This Solicitation opportunity from Florida was posted on October 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Well Rehabilitation and Maintenance
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Pompano Beach is seeking bids to establish a firm, fixed-price, term contract for Well Rehabilitation and Maintenance services for its Water Utilities department. The solicitation, identified as ITB25-56, was posted on October 9, 2025, with a response deadline of November 19, 2025. The project encompasses comprehensive well maintenance activities, including the rehabilitation and servicing of wells across various wellfields, supported by detailed technical specifications, maps, and well database information. Bidders must be registered on the City’s eBid System to access the full solicitation documents, which are available for free download, and are required to submit their proposals electronically before the specified deadline. A pre-bid conference is scheduled for October 21, 2025, and the City emphasizes strict compliance with communication restrictions during the solicitation period, including the Cone of Silence policy, to ensure fair competition. The contract will cover a range of services such as labor, materials, equipment, and specialized activities like drilling, site restoration, and report preparation, with payment structured through lump sums and unit prices for specific bid items. Supporting documents include technical specifications prepared by Stantec Consulting, detailed maps and well data, bid bond forms, and insurance requirements, all designed to ensure clarity and compliance. The scope also involves adherence to safety, legal, and regulatory standards, with provisions for performance bonds and references to general conditions governing the contractual relationship. Overall, the procurement aims to secure reliable, cost-effective well maintenance services to support the City’s water infrastructure, with a focus on transparency, competitive bidding, and compliance with applicable laws and policies.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
12AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Bonniebrook Water Service Lateral ReconnectionOpen now, due in 31 days
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Proposers must be registered on the City’s eBid System to view the solicitation documents and respond to this solicitation. The complete solicitation document can be downloaded for free from the eBid System at https://pompanobeachfl.ionwave.net/. The CITY will consider the submittal of a bid as constituting an offer by the Bidder to perform the required services at the prices stated herein. The City is not responsible for the accuracy or completeness of any documentation the Bidder receives from any source other than the eBid System. The Bidder is solely responsible for downloading all required documents. Responses will be electronically unsealed in a public forum and read aloud.
Bids must be submitted electronically at https://pompanobeachfl.ionwave.net, referred to hereinafter as the eBid System, on or before the date here stated. Proposals received after 2:00:00 P.M. ET on the due date will not be considered, and late bids will not be accepted.
The Cone of Silence shall take effect once this solicitation is released to the General Public. Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72 hours following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.” [F.S. 287.057 (25)].
Any bidder or lobbyist for a bidder is prohibited from having any communications concerning any solicitation for a competitive procurement with any member of the City Commission, City Clerk, City Manager’s Office, any Evaluation Committee Member, or any other City of Pompano Beach employee after Procurement and Contracts releases a solicitation to the General Public. All communications must go through the eBid System or the Purchasing Agent assigned to this solicitation in the Procurement and Contracts Department. No other member of the City Commission, City Clerk, City Manager’s Office, any Evaluation Committee Member, or any other City of Pompano Beach employee should be contacted concerning this ITB. Any information that amends any portion of this ITB received by any method other than an Addendum issued to the ITB is not binding on the City of Pompano Beach.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
