Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on February 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WeGo Central Canopy Replacement, Waterproofing and Safety Improvements

Closed
2025221State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive renovation and safety improvement work at WeGo's Central Facility, the Elizabeth Duff Transit Center in downtown Nashville, which serves as a major hub for Davidson County Public Bus Service lines. The project scope includes removal and replacement of two outdated canopies with three modern bus shelter canopies equipped with security cameras and electronic signs (installed by others), drive aisle waterproofing maintenance, and safety upgrades aimed at reducing bus strikes. These safety enhancements encompass installation of bollards to delineate bus entrance paths, removal of certain concrete areas, and improvements to traffic control signage and striping. The work is to be conducted in a busy, active bus facility, requiring close coordination with WeGo Operations to maintain bus operations while minimizing downtime, adhere to stringent safety protocols for buses, pedestrians, and workers, and control all traffic within the facility at no additional cost. The contract mandates that the contractor must have prior experience in structural steel fabrication, demolition, and concrete hardscape work in an active facility environment, and provide three relevant project references meeting these criteria. Construction must begin within 60 calendar days following the Notice to Proceed, with substantial completion targeted within 102 workdays, followed by final completion within 10 additional days. Liquidated damages of $5,421 per day apply for delays beyond the substantial completion deadline. The contractor is responsible for daily site cleanliness, debris removal, and is prohibited from using WeGo trash facilities. Compliance with numerous federal and state regulations is required, including the Americans with Disabilities Act, equal employment opportunity laws, and Disadvantaged Business Enterprise participation goals. Special contract conditions prohibit personal vehicle parking on-site, restrict construction vehicle parking to designated areas, and impose record retention, nondiscrimination, and security equipment sourcing requirements consistent with federal transit administration standards. The contractor must also manage all necessary traffic control and safety measures to ensure ongoing bus and pedestrian safety throughout the project's duration.

General Info

Renovation of Nashville transit center including canopy replacement, safety upgrades, traffic control, strict compliance, and timely completion.

Documents

12
DOCX, Low priorityclauses-checklist
Low
DOCX, Low priority3 pages · contract-document
Low
PDF
PDF
PDF
PDF
PDF
XLSX
DOCX
DOCX
PDF
XLSX

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Multiple Award Construction SubcontractOpen now
  • CSC-OR Construction IDIQ 2023Open now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → Engineering
Contacts2 people available
OfficeNashville, TN, 37155, USA

Full Description

Show more
WeGo's Central Facility in downtown Nashville is the structure where most of the Davidson County Public Bus Service lines originate for outbound and terminate for inbound bus service. This Central Facility named after the first female bus driver in Nashville, is the Elizabeth Duff Transit Center at 400 Dr. M.L.K. Blvd (Charlotte Ave.), Nashville, TN 37219. Part of the facility is on an outdoor elevated deck exposed to the elements. At this location, two outdated existing canopies are located to protect riders from the elements while waiting to board buses. This Central Canopies Project is to remove the existing outdated canopies and replace them with three updated bus shelter canopies including security cameras (by others) and electronic signs (by others). The waterproofing project is for maintenance of the drive aisles throughout the WeGo Central Facility. The challenge will be close coordination with Operations to make Transit Bays available for waterproofing while maintaining Bus Operations and minimizing down time of the Facility. The Safety improvements project is to address operational challenges consisting of Bus Strikes at various locations within the facility. The mitigation measures being constructed here includes bollards to better define bus entrance path to the building, removal of concrete at the horseshoe, and traffic control improvements to include striping and signage. The following instructions to bidders shall also apply: Parking for personal vehicles on the site is not allowed. Limited space for construction vehicles will be limited to the work area designated for construction. This is an active Bus Facility. Bidders are advised that Bus ingress and egress as well as pedestrians will be immediately adjacent to the work area. The successful Contractor shall maintain a safe environment relative to the Scope of Work for Buses, pedestrians, and workers at all times. Safety measures may include barricades, traffic control, pedestrian control, signage and other measures as appropriate at no additional cost. The contractor should be responsible for all traffic control in regard to the project. The Contractor shall coordinate with WeGo Operations staff to ensure safe and efficient operations during construction. Any impacts to the drive lane of more than 60 seconds shall be coordinated to occur between bus movements or outside of bus operating hours. Contractor will be responsible for providing any traffic control necessary to direct buses within the facility. Contractor shall coordinate closely with WeGo Construction Management, Facility and Bus Operations. Coordination may include meetings, weekly schedules, daily check-in's, etc. Number of personnel, equipment, trucking and material deliveries shall be communicated in advance to WeGO Construction Management, Facility and Bus Operations and maintained as conditions change. Contractor shall list and describe three projects including cost that Contractor has performed in the last five years similar to the subject Scope of Work. These projects must include on site structural steel fabrication, demolition, concrete hardscape. At least one project shall include working in an active facility during construction. Failure to provide a list of adequate projects shall deem the Bidder Non-Responsive. Contractor shall not begin work at the job site until all long lead time items are procured and ready for delivery. Once work at the site begins, the Contractor shall adequately staff the project and working continuously until completion. Contractor shall have and confirm prior to award sufficient personnel capacity - Billing, Project Management, Site Management, etc. Upon mobilization, Contractor's time for Substantial Completion of the project is 102 work days . Final completion shall be within 10 working days of Substantial Completion. Work at the site shall not begin later than 60 calendar days from Notice to Proceed. Liquidated Damages of $5,421 per day shall apply to any delay to Substantial Completion beyond the 102 work days set forth. Contractor shall maintain the site in an orderly and clean manner at all times. Construction debris shall be removed from the site on at minimum of a daily basis. Contractor furnished trash receptacles, bins, etc. shall be provided and utilized. Contractor is prohibited from using WeGo trash facilities. The Contractor is solely responsible for Life Safety Practices concerning the scope of work, and Contractor's employees, subcontractors, delivery drivers, and vendors.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS