Well 4 TCP and Nitrate Mitigation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Well 4 TCP and Nitrate Mitigation Project, managed by the Mettler County Water District in California, is designed to bring the water system into compliance with State Water Resources Control Board Division of Drinking Water orders by mitigating TCP and nitrate contamination. The scope includes the installation of a granular activated carbon system with two vessels in series for TCP treatment and a blending system to mix Well 4 and Well 3 water to reduce nitrate levels. Infrastructure requirements involve an 18,000 square foot project site featuring GAC vessels on concrete foundations, a backwash supply tank, an upsized booster pump, a reclaim pump, and a 20-foot pipeline corridor, all secured by a chain link fence. A recent amendment to the project involves replacing failing water meters with new spacer tubes to maintain active service lines and installing new meter boxes and meters within the County right-of-way for improved access. This modification does not require additional equipment beyond the original project specifications and does not involve new service line installations. The project has been certified under CEQA as having no significant environmental effect, with construction anticipated to be completed within a twelve-month timeframe. The contractor must adhere to all Cal/OSHA regulations regarding equipment maintenance, spill prevention, and remediation to minimize the risk of pollutant release.

General Info

Replace water meters and boxes at Well 4 to reduce TCP and nitrate contamination without altering pipelines.

Agency

California → Mettler County Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Mettler Frontage Road, CA, 93206

Set-Aside

NONE

Documents

(2)

MCWD Metter Replacement Notice of Determination

PDFnotice-of-determination

Addendum No. 2 to Mettler County Water District Well 4 TCP and Nitrate Mitigation Project MND

PDFaddendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mettler County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mettler County Water District
Office AddressN/A
Contacts

Full Description

Show more
The Project would amend the original MND by replacing the old. failing water meters with new water meter spacer tubes to keep the existing water service lines active. New meter boxes and meters would be installed in County ROW for easier access. The old meter boxes would not be removed. No additional changes or equipment would be needed with the Project as the original equipment required in the MND would be adequate to meet the needs of the Project. No new service line installations or modi?cations to existing piping are anticipated. The Project would continue to be designated for the mitigation of TCP and nitrate contamination in the MCWD drinking water supplies and bring the water system into compliance with both standards.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS