Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on August 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Weatherization Project at Fort Thomas High School

Closed
25-20-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 16 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves a comprehensive weatherization project at Fort Thomas High School, operated by the Fort Thomas Unified School District #7 in Graham County, Arizona. The project encompasses extensive work on six buildings dating from 1925 to 2003, focusing on enhancing energy efficiency and building integrity through various repair and sealing activities. Key tasks include general site preparation, sub-grade damp proofing, verification and repair of underground connections, masonry removal and replacement, masonry repairs, soffit and stucco work, window sealing, and other detailed interventions outlined in the project manual and drawings. Asbestos Containing Materials testing has been completed, with reports included in the project documentation, ensuring safety and compliance during the work. Funding for this project is provided by the Division of School Facilities along with federal funds, which necessitate adherence to Davis-Bacon Act wage requirements and other federal compliance standards. The solicitation, titled "Weatherization Project at Fort Thomas High School," was posted on August 7, 2024, with a response deadline of August 28, 2024. The project is estimated to be valued between $500,000 and $1,500,000, and the NAICS code associated with the work is 238160, indicating specialty trade contractors in siding, roofing, and other exterior building finishing. The primary point of contact is Mark Kinsey, reachable via email at [email hidden] or by phone at [phone hidden]. The contract aims to improve the building envelope, energy efficiency, and safety of the school facilities, ensuring they meet current standards and are better suited for ongoing educational use.

General Info

Agency

Arizona → Fort Thomas Unified School District, #7

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

10

Fort Thomas HS Weatherization Drawings

PDF, High priority: read this firstspecifications
High

Fort Thomas HS Weatherization Project Manual and Specifications SFB# BRG- DSGN- 3629

PDF, High priority: read this firstspecifications
High

IFB 25-20-26 Weatherization Project at Fort Thomas High School

PDF, High priority: read this firstifb
High

Offer and Acceptance Document

PDF, High priority: read this first1 page · contract-document
High

Davis Bacon Certified Payroll Statement

PDF, Low prioritycertified-payroll
Low

Familial Relationship Disclosure Statement

PDF, Low priority1 page · other
Low

Fort Thomas High School Structural Evaluation Report BE#24111 05-29-24

PDF, Low prioritystructural-evaluation-report
Low

Non-Collusion Statement Attachment

PDF, Low priority1 page · other
Low

References Attachment for Construction Project

PDF, Low priorityreferences
Low

Subcontractors List for Project Work

PDF, Low priority1 page · subcontractors-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Fort Thomas Unified School District, #7
Contacts1 person available
OfficeN/A
Organization / Agency
Arizona → Fort Thomas Unified School District, #7
Office AddressN/A

Full Description

Show more
Fort Thomas Unified School District, #7 is in Graham County serving our K-12 Community. This project is for extensive Weatherization of six (6) buildings at Fort Thomas High School as shown in drawings. The buildings range in age from 1925 to 2003. The type of work as detailed will include the following: 1) general preparation, 2) sub-grade damp proofing, 3) verify underground connections, 4) masonry removal/replacement, 5) masonry repair, 6) soffit work, 7) stucco work, 8) sealing of windows, and 9) other work as detailed in Project Manual and Drawings.  Asbestos Containing Materials (ACM) testing has been done and the report is included Project Manual. This Project will be funded by the Division of School Facilities, and also Federal funds that will require Davis-Bacon Act and other compliance. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS