Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Water Well Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vandenberg Village Community Services District is initiating the Water Well Replacement Project in Lompoc, California, to replace existing Wells 1B, 3A, and 3B. The project involves constructing three new potable water wells with an expected yield between 800 and 1,350 gallons per minute. Each well will include electrical service, metering, monitoring, and security infrastructure, with new lateral connections and replacement pipelines linking them to Well Site 1. Construction is scheduled to span approximately 30 months, running from July 2027 through December 2029, with temporary staging located near Exit 702/704 from SR-1. This forecast was posted on August 14, 2026, and is managed by General Manager Dr. Cynthia Allen and Project Manager Grace Bridges.

General Info

Vandenberg Village will replace three water wells in Lompoc from 2027 through 2029.

Agency

California → Vandenberg Village Community Services District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

SR-1/Burton Mesa Boulevard, Lompoc, CA, 93436

Set-Aside

NONE

Documents

(5)

VVCSD_ISMND_Appendices_Combined_Aug2026_flat_OCR

PDF

VVCSD_ISMND_Aug2026_flat_OCR

PDF

VVCSD_WaterWell_NOC_081326_Signed_flat_OCR

PDF

VVCSD_WaterWell_SCH_SummaryForm_081426_flat_OCR

PDF

VVCSD_NOI_Signed_081426_flat_OCR

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Vandenberg Village Community Services District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Vandenberg Village Community Services District
Office AddressN/A
Contacts
Dr. Cynthia AllenGeneral Manager
Grace BridgesProject Manager

Interested Companies (1)

Show more
Meridian (A Trinity Company)
Ventura, CA

Full Description

Show more
VVCSD proposes to construct three (3) new replacement potable water wells, with a maximum expected yield of approximately 800 to 1,350 gallons per minute (gpm), to replace existing Wells 1B, 3A, and 3B, as they reach the end of their functional lifespan. Each new well would be equipped with electrical service, metering, monitoring, and security infrastructure, and would be connected to the District's existing water distribution system through new lateral connections and replacement pipelines extending to the District's existing Well Site 1. Temporary construction staging would occur in the vicinity of Exit 702/704 from SR-1. Construction is anticipated to take approximately 30 months, from July 2027 through December 2029.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details