Well 5 PRS Relocation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the relocation and replacement of an aging below-grade pressure reducing vault and its associated piping and valves within an existing District easement in San Juan Capistrano, California. The existing underground structure will be decommissioned in place after all interior components are removed, and a new above-ground pressure reducing station will be installed on a concrete or crushed-rock surface nearby, also within the same easement. This new facility will include modern piping, valves, and appurtenances, enclosed by a perimeter security fence, eliminating the hazards associated with confined-space entry while improving access for routine inspections and maintenance. Minor excavation will be required for tie-ins to the existing water main, accompanied by the removal of small, non-native vegetation at connection points, all confined to the established easement and avoiding any impact on the adjacent creek or riparian areas. The project does not alter the operational capacity or function of the pressure reduction system but replaces outdated infrastructure with equivalent, modern components to enhance reliability and safety. By moving from a subterranean vault to an above-ground configuration, the District significantly reduces the risk of service disruptions caused by aging equipment, improves long-term system resilience, and creates a safer work environment for maintenance personnel. The beneficiaries include the District’s water customers who will experience more consistent pressure and fewer outages, operations staff who gain safer, more efficient access to critical components, and the broader public who benefit from a more dependable water supply. The work will be carried out in a cleared area approximately 200 feet from a low-flow creek, with no disturbance to aquatic habitats, and is managed under the oversight of the Santa Margarita Water District with Tricia Butler, Chief Engineer, serving as the point of contact.
General Info
Agency
NAICS
Place of Performance
27802 Calle Arroyo, San Juan Capistrano, CA, 92675Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
