This Government Contract opportunity from Department Of Defense was posted on September 4, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Watertight Doors and Engine Room Hatch for the Tug Mike Donlon

Awarded
W912P4-12-T-0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCGC CROCODILE DD2 FY27 #1 MDE W5
Solicitation # 70Z08027PBPLCROCODILE
The Department of Homeland Security, through the U.S. Coast Guard Surface Forces Logistics Center, has issued a Sources Sought Notice under solicitation number 70Z08027PBPLCROCODILE to conduct market research for drydock and dockside repairs to the USCGC CROCODILE (WPB-87369). This notice is intended to identify capable sources, determine the availability of suitable commercial items, and understand current commercial practices to inform future competition and set-aside decisions. The anticipated scope of work includes 34 specific items, such as Main Diesel Engine W-5 maintenance, propulsion shaft and rudder assembly renewal, 100 percent underwater body and hull plating preservation, tank cleaning, and the provision of drydocking and sea trial support. The anticipated period of performance is 63 calendar days, scheduled from April 20, 2027, to June 22, 2027. All work is to be performed at the contractor's facility with no geographical restrictions. Interested firms under NAICS code 336611, which has a size standard of 1,300 employees, must submit capability statements, business size certifications, and past performance information by October 21, 2026. This notice does not constitute a formal solicitation or an obligation for the government to take further action, and potential offerors are advised to monitor Sam.gov for any future solicitations.
CG-SEA-C21

POSTED

about 16 hours ago

DEADLINE

in about 11 hours

AI Contract Overview

Show more

This contract involves the replacement of watertight doors in the pilot house and the replacement of watertight doors and hatches in the engine room for the Tug Mike Donlon. All work must comply with American Bureau of Shipping rules for Great Lakes service, including the provision of ABS-certified drawings prior to commencement and ABS certification of watertightness testing upon completion. The contractor is responsible for all necessary modifications to the vessel enclosures and must ensure all painted surfaces match the existing vessel specifications. Strict safety compliance is required, mandating the submission of an Accident Prevention Plan, Activity Hazard Analyses, and proof of qualifications for a Site Safety and Health Officer within 14 calendar days of award. Work cannot begin until the safety plan is accepted by the USACE Buffalo District. The project must be completed within six weeks of the contract award date. Award is based on the lowest priced technically acceptable proposal, evaluated on watertightness, operational compatibility, and a 50-year expected durability.

General Info

Contract Value

$76,812

NAICS

336611 - Ship Building and Repairing

Place of Performance

Contractor Facility - Vessel will be delivered to contractor., NY, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from Jul 31, 2012 to Aug 2, 2012.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Buffalo
Contacts2 people available
OfficeBUFFALO, NY, 14202-0000, USA
Office AddressBUFFALO, NY, 14202-0000, USA
Contacts
Brooke HundleyContract Specialist
Jeffrey G. ErnestSupervisory Contract Specialist

Full Description

Show more
SCOPE OF WORK ITEM 1 SAFETY PLANS AND SUBMITTALS SAFETY REQUIREMENTS: The contractor shall follow all Safety Requirements detailed in the Unified Facilities Guide Specifications (USACE UFGS 01-35-26, February 2012), attached, and applicable Safety & Health Requirements Manual per EM 385-1-1. EM385-1-1 is available on-line at: http://140.194.76.129/publications/eng-manuals/EM_385-1-1_languages/EM_385-1-1_English_2008/toc.html SAFETY SUBMITTALS: Abbreviated Accident Prevention Plan (APP) Completed Abbreviated APP Checklist (blank attached) Activity Hazard Analyses (AHA, blank form attached) Proof of qualifications for Competent Persons/Site Safety and Health Officer(s) (SSHO) to include o A resume detailing work on similar projects. o Copy of the certificate for 10-hour OSHA construction safety course. o Competent person training as needed.? All safety submittals shall be provided to the government within 14 calendar days after contract award. SUBMIT REPORTS AS REQUIRED: Accident Reports via Eng Form 3394 Accident Investigation Report (blank attached) Monthly Man-Hour Exposure Reports by the 5th day of each month (blank attached) Work shall not begin until the APP has been submitted to, and accepted by, the USACE Buffalo District Contracting Officer or COR. In the APP, the Contractor shall avoid providing material of a general nature not specifically related to this project or site. Previous versions of existing off-the-shelf APP are not acceptable. The APP shall be prepared following the format found in USACE publication U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual EM 385-1-1, Appendix A. The following documents shall be considered in the preparation of the APP: USACE EM 385-1-1 (15 Sep 2008) Safety and Health Requirements Manual; UFGS-01 35 26 (February 2012) Governmental Safety Requirements; USDOL OSHA 29 CFR 1926 Safety and Health Regulations for Construction; USDOL OSHA 29 CFR 1910 General Industry Safety and Health Standards. Portions of the submittals that are disapproved shall be promptly corrected and re-submitted. If additional work items are added to the contract work the APP and AHA shall be amended as necessary and approved prior to the start of the additional work items. A SSHO shall be present on-site whenever project-related construction work is being executed. The contractor shall permit safety inspections of all work being performed. Payment for this item will be in one lump sum. ITEM 2 WATERTIGHT DOORS FOR PILOT HOUSE: Replace the two doors of the pilot house with new watertight doors. Make such modifications to the pilothouse as are required for compatibility with the new doors. The new doors shall be provided with locks, keyed alike, and two sets of keys shall be provided for the locks. All work shall be suitable for vessels in Great Lakes service, and in compliance with ABS Rules for Building and Classing Steel Vessels. All new construction and any modified areas of the pilothouse or other areas of the vessel where paint is disturbed as consequence of the work shall be prepared and painted to match the existing vessel in accordance with the PAINT SCHEDULE, GENERAL NOTES, and COLOR CHART shown on Drawing 533-D406-01 of the Record Drawings provided as an attachment to this Contract. With the bid, provide such schematic drawings, sketches, and product literature as required to adequately describe the nature of the work for bid evaluation purposes (technical acceptability). After award, and prior to starting work, provide detailed drawings of the proposed work, certified and approved by the American Bureau of Shipping (ABS). After installation, perform such testing of the watertightness of the doors as is required by ABS standards, and provide certification from ABS of successful testing. Payment for this item will be in one lump sum. ITEM 3 WATERTIGHT ENGINE ROOM DOORS AND HATCH: Replace the engine room doors and hatch with new watertight doors and hatch or equivalent entry system. Make such modifications to the engine room enclosure as are required for compatibility with the new doors and hatch. The new doors and hatch shall be securely lockable, and two sets of keys shall be provided for any new locks. All work shall be suitable for vessels in Great Lakes service, and in compliance with ABS Rules for Building and Classing Steel Vessels. All new construction and any modified areas of the engine room enclosure or other areas of the vessel where paint is disturbed as consequence of the work shall be prepared and painted to match the existing vessel in accordance with the PAINT SCHEDULE, GENERAL NOTES, and COLOR CHART shown on Drawing 533-D406-01 of the Record Drawings provided as an attachment to this Contract. With the bid, provide schematic drawings, sketches, and product literature as required to adequately describe the nature of the proposed work for bid evaluation purposes (technical acceptability). After award, and prior to starting work, provide detailed drawings of the proposed work, certified and approved by the American Bureau of Shipping (ABS). After installation, perform such testing of the watertightness of the doors as is required by ABS standards, and provide certification from ABS of successful testing. Payment for this item will be in one lump sum. ITEM 4 SCHEDULE: All work shall be complete no later than 6 weeks after the date of Contract Award. PLEASE SEE THE ATTACHED SCOPE OF WORK FOR MORE DETAILED INFORMATION, INCLUDING BID SHEET, BID SUBMITTAL REQUIREMENTS, SUBMITTALS, AND TECHNICAL PROVISIONS. BID EVALUATION: This Contract will be awarded to the lowest priced technically acceptable proposal. Technical acceptability will be based on the Government's evaluation of the schematic drawings, sketches, and product literature provided with the bid." The Government will determine technical acceptability based on whether the work shown will be a. Watertight b. Compatible with normal vessel operations (requiring minimal or no modifications to the existing vessel, preventing implementation of designs that create time consuming and/or difficult to use doors) b. Durable (50 year expected life with the exception of replaceable gaskets or seals) All three criteria must be met! Note: Wage Determination for vessel included in solicitation, but upon award, contract will include wage determination with job categories for the location of the winning contractor, as this work will be done at the contractor's facility.

More opportunities from Department Of Defense → W072 Endist Buffalo

Same awarding agency

NAICS: 238210
Federal
Black Rock Lock High Mast Lighting Project
Solicitation # W912P426QA015
Solicitation W912P426QA015, issued by the Department of Defense W072 Endist Buffalo, seeks a contractor for the Black Rock Lock High Mast Lighting Project in Buffalo, NY. The project involves the inspection and replacement of outdated first-generation LED fixtures and internal mechanisms on seven 100-foot high mast lighting poles to ensure safe navigation for boat traffic. The estimated contract value ranges between $1,000,000 and $5,000,000, with a performance period of 180 calendar days following the notice to proceed. Base requirements include mobilization, the replacement of five lowering devices, and the replacement of 48 light fixtures, with an additional option to replace a high mast light pole. Award will be granted to the responsible offeror with the lowest evaluated price among those meeting acceptability requirements. Evaluation factors emphasize experience with similar scope and size projects, specifically those involving 100-foot poles and electrical distribution systems with a minimum contract value of $400,000, as well as the availability of necessary equipment and staffing. The solicitation includes a 10% HUBZone price evaluation preference and requires compliance with the Davis-Bacon Act, Buy American standards, and EM 385-1 safety regulations. Proposals must be submitted electronically via the PIEE portal by October 22, 2026, and must include a signed Standard Form 1442 and a completed Offer Sheet.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

29 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS