Well 4 TCP and Nitrate Mitigation Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Well 4 TCP and Nitrate Mitigation Project, managed by the Mettler County Water District in California, is designed to bring the water system into compliance with State Water Resources Control Board Division of Drinking Water orders by mitigating TCP and nitrate contamination. The scope includes the installation of a granular activated carbon system with two vessels in series for TCP treatment and a blending system to mix Well 4 and Well 3 water to reduce nitrate levels. Infrastructure requirements involve an 18,000 square foot project site featuring GAC vessels on concrete foundations, a backwash supply tank, an upsized booster pump, a reclaim pump, and a 20-foot pipeline corridor, all secured by a chain link fence. A recent amendment to the project involves replacing failing water meters with new spacer tubes to maintain active service lines and installing new meter boxes and meters within the County right-of-way for improved access. This modification does not require additional equipment beyond the original project specifications and does not involve new service line installations. The project has been certified under CEQA as having no significant environmental effect, with construction anticipated to be completed within a twelve-month timeframe. The contractor must adhere to all Cal/OSHA regulations regarding equipment maintenance, spill prevention, and remediation to minimize the risk of pollutant release.

General Info

Replace water meters and boxes at Well 4 to reduce TCP and nitrate contamination without altering pipelines.

Agency

California → Mettler County Water District

Place of Performance

Mettler Frontage Road, CA, 93206

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Mettler County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mettler County Water District
Office AddressN/A
Contacts

Full Description

Show more
The Project would amend the original MND by replacing the old. failing water meters with new water meter spacer tubes to keep the existing water service lines active. New meter boxes and meters would be installed in County ROW for easier access. The old meter boxes would not be removed. No additional changes or equipment would be needed with the Project as the original equipment required in the MND would be adequate to meet the needs of the Project. No new service line installations or modi?cations to existing piping are anticipated. The Project would continue to be designated for the mitigation of TCP and nitrate contamination in the MCWD drinking water supplies and bring the water system into compliance with both standards.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS