Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on February 13, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Well Decommissioning

Closed
W9128F-18-Q-0030Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
300 Burr St - Demolition of Commercial Building and Parking Lots
Solicitation # 2026-DEPARTMENT-052
The City of Jackson, through its Community Development agency, has issued solicitation 2026-DEPARTMENT-052 for the demolition of a commercial building and parking lots located at 300 Burr St. The scope of work includes the removal of structures and debris, asbestos abatement, and comprehensive site restoration, including grading and greening to blend with surrounding properties. The contract will be awarded to the lowest responsible contractor who meets all licensing requirements, specifically a demolition license for Residential Builders or Maintenance Alteration with an R-Home Wrecking classification. Bidders must submit their quotes via the e-Procurement Portal by October 27, 2026, including a completed pricing table, ethics disclosure form, and proof of licensing. Key contractual obligations include a one-year warranty on all materials and work, and a requirement to provide bonds, licenses, and environmental insurance within ten days of the award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet the completion date, though extensions may be granted for winter weather provided a rough grade is installed by December 30 and final restoration is completed by May 1, 2027. The City maintains an opt-out clause allowing the removal of parcels from the award with limited reimbursement to the contractor. Compliance with Equal Employment Opportunity certifications and HUD Section 3 regulations for contracts exceeding 100,000 dollars is mandatory. Payment is processed bi-weekly upon approval by the Department of Neighborhood and Economic Operations, provided invoices contain detailed line items for grading, greening, demolition, and asbestos abatement.
Community Development

POSTED

about 11 hours ago

DEADLINE

in 7 days

General Info

Contract Value

$7,500

NAICS

238910 - Site Preparation Contractors

Place of Performance

Audubon Bend near Wynot, NE, WYNOT, NE, USA

Set-Aside

SBA

Award Issued Date

Documents

2

RFQ.pdf

PDF

Well_Decomm_Technical_Exhibits.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Monica DwyerPurchasing Agent
Matthew D. HibbertContracting Officer

Full Description

Show more
PERFORMANCE WORK STATEMENT (PWS) Well Decommissioning Services U.S. Army Corps of Engineers, Gavins Point Project 1.0 General Information 1.1 Scope of Work. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision and other items necessary to perform well decommissioning on U.S. Army Corps of Engineers (USACE) lands. This is a fixed priced, performance based service contract where desired outcomes are defined and measured while contractor methods are generally not constrained or directed. 1.1.1. Audubon Bend was purchased by USACE in 2009 as part of the Missouri River Recovery Program. This program is designed, in part, to restore and enhance biological diversity associated with the Missouri River. Audubon Bend is comprised of 2,372 acres adjacent to the Missouri River with approximately 4 miles of riverfront. Upon purchase, approximately 80% of the property was cultivated. Each year USACE converts a portion of the cultivated area into native habitat. Currently, approximately 32% of the property is cultivated, 20% is wooded, and 48% is young woodland and prairie restoration plantings. 1.2 Contractor Personnel 1.2.1 The Contractor shall perform all work under this contract with his own forces except as provided in Paragraph 1.2.2.2 Subcontracting. Employees who perform this work shall be qualified persons on the Contractor's own payroll. 1.2.2 All Contractor vehicles shall be registered, licensed and insured to meet all State and local laws. 1.2.2.1 The Contractor employees shall be skilled in and capable of performing the work under this contract. All employees of the Contractor or subcontractor shall be 18 years of age or older. 1.2.2.2 Subcontracting. No work may be subcontracted without written approval of the COR. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the Contractor. 1.2.3 Security Requirements. Physical security at various project locations is subject to change with very little notice. When advised by the COR, the Contractor employees and subcontractors shall comply with any and all changing requirements. Such changes may reduce access to certain areas under this contract. 1.3 Quality Control 1.3.1 The contractor shall designate, in writing, a member of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew. The employee (s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to insure that the required work is performed in accordance with the specifications and standards contained herein. The contractor shall furnish the above written designation to the Contracting Officer's Representative at the project no later than the first day of work. The contractor shall include the name(s), address(es), and telephone number(s) of the responsible individual(s). 1.3.2 The Contracting Officer reserves the right to disapprove any individual whom he considers to be incompetent to perform the work required. Such disapproval's will be given to the contractor by written notice. 1.4 Quality Assurance 1.4.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not unduly delay the work. 1.4.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed. 1.4.3 If the contractor fails to promptly perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements, the government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part. 1.5 Pre-Work Meeting. Prior to commencing any activities, the Contractor shall arrange a Pre-work Meeting with the COR. The Meeting shall discuss the work to be performed, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and abbreviated Accident Prevention Plan (APP). At least two (2) days prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR. 1.6. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the COR for review and approval: a. Activity Hazard Analysis (AHA); b. Abbreviated Accident Prevention Plan (APP) c. List of who will perform work on this contract; d. Proof of Insurance for Contractors and Subcontractors; 1.7 Hours of Operation 1.7.1 The Contractor is responsible for conducting business, Monday thru Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings, unless approved in advance by the COR. 1.8 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract and to comply therewith. Applicable regulations to this work included, but are not limited to the following: a. The State of Nebraska, Title 178, Chapter 12 Standards (http://www.sos.ne.gov/rules-and-regs/regsearch/Rules/Health_and_Human_Services_System/Title-178/Chapter-12.pdf). b. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2-316.pdf?ver=2013-08-22-104526-670) c. Engineering Manual (EM) 385-1-1 (USACE - Safety and Health Requirements Manual), dated November 2014; 1.9 Safety. The local emergency phone numbers will be furnished to the Contractor by the COR. In addition to applicable Local, State, and Federal laws, the Contractor and their subcontractors are required to adhere to all provisions of the EM 385-1-1. Where safety standards conflict, the most stringent standard shall apply. A copy of the EM 385-1-1 can be found electronically at the following link: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf 1.9.1 Activity Hazard Analysis (AHA). The Contractor shall prepare AHAs IAW Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare AHAs IAW Figure 1-2. 1.9.2 Abbreviated Accident Prevention Plan (APP). It is understood that the EM 385-1-1 in its entirety may be too complex for the type of work being performed under these contracts, Contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific Abbreviated Accident Prevention Plan (AAPP). Prepare the AAPP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The Contractor shall sign and submit the APP for Government approval prior to the start of work onsite. 1.10 Environmental Protection. The Contractor shall perform all work in such a manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. 1.10.1 Protection of Resources. The Contractor shall not pollute streams, lakes or reservoirs with fuels, oils, bitumens, calcium chloride, acids, insecticides, herbicides or other harmful materials. The Contractor shall investigate and comply with all applicable Federal, State, County and Municipal laws concerning pollution of rivers and streams. 1.10.2 Spillage. Special measures shall be taken to prevent chemicals and other materials from entering public waters. If any spillage occurs, the Contractor shall remove the material and restore the area to its original condition. If necessary, contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the Contractor. 1.10.2.1 Disposal. Disposal of all materials shall be at the appropriate locations as directed by the COR. Disposal of any materials, wastes, effluent, trash, garbage, fuel, chemicals, etc., in areas adjacent to streams shall not be permitted. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the original condition before being disturbed. If necessary, contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the Contractor. 1.10.3 Equipment Accountability. The Contractor shall clean all equipment prior to entering Corps property. The equipment shall have not visible soil, roots, vegetative material, seeds, or other debris that could contain seeds. 1.10.4 Protection of Fish and Wildlife. The Contractor shall at all times perform work and take such steps required to minimize interference with or disturbance to fish and wildlife. The Contractor will not be permitted to alter water flows or otherwise disturb native habitat adjacent to the project area that, in the opinion of the Contracting Officer, are critical to fish or wildlife. 1.11 Physical Security 1.11.1 The Contractor shall be responsible for safeguarding all Government facilities, property and materials provided for Contractor use. All Government facilities, property and materials shall be appropriately secured at all times. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The Contractor shall abide by these changing conditions at all times. The Government is not responsible for the Contractor's equipment when stored on Government property administered by the USACE Gavins Point Project. 1.11.2 Key Control. The Contractor shall ensure all keys issued to the Contractor by the Government are not lost, stolen or duplicated and are not used by unauthorized persons. 1.11.2.1 The Contractor shall immediately report to the COR any occurrences of lost or stolen keys. 1.11.2.2 In the event keys, other than master keys are lost or stolen, the Contractor may be required, upon written direction of the COR, to re-key or replace the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the Contractor. If a master key is lost or stolen, the Government may need to replace all locks and keys for that system. The total cost of such replacement will be deducted from the monthly payment due the Contractor. 1.11.2.3 The Contractor shall prohibit the use of keys issued by the Government by any persons other than the Contractor's employees. The Contractor shall not facilitate access of secured areas to persons other than Contractor personnel or subcontractors engaged in performance of contract work requirements. 2.0 Definitions. The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement. Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot that can be considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service. Contracting Officer's Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Daily Duties: To be performed each day facilities are serviced. Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise. Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement. 3.0 Specific Tasks 3.1 Basic Services. The Contractor shall provide well decommissioning services for six (6) irrigation wells at Audubon Bend. Well decommissioning will meet State of Nebraska standards. Wells are located within or along the edges of natural areas (Technical Exhibit 2). The Contractor shall make every effort to minimize damage to surrounding habitat in natural areas when accessing and decommissioning the wells. The Contractor will complete all services between May 14, 2018 and September 30, 2018. 3.1.1. Audubon Bend is located near Wynot, Nebraska in Cedar County. 3.1.2 Irrigation Well Related Equipment. In the case that pumps, switches, pivots, or any other irrigation related equipment are still attached to a well or located in the immediate area surrounding a well that the Contractor needs to access, the Contractor is responsible for coordinating removal of the equipment by the property owners through the COR. 3.2 Description of Work Areas 3.2.1 Well Location A. Location A is a covered well along the edge of a dirt road. See Attachment 1 (Technical Exhibit 3). 3.2.2 Well Location B. Location B is a sealed well within a grassland that contains scattered young cottonwood trees. The area is mostly flat ground with a few gentle slopes. See Attachment 1 (Technical Exhibit 4). 3.2.3 Well Location C. Location C is a sealed well within a grassland. The area is mostly flat ground. See Attachment 1 (Technical Exhibit 5). 3.2.4 Well Location D. Location D is a covered well within a grassland, within about 30 feet of location C. See Attachment 1 (Technical Exhibit 6). 3.2.5 Well Location E. Location E is a covered well within a grassland. The area is flat ground with a few gentle slopes. See Attachment 1 (Technical Exhibit 7). 3.2.6 Well Location F. Location F is a covered well within a crop field that will be planted to prairie in the spring of 2018. The area is mostly flat ground. See Attachment 1 (Technical Exhibit 8). 4.0 Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. Performance Objective Standard Performance Threshold Method of Surveillance PRS # 1. The Contractor shall provide well decommissioning services for 6 irrigation wells at Audubon Bend in accordance with the PWS. Contractor shall decommission all wells in accordance with The State of Nebraska, Title 178, Chapter 12 Standards. Zero deviation from standard. Random direct inspection.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS