Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Well 5 PRS Relocation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Well 5 PRS Relocation project, managed by the Santa Margarita Water District, involves the replacement and relocation of an existing below-grade pressure reducing vault and its associated piping and valves in San Juan Capistrano, California. The scope of work includes disconnecting and removing interior piping and valves to abandon the existing underground vault in place, followed by the installation of a new above-ground pressure reducing station. This new assembly will be situated on a concrete pad or crushed-rock improved surface within the existing District easement and will be enclosed by a new perimeter security fence. The project also requires limited excavation and minor removal of non-native vegetation for tie-ins to the existing District water main. The primary objective of this project is to replace aging, deteriorated water distribution infrastructure to improve long-term reliability and eliminate confined-space entry hazards for maintenance personnel. The new configuration is designed to maintain the current operational function and capacity of the station while enhancing safety and accessibility for inspections and repairs. This project benefits the District's water customers by reducing the risk of outages and pressure disruptions. The project is classified under NAICS code 237110 and has been filed as a Notice of Exemption under CEQA categorical exemptions for the replacement of existing facilities.

General Info

Santa Margarita Water District relocating and replacing Well 5 pressure reducing station infrastructure.

Agency

California → Santa Margarita Water District

Place of Performance

27802 Calle Arroyo, San Juan Capistrano, CA, 92675

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Relocation and replacement of an existing below grade pressure reducing vault and its associated piping and valves within an existing District easement. The project consists of the relocation and replacement of an existing below-grade pressure reducing vault and its associated piping and valves within an existing District easement. The existing underground vault will be abandoned in place after all existing interior piping and valves have been disconnected and removed. A new above-ground pressure reducing station, consisting of new piping, valves, and appurtenances, will be installed on a new concrete pad or crushed-rock improved surface at a nearby location within the same District easement. A new perimeter security fence will be installed around the above-ground assembly. Tie-ins to the existing District water main will require limited excavation and minor removal of small, non-native ruderal vegetation at the connection points, all of which will occur entirely within the existing District easement. The project area is generally cleared of vegetation and is located approximately 200 feet from a normally low-flow creek; no work will occur within the creek, its bed, bank, or channel, and no work will occur within any riparian canopy. The project does not increase the capacity or change the operational function of the pressure reducing station; it replaces aging infrastructure with new equivalent infrastructure in a configuration that is safer and more accessible for maintenance personnel. The purpose of the project is to replace aging, deteriorated water distribution infrastructure and to relocate the pressure reducing facility from a below-grade confined space vault to an above-ground configuration. The above ground configuration eliminates confined-space entry hazards for maintenance personnel, improves operational access for inspection and repair, reduces the risk of in service failure of aged piping and valves, and improves long-term reliability of the District's water distribution system in this service area. The beneficiaries include the District's water customers served by this segment of the distribution system, who will continue to receive reliable water service with reduced risk of outages and pressure disruptions; District operations and maintenance personnel, who will benefit from safer above-ground -access that eliminates confined-space entry; and the general public.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS