehabilitation procedures, including video surveys, biocleaning, air-jetting, chemical treatment, mechanical redevelopment, and various surveys such as electromagnetic, caliper, and gyroscopic assessments. At the shallow wells, additional work involves installing stainless steel liners and gravel packs, followed by further video inspections. Temporary test pumps will be used for pumping tests, including step-drawdown and constant rate tests, with subsequent inspections and sediment removal. The contract emphasizes environmental compliance, proper disposal of old equipment, and thorough documentation of each phase to ensure the wells' optimal performance and longevity.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Centennial Fire Alarm & CO Detection Upgrade and Maintenance ServicesOpen now, due in 15 days
  • RFP OP-32091-AS (Supply and Integration of RFID proximity Cards at PSO terminal Mehmoodkot)Open now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newport Beach
Contacts1 person available
OfficeN/A

Full Description

Show more
The work necessary for the completion of this contract consists of:1. Mobilization of equipment and personnel to each well site.2. Traffic Control – Implement the traffic control plan for Dolphin Well Site as shown on drawing T-6025-S in Appendix A. Obtain an encroachment permit from the City of Fountain Valley. The contractor is responsible for all permit costs.3. Disconnect the piping & electrical systems from each well and remove the motor, pump column and pump bowls from each well. Each well will receive a new pump and motor, therefore, the existing pump systems for each well site will be scrapped. City staff will handle all electrical disconnections from the existing permanent motor. The permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. Disposal of the old motors and pumps is the responsibility of the Contractor.4. Furnish new pump assembly and new pump motor as a mated pair for each well. Include new column pipe, couplings, line shaft, adaptors and other ancillary equipment and appurtenances for the well, resulting in a fully operable pumping system at the City’s design rate and TDH.5. Conduct an initial video survey of the entire well casing at each well site.6. Initiate biocleaning of each well casing by injecting Herc Chem Tech (HCT) WaterSOLV™ BC via a dual-swab tool throughout the perforated sections of each well casing to help remove encrusting material and/or biofilm from the casing walls. Conduct wire brushing (using a steel wire brushes at the Tamura and Dolphin Shallow wells, and a stiff nylon brush at the Dolphin Deep Well), and then bail sediment fill from the bottom of each casing.7. Perform “Air-Jetting” at each well to help open up the original gravel pack and perforations or screen, used for each original well.8. Conduct chemical treatment at each well using HCT solutions, as specified.9. Perform mechanical redevelopment via simultaneous swabbing and airlifting of the chemical solutions from each well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system at each well.10. Perform an interim video survey to help ensure the effectiveness of the chemical and mechanical rehabilitation operations.11. Conduct an Electro-Magnetic Thickness (EMT24) survey of the entire well casing at the Tamura and Dolphin Shallow Wells only.12. Perform a caliper survey to measure the current diameter of the casing(s) at the Tamura and Dolphin Shallow Wells only.13. Perform a gyroscopic casing survey at the Tamura and Dolphin Shallow Wells only.14. Install Type 304L Stainless Steel full casing liners and gravel packs, as specified at the Tamura and Dolphin Shallow Wells only.15. Conduct an interim video survey of the entire well casing at the Tamura and Dolphin Shallow Wells only to document the state of newly installed liners.16. Mobilize, install, operate, maintain, and then remove a temporary test pump and test motor capable of pumping up to 3,000 gpm at each well site.17. Conduct pumping redevelopment by pumping and surging at each well.18. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test at each well.19. Near the end of the constant rate pumping test, perform a dynamic spinner survey in each well.20. Remove the test pump and perform a final video survey at each well site to help check for possible damage from installation and/or removal of temporary test pump, and to determine the amount of sediment fill in the bottom of each casing; bail the accumulated sediment.21. Perform additional brushing and bailing at each well to further help remove any biological build up prior to the installation of the permanent pump.22. Mobilize, install, operate, maintain, and then remove a temporary test pump and motor at each well site.Please refer to the Special Provisions, section 2-6 for the full scope of work as not all of it can fit here.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS