Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WELL 15 EQUIPPING PROJECT

Closed
2025-04State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Well 15 Equipping Project, solicitation number 2025-04, is a construction contract issued by the Public Works Engineering Department of the City of Santa Maria, California. The scope of work involves the comprehensive construction and equipping of Santa Maria Water Supply Well No. 15. Key deliverables include site improvements such as grading, drainage, and the installation of ductile iron piping ranging from 10 to 14 inches in diameter. The project requires the installation of a vertical turbine pump and motor, a chlorination fiberglass shelter with sodium hypochlorite feed systems, a prefabricated metal electrical and generator building, and a SCADA PLC system for process control and instrumentation. Additional requirements include the construction of foundations, a well pad, a sand separator, a surge tank, and the installation of chain link fencing and gates. The solicitation was posted on July 22, 2025, with a response deadline of October 29, 2025. Bidders are required to provide a bid bond of 10.00%. Technical execution must adhere to strict industry standards, including ACI 301 for structural concrete and various ASTM specifications. All materials must be delivered F.O.B. Destination and stored according to manufacturer instructions to prevent environmental damage. The evaluation process is based on a 100-point scale, with the highest weight placed on the cost proposal at 30 points, followed by firm qualifications, training programs, and references. Final acceptance of the work is conducted at the project site by the Owner or Engineer upon verification that all specifications and quality standards have been met.

General Info

Place of Performance

110 S. Pine St. Suite 221 Santa Maria, California 93458, CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Engineering Department of City of Santa Maria
Contacts1 person available
OfficeCA, USA

Interested Companies (25)

AffinisOverland Park, KS
Allgeier, Martin and AssociatesJoplin, MO
Burns & McDonnell EngineeringKansas City, MO

See All 25 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Scope: In general, the work consists of, but is not limited to, furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct and equip Santa Maria Water Supply Well No. 15. Work shall consist of importing borrow, performing grading, drainage and site improvements, trenching for pipe and conduit, trench dewatering when applicable, installing above ground and below ground 10-inch, 12-inch and 14-inch diameter ductile iron pipes, installing gate valves, blow-off and combination air valve assemblies, hydrostatic pressure testing, flushing and disinfection of installed piping, installing electrical and communication conduit and associated access vaults, constructing building and equipment foundations, well pedestal and well pad, installing vertical turbine pump and motor, column pipe and shaft, above ground piping, valves, sand separator, surge tank, fire hydrant, associated piping and components, installing chlorination fiberglass shelter building, sodium hypochlorite feed pump assembly, chemical storage tanks, chemical injection and monitoring instrumentation, associated piping, electrical and controls, constructing eye/face wash station associated piping, drainage and controls, constructing prefabricated metal electrical and generator building, constructing interior wall, installing doors and hardware, installing electrical utility service connection, main switchboard, distribution panels, transformer, soft starter, emergency generator, supply louvers and exhaust hood, automatic transfer switch, SCADA PLC system, equipment instrumentation, HVAC, miscellaneous electrical apparatuses, building and exterior well site electrical, lighting and intrusion monitoring, installing removable pump enclosure, HVAC and associated well pump and motor electrical and communication systems, installing process control and instrumentation systems, flow, level and pressure measurement equipment, transmitters and switches, assisting the City’s preferred SCADA integrator with panel installation and testing, installing chain link fencing and gates and performing associated site works and all other work identified in the Contract Documents.
Bid Bond: 10.00%

More opportunities from California → Public Works Engineering Department of City of Santa Maria

Same awarding agency

NAICS: 237310
SLED
TAYLOR STREET CONCRETE IMPROVEMENTS 2026 PROJECT
Solicitation # 2026-10
The Taylor Street Concrete Improvements 2026 project, solicitation number 2026-10, is a public works contract issued by the City of Santa Maria, California. The scope of work involves the removal and replacement of concrete curb ramps, cross gutters, and sidewalks, as well as spandrel concrete, minor striping using thermoplastic, and the adjustment of water valves and electrical boxes. The project must be completed within 65 working days from the issuance of the Notice to Proceed. The engineer's estimate for the project is 1,085,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on the grand total of eleven specific bid items. Bids are due by 2:00 PM PT on November 18, 2026, and must be submitted electronically via the PlanetBids portal. Required submission documents include a bid proposal, a list of subcontractors, experience data, a construction equipment list, a non-collusion affidavit, and a bidder's bond equal to 10 percent of the total bid. The successful contractor must provide performance and payment bonds each equal to 100 percent of the contract price, along with a guarantee and defective material bond. All work must comply with the 2025 Caltrans Standard Specifications and Standard Plans, as well as City of Santa Maria standards, with a specific requirement that ADA facilities meet Standard Plan A88A. Progress payments will be processed monthly, with the city withholding up to 5 percent until the work is complete.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS