This Government Contract opportunity from California was posted on May 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
WELL 15 DRILLING PROJECT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Santa Maria Public Works Engineering Department is soliciting bids for the Well 15 Drilling Project, which involves the construction of a new municipal water supply well. The project scope includes drilling a well approximately 1,600 feet deep with an anticipated design capacity of 2,300 gallons per minute. The technical requirements specify the installation of 460 feet of 22-inch diameter blank upper casing and 1,120 feet of 16-inch perforated casing with alternating blank segments. The well will be located in farm fields roughly 1,800 feet southeast of Well 14. Comprehensive work requirements include drilling a pilot hole, geophysical logging, reaming boreholes, constructing casings, screens, and filter packs, and placing grout seals. The contractor is also responsible for well development and various tests, including water quality, well capacity, zone isolation, and borehole alignment. Please note that well equipping will be handled under a separate construction contract. Interested parties must provide a 10 percent bid bond, with responses due by June 23, 2025.
General Info
Place of Performance
110 S. Pine St. Suite 221 Santa Maria, California 93458, CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
- Lift Station No. 85 ReplacementOpen now, due in 28 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work includes drilling a pilot hole up the anticipated depths, geophysical logging, reaming the upper and lower pilot borehole to the planned diameters, geophysical and borehole logging, constructing casings and screens, constructing filter pack, placing grout seals, well development, various testing, such as zone isolation, well capacity, water quality, borehole plumbness and alignment, sand and other, and all other work as identified in the Plans and Specifications. The well equipping efforts are to be complete as a separate construction contract.
Bid Bond: 10.00%
More opportunities from California → Public Works Engineering Department of City of Santa Maria
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
