Well 115 Maintenance & Rehabilitation

Active
26-105State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 26-105 is an Invitation For Bid issued by the City of Aurora, Illinois, for the maintenance and rehabilitation of Well 115. The project focuses on aquifer formation redevelopment and the right-sizing of production to eliminate the need for discharge line throttling. The scope of work includes the inspection, repair, and replacement of critical equipment such as the pump, motor, column piping, and power cables, as well as well-screen cleaning and a three-hour pumping test. Bidders must provide pricing for various components, including potential alternatives for motor assemblies and the rehabilitation of existing pumping assemblies, and must include a 5,000 dollar cash allowance for items ordered by the Engineer. The contract is administered by Engineering Enterprises, Inc., and requires strict adherence to ASTM standards and specific packaging and marking guidelines for all equipment. Award evaluation is based on responsiveness and responsibility, considering factors such as bidder qualifications, quality assurance, and the ability to meet the project schedule. Key compliance requirements include the provision of performance and payment bonds, adherence to state and local prevailing wage laws, and participation in Department of Labor-approved apprenticeship programs for prime vendors on contracts exceeding 25,000 dollars. All bids must be submitted electronically via OpenGov Procurement by November 18, 2026.

General Info

City of Aurora bid for maintenance and rehabilitation of Well 115.

Documents

2

IFB #26-105: Well 115 Maintenance & Rehabilitation

PDF, High priority: read this firstifb
High

Water Well No. 115 Rehabilitation Project Manual (Bid No. 26-105)

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Water Production
Contacts2 people available
OfficeAurora, IL, 60502, USA
Organization / AgencyIllinois → Water Production
Office AddressAurora, IL, 60502, USA
Contacts
Robert LeibleSuperintendent of Water Production
Purchasing DivisionPurchasing Department

Interested Companies (5)

jhgfytretretr
ePlanColumbia, MO
Overton Construction

See All 5 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The existing Well 115 was originally constructed in 1988 and was completed in drift formations and is gravel packed. The well consists of 12-inch casing (pitless adapter), 20-inch casing extending from +1.5' to 90 feet below ground surface and is screened from 90 feet to a total depth of 135 feet. The primary purpose and intent of this project is formation redevelopment, combined with inspection and repair/replacement of all related well equipment as needed, including cables, pump, motor, and column piping. Over-pumping of the formation with the existing pump has been a long-standing operational issue and is currently mitigated through throttling of the discharge line valve. "Right-sizing" of the well's production to maintain a safe pumping level via pump redesign and aquifer formation redevelopment accompanied by well-screen cleaning is intended to achieve sustainable pumping without throttling the discharge flow.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS