Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wellington Breakwater West Foundation Cap and Tower Replacement

Closed
30007738Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves replacing an existing 20-foot "Claymar" tower located at the LL490.5 Wellington Breakwater West site. This project requires the installation of a new, similar 20-foot "Claymar" tower, along with the construction of a new concrete cap to level and stabilize the existing concrete foundation, which is currently leaning. The scope of work includes removing the old tower, fabricating and installing the concrete cap with rebar dowels to tie it to the foundation, setting up formwork, and installing anchor bolts for the new tower. Additionally, the new tower must be transported from the CCG Prescott Base to the site and installed on the new foundation hardware. The project also involves placing Rip-Rap around the foundation to match the existing breakwall structure. This solicitation, issued by the Department of Fisheries and Oceans under the Government of Canada, is aimed at meeting the Canadian Coast Guard’s operational requirements. The opportunity was posted on March 12, 2026, with a response deadline of March 30, 2026. Interested contractors must provide all necessary labor, materials, and equipment to complete the project in accordance with the specifications outlined. The contracting authority for this solicitation is Terri Jones, who can be contacted via email or phone for further information. The work will take place in Ottawa, Canada, and the contract ensures the structural integrity and functionality of a critical navigational aid within the breakwater system.

General Info

Replace 20-foot Claymar tower at Wellington Breakwater West, install concrete cap, Rip-Rap placement.

Agency

Government of Canada → Department of Fisheries and Oceans

NAICS

238110 - Poured Concrete Foundation and Structure Contractors View NAICS

Place of Performance

Canada, CAN

Set-Aside

NONE

Documents

(2)

RFQ 30007738 Wellington Breakwater West Foundation Cap and Tower Replacement

PDFrfq

Solicitation 30007738 - Request for Qualifications for Wellington Breakwater Project

PDFsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Fisheries and Oceans
Office AddressN/A
Contacts
Terri JonesContracting Authority

Full Description

Show more
Canadian Coast Guard (CCG) has a requirement to replace an existing 20’ “Claymar” tower at the LL490.5 Wellington Breakwater West site. As part of this replacement, a new concrete cap is required in order to level out the existing concrete foundation which is currently leaning. New tower shall be a 20’ “Claymar” tower of similar likeness to the existing. Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: • Removal of existing “Claymar” Tower • Supply and installation of concrete cap onto existing foundation including; a) Supply and installation of rebar dowels to tie existing foundation to concrete cap b) Supply and installation of formwork 4” above highest point of existing concrete cap • Supply and installation of anchor bolts for new “Claymar” tower; • Transport new “claymar” Toer from CCG Prescott Base to site; • Install new “Claymar” Tower onto new anchor bolts; • Installation of Rip-Rap to match existing breakwall, around existing foundation.